July 20, 2007Anita Topkar, BARC PSD Production: Present Status Dr Anita Topkar BARC.

Similar presentations


Presentation on theme: "July 20, 2007Anita Topkar, BARC PSD Production: Present Status Dr Anita Topkar BARC."— Presentation transcript:

1 July 20, 2007Anita Topkar, BARC PSD Production: Present Status Dr Anita Topkar BARC

2 July 20, 2007Anita Topkar, BARC Strip detector production for fabricating 1000 micromodules has been completed Assembly of micromodules was launched in September, 2006 in the presence of Dr Anna Peisert, CERN Production of 1000 modules has been completed 870 modules have been shipped to CERN 130 modules are ready for dispatch

3 July 20, 2007Anita Topkar, BARC The first lot of 120 Nos of modules was shipped to CERN from BARC in Dec, 2007 The second lot of 300 and 450 modules has been shipped in March, 2007 from BEL The third lot of 130 Nos will be shipped in August, 2007

4 July 20, 2007Anita Topkar, BARC Reception tests were carried out on 120 modules (first lot) during CERN visit in Jan- Feb, 07 All detectors were tested for temperature cycling tests (-30 - +50C) Bonding tests were carried out on all detectors for checking quality of film and optimization of bonding parameters for ‘Indian Sensors’ The data of all tests carried out during assembly has been entered into the CRISTAL data base

5 July 20, 2007Anita Topkar, BARC Additional 100 detectors are to be supplied to CERN without assembly. The production of these detectors is underway at BEL

6 July 20, 2007Anita Topkar, BARC Micromodule Assembly Detector stability test and visual inspection Gluing on ceramic tiles Visual inspection, total current and stability test at ceramic level Gluing on Al tiles Visual inspection, total current and stability test at Al tile level

7 July 20, 2007Anita Topkar, BARC

8 July 20, 2007Anita Topkar, BARC Gluing of the detectors on jigs Gluing on the CeramicGluing on the Al Tile

9 July 20, 2007Anita Topkar, BARC Gluing on the Ceramics (Ten detectors at a time)

10 July 20, 2007Anita Topkar, BARC Gluing on the Al tiles (Ten detectors at a time)

11 July 20, 2007Anita Topkar, BARC Total leakage current of detectors after gluing on ceramic & Al tiles (First fifty modules - The sensors were fabricated in 2003)

12 July 20, 2007Anita Topkar, BARC First lot of mico modules made under the supervision of Dr Anna Peisert

13 July 20, 2007Anita Topkar, BARC Preshower Assembly: Schedule

14 July 20, 2007Anita Topkar, BARC Activities involved Front end PCBs, hybrid mounting Bare  module production Full  module production & testing – hybrid reception tests, wire bonding, pull test, functional testing Ladder production and testing – Ladder assembly,system mother board, functional testing, temp cycling Cosmic ray testing – Ladder for ES+ - Dee1 plane1, ES+ Dee1 plane2, ES+ Dee2 plane1, ES+ Dee2 plane2 Ladder for ES- ---- Cabling

15 July 20, 2007Anita Topkar, BARC Dee construction – Gluing Pb/Al/cooling screens,etc, Ladder mounting on Dees - ES+ - Dee1 plane1, ES+ Dee1 plane2, ES+ Dee2 plane1, ES+ Dee2 plane2 ES- -------- Mount each ladder on absorber plate Test each ladder using temporary cables Test full control ring of ladders Repeat till all ladders are mounted Final Dee construction Test full ES (cold) – ES+ and ES- Installation of ES+ Installation of ES-


Download ppt "July 20, 2007Anita Topkar, BARC PSD Production: Present Status Dr Anita Topkar BARC."