4/26/061 presents Project Crimson April 26, 2006 Sarah Grace Cade Harrelson Cochrane Jamison Libby Probst Justin Williams.

Similar presentations


Presentation on theme: "4/26/061 presents Project Crimson April 26, 2006 Sarah Grace Cade Harrelson Cochrane Jamison Libby Probst Justin Williams."— Presentation transcript:

1 4/26/061 presents Project Crimson April 26, 2006 Sarah Grace Cade Harrelson Cochrane Jamison Libby Probst Justin Williams

2 4/26/062 Overview Progress Major Cost Items Grading Erosion Control Storm Sewer System Sanitary Sewer System Water Distribution Paving Railroad Total Cost

3 4/26/063 Progress Since Preliminary Report Water Distribution System Design and Analysis Sanitary Sewer Systems from Spec Building and Building on Site Storm Sewer and Detention Pond for 100 Year Flood Event Added Easier Fire Truck Access to the Building Erosion Control Fire Protection Cost Estimate Modified Elevations of Proposed Grading in Order to Cut Down on Net Cut and Fill Volumes

4 4/26/064 Major Cost Items

5 4/26/065 Grading REC efficiently raised certain elevations on site in order to cut down on the amount of net cut Grading Cost Items Include: Clearing and Grubbing Top Soil Stripping Unclassified Excavation Removing Unsuitable Material Top Soil Replacement

6 4/26/066 Grading Estimates Clearing and Grubbing: 2 acres Top Soil Stripping: 97,389 c.y.i.p. Unclassified Excavation: 7,008 c.y.i.p. Top Soil Replacement: 2 acres Removal/Stockpile Unsuitable Materials: 15,000 c.y.i.p $ 5,000 $ 438,250.50 $ 70,080 $ 4,040 $ 60,000

7 4/26/067 Erosion Control Silt fences and hay bales Necessary to prevent erosion on site during construction Protects adjacent properties from erosion damage Length of silt fence required: 14,800 l.f. Number of hay bales required: 30 bales

8 4/26/068 $ 445,770 $ 145,740 $ 211,140 $ 7,200 Storm Sewer System Pipes Curbs and gutters Drains and Inlets Manholes and Covers Detention Pond * included in excavation costs

9 4/26/069 Sanitary Sewer System Manholes – 48” dia. * Includes rings and covers $ 18,535 Reinforced Concrete Pipe 12” dia. $ 60,900 Connection to Existing Manhole $ 500 Pump and Pump Station $ 75,000 4” PVC Force Main $ 58,800

10 4/26/0610 Water Distribution 16” Ductile Iron Water Main $ 272,800 16” Valve and Valve Box $ 4,800 1.5” Water Meter $ 500 6” Fire Meter $ 8,000 6” Fire Hydrants $ 22,000

11 4/26/0611 Paving Costs Includes all pavement for roads and parking lots Includes preparation of sub-grade Truck Parking and RoadwayEmployee Parking Crushed Aggregate Base$ 309,408Crushed Aggregate Base$ 86,211 Bituminous Base$ 234,400Bituminous Base$69,525 Bituminous Binder$ 14,064Bituminous Binder$5,562 Bituminous Surface$ 234,400Bituminous Surface$ 69,525 Subgrade Preparation Cost: $97,500

12 4/26/0612 Railroad Track Costs Sub-Ballast (in place, compacted)$ 104,000 No. 10 Turnout$35,000 Unload, Assemble No. 10 Turnout$8,000 115 lb. Rail, Ties, Ballast, and Fabric (in place) $276,750 Bumper Post$4,660 Crossbuck and Post$800 Derail Switch Relocation$3,000

13 4/26/0613 Total Estimated Cost Total Estimated Cost for Project Crimson: $4,417,303.55 Please refer to your handout for the complete cost estimate, unit prices, and amounts of each unit used on site.

14 4/26/0614 Civil Engineers Tuscaloosa, Alabama