© «Samruk-Green Energy» LLP BRIEF COMPANY OVERVIEW March 2013 «Samruk-Green Energy» LLP Bagdat Oral Project Manager.

Similar presentations


Presentation on theme: "© «Samruk-Green Energy» LLP BRIEF COMPANY OVERVIEW March 2013 «Samruk-Green Energy» LLP Bagdat Oral Project Manager."— Presentation transcript:

1 © «Samruk-Green Energy» LLP BRIEF COMPANY OVERVIEW March 2013 info@samruk-green.kz www.samruk-green.kz «Samruk-Green Energy» LLP Bagdat Oral Project Manager b.oral@samruk-green.kz

2 © «Samruk-Green Energy» LLP Company profile 2  Company was established in January 25, 2012 (Astana, Kazakhstan)  Mission - is a reliable and high-quality supply with electric power produced from renewable energy sources.  Vision - is the Company’s formation as a leader in the field of renewable energy sector in Kazakhstan.  100 % subsidiary company of «Samruk-Energy» JSC, a national power company (www.samruk-energy.kz )www.samruk-energy.kz

3 © «Samruk-Green Energy» LLP Parent company information 3  “Samruk-Energy” JSC was established on 18th April 2007 and officially registered on 10th May 2007;  100% of equity is fully owned by “Sovereign Wealth Fund “Samruk-Kazyna” JSC;  The group incorporates 22 entities and is a vertically integrated electricity provider, operating within the borders of Kazakhstan. Its key focus areas are:  Generation of electric and thermal power (71% thermal energy and 29% hydro energy)  Transmission and distribution of electric power  Supply  Coal mining  Reconstruction, expansion and construction of power generating facilities and units  “Samruk-Energy” JSC controls 40% of the electricity generation in Kazakhstan and is strategically important for the national economy.

4 © «Samruk-Green Energy» LLP Main activities 4 WIND BIOMASS SOLAR CURRENT PROHECTS IN PERSPECTIVE GEOTHERMAL ASSEMBLY AND PRODUCTION OF SMALL SCALE WIND TURBINES GARBAGE UTILISTAION WITH ELECTRICITY PRODUCTION SMALL SCALE HYDRO POWER

5 © «Samruk-Green Energy» LLP Current projects 5 №PROJECT TITLECAPACITY, MW 1Wind farm in the Shelek corridor, Almaty Region.60/300 2Wind farm in Yereimentau city, Akmola Region50/300 3 Solar Power Plant in Kapshagai city, Almaty Province. 2 4 Solar Power Plant within the framework of the Agreement between the Governments of Kazakhstan and China 1 5 Wind Power Plant within the framework of the Agreement between the Governments of Kazakhstan and China 5

6 © «Samruk-Green Energy» LLP Projects related to the acquisition of assets and JVs’ establishment 6 №PROJECT TITLECAPACITY, MW 1Construction of small scale hydro power plant “Bartogai 27” 13 2Construction of small scale hydro power plant “Bartogai 28” 20 3Establishment of a Joint Venture (with KD Stahl- und Maschinenbau GmbH, Germany) on production of small scale wind turbines - 4Establishment of a Joint Venture on assembly of products with light-emitting diodes - 5Establishment of a joint venture (with Office Privée, United Kingdom) on construction of the power plant using straw in energy production 5-10

7 © «Samruk-Green Energy» LLP Construction of 60 MW capacity WPP in Shelek with the perspective of expansion up to 300 MW 7 Period of realization 2011-2016 Number of workplaces During the operation – 12 Completed actions:  Feasibility study of the Project is completed (December 2012);  Land plot is allocated;  A scheme of electric power distribution is developed and agreed.  Technical specification for grid connection is obtained. Planned activities  Obtaining the State expertise’s approval

8 © «Samruk-Green Energy» LLP 8 Period of realization 2011-2016 Number of workplaces During the operation – 10 Completed actions:  Feasibility study of the Project is completed.  State expertise approval is obtained.  A scheme of electric power distribution is developed and agreed. Planned activities  Approve the feasibility study and the tariff in Ministry of Industry and New Technologies  Organization of financing Construction of 50 MW WPP with the perspective of expansion up to 300 MW

9 © «Samruk-Green Energy» LLP 9 Period of realization 2011-2013 Number of workplaces During the operation – 5 Completed actions:  Feasibility study of the Project is completed.  State expertise approval is obtained.  A land plot is allocated.  A scheme of electric power distribution is developed and agreed.  Construction of the SPP has started Planned activities  Commissioning of the plant and obtaining the State acceptance committee Act Construction of 2 MW capacity SPP in Kapshagai city

10 © «Samruk-Green Energy» LLP Hydro power plant projects on Bartogai 10 Completed actions:  Investment-Innovation Council of «Samruk-Energy» JSC has approved the realization of pre-investment stage of the Project by acquisition of the share capital of “Zharyk Su Ltd” LLP;  The obtaining of land plots (2 and 3.1 hectares) for construction have been approved;  The contract for water use has been signed;  Technical review of the technical-economical analysis of the project is carried out; Planned activities  Acquiring the interest in the share capital of Project Company when the due diligence is completed;

11 © ТОО «Samruk-Green Energy» Using straw in electrical energy production 1 Completed actions:  Investment-Innovation Council of "Samruk-Energy“ JSC has approved the implementation of pre-investment stage of the Project;  Social-entrepreneurial corporation «Essil» has chosen 2 land plots in Akmola region of construction of plant;  Social-entrepreneurial corporation «Essil» has chosen potential suppliers of fuel; Planned activities  Project feasibility study development.

12 © «Samruk-Green Energy» LLP Assembly and production of small scale wind turbines 1212 Completed actions:  «Samruk-Green Energy» LLP and KD Stahl- und Maschinenbau GmbH has signed the Memorandum of cooperation;  Agreement of intent on possible sale of products with the "KazAgroFinance“ JSC is signed; Planned activities  Signing the Framework agreement on establishment of a joint venture;  Project Feasibility study development.

13 © «Samruk-Green Energy» LLP Perspective projects 1313 «Samruk – Energy» JSC and «Samruk-Green Energy» LLP are considering the possibility of developing following new projects: 1.Expansion of Kapshagay solar power plant up to 100 MW; 2.Construction of 45 MW Solar\Hydro mix station; 3.Construction of 300 MW solar power plant in the South Kazakhstan region.

14 © ТОО «Samruk-Green Energy» Thank You for your attention! March 2013 info@samruk-green.kz www.samruk-green.kz ТОО «Samruk-Green Energy»