Wastewater treatment plant and Drainage System projects in Colombia

Similar presentations


Presentation on theme: "Wastewater treatment plant and Drainage System projects in Colombia"— Presentation transcript:

1 Wastewater treatment plant and Drainage System projects in Colombia
Sirly Castro Tuirán Water and Sanitation Deputy Director National Planning Department, Colombia October 2013

2 Index PPP Law – Legal framework Water and Sanitation overview
Wastewater Treatment Plants Sustainable Urban Drainage System - SUDS

3 Private Public Partnership in Colombia Infraescope Index* -2013
Investment Climate Financial facilities Quality of regulatory framework * Index developed by the Economist Intelligence Unit under the auspices Multilateral Investment Fund of the IDB, to evaluate the ability of 19 countries of Latin America and the Caribbean to develop and implement PPPs in the transport, water, sanitation and electricity Source: Economist Intelligence Unit - The Economist 2012

4 4. Governmet paymets are subject to service availability

5 Index PPP Law – Legal framework Water and Sanitation overview
Wastewater Treatment Plants Sustainable Urban Drainage System - SUDS

6 Institutional Structure
Presidency Ministry of Housing, City and Territory National Planning Department Regulatory Commission of W&S Public Service Utilities Superintendence National level Regional level Environmental Authorities Departments (32) Local level Municipalities (1102) Water and Sanitation Service Utilities ( oficially)

7 Where are we? Private participation – Water and Sanitation
Public-Private Partnership Law (1508/12) Friendly Cities (Visión Colombia 2019) Private Participation in Public Services (Conpes 3385/05) Departmental Water Plans (Conpes 3463/07) Policies and Strategies for Public Private (Conpes 2912/07) Business Modernization Program -2000 Public Service Law (Ley 142) Private sector involvement in the provision of public water services has been growing Source: DNP, SSPD

8 Where are we? Urban coverage Rural coverage
With alternative solutions* *Alternative solutions in Drinking Water: Aqueduct, well, public tap water supply Sanitation: Sewerage, septic tank and latrine * Drinking water refers to the service that is provide only by an aqueduct Urban population: inhabitants Rural population: inhabitants Source: DANE - ECV 8

9 Wastewater Treatment (%)
Where are we? Wastewater Treatment (%) National Source: DNP, MVCT

10 Index PPP Law – Legal framework Water and Sanitation overview
Wastewater Treatment Plants Sustainable Urban Drainage System - SUDS

11 INVESTMENT (2014 – 2020) = ~ $1.1 billion
ATLANTIC OCEAN BOGOTÁ D.C. Manizales Cali PACIFIC OCEAN Canoas WWTP (Bogotá) Salitre WWTP (Bogotá) Cañaveralejo WWTP (Cali) Pereira wastewater management Project Manizales wastewater management Project Pereira TOTAL INVESTMENT USD $1.6 billion INVESTMENT (2014 – 2020) = ~ $1.1 billion

12 Wastewater Treatment Plant
BOGOTÁ D.C. CANOAS Wastewater Treatment Plant

13 The Canoas WWTP will treat an average flow of 14 m3/sec
CANOAS Wastewater Treatment Plant N The Canoas WWTP will treat an average flow of 14 m3/sec Source: EAAB

14 Investment: USD $ 580 million Investment: USD $ 550 million
CANOAS Wastewater Treatment Plant First Phase Primary Treatment To remove 30% of BOD (Biochemical Oxygen Demand) 40% of TSS (Total Suspended Solids) Investment: USD $ 580 million Second Phase Secondary Treatment Using activated sludge Investment: USD $ 550 million The Canoas WWTP will treat an average flow of 14 m3/sec Financial resources: National, regional and local government Source: EAAB

15 Time Chart - Preliminary Operation and Maintenance
CANOAS Wastewater Treatment Plant Time Chart - Preliminary First Phase Detailed Engineering (CDM) Bidding Process Building Period Operation and Maintenance Ending – To be defined 2011 2015 2016 2020 2025 Building Period / Operation and Maintenance Time: To be defined Bidding Process Starting – To be defined Second Phase Bid type: International Public Tender Source: EAAB

16 Wastewater Treatment Plant
SALITRE Wastewater Treatment Plant

17 BOGOTA D.C Canoas WWTP Salitre WWTP

18 Enlargement of the SALITREWastewater Treatment Plant

19 Thickeners (primary clarifier sludge) Grit and grease removal
Enlargement of the SALITREWastewater Treatment Plant Dewatering Lift Station Thickeners (primary clarifier sludge) Grit and grease removal

20 Final design and bidding process Operation and Maintenance
Enlargement of the SALITREWastewater Treatment Plant Technical Description: Enlargement to 8m3/sec (from4m3/s) - secondary treatment (using activated sludge) Investment: USD $320 million Time Chart: Preliminary 2009 2013 Final design and bidding process Operation and Maintenance 2014 2018 Building period Basic Engineering Bid type: International Public Tender Entity in charge: Cundinamarca Environmental Authority (CAR) - Bogota Water and Sanitation Utility(EAAB) (Operation) Source: Aguas y Aguas de Pereira

21 Wastewater Treatment Plant
CALI CAÑAVERALEJO Wastewater Treatment Plant

22 Enlargement of the CAÑAVERALEJO Wastewater Treatment Plant
South Channel Navarro Landfill Calle 48 Channel Cali Autopista No 1 Channel Secondary Channel Eastern Channel Puerto Mallarino DWTP Cauca River Cañaveralejo WWTP Cali Water and Sanitation Utility Type: Public Utility Population: 2,3 million inhabitants Source: EMCALI

23 Enlargement of the CAÑAVERALEJO Wastewater Treatment Plant
Primary Treatment (Already Built) Preliminary Treatment Primary Advanced Treatment Aeration Tanks Storage Biogas Purification Secondary Sedimentation Sludge Secondary Treatment Source: EMCALI

24 Enlargement of the CAÑAVERALEJO Wastewater Treatment Plant
Source: EMCALI

25 Enlargement of the CAÑAVERALEJO Wastewater Treatment Plant
Technical Description: Enlargement to 7m3/sec (from 5,65 m3/s) Secondary treatment (using activated sludge) – 50% of the wastewater produced in Cali Investment: USD $135 million Time Chart: Preliminary 2005 2013 Building Period Operation and Maintenance Ending – To be defined 2007 Prefeasibility and Feasibility Study (Cinara) 2014 Basic Design Hansel and Sawyer Detailed Engineering 2016 2019 Bid type: International Public Tender Entity in charge: EMCALI Source: EMCALI

26 Wastewater management Plant
PEREIRA Pereira Wastewater management Plant

27 PEREIRA Wastewater management Plant
Sludge Pumping Station Primary Flow Distribution Chamber Administrative Building Sludge Digesters Workshop Courtyard Building and Sludge Dewatering Sludge Storage Building and Polymer Dosing Gas Storage Tank Gas Burners Storage Tank and Pumping of Sludge Primary Clarifiers Otun River Pereira Water and Sanitation Utility (Aguas y Aguas de Pereira) Users: inhabitants Type: Joint enterprise Source: Aguas y Aguas de Pereira

28 Operation and Maintenance
PEREIRA Wastewater management Plant Technical Description: The project includes Collection pipes and one WWTP (2.6 m3/sec with primary treatment). Investment: USD $34 million Time Chart: Preliminary 2003 2014 Detailed Engineering Building Period Operation and Maintenance Ending – To be defined 2005 Feasibility Study (Kim Ingeniería y Consultoría - Montgomery Watson Harza - INGESAM Ltda) 2015 Basic Design 2018 Bid type: International Public Tender Source: Aguas y Aguas de Pereira

29 Wastewater Management Plant
MANIZALES Manizales Wastewater Management Plant

30 MANIZALES Wastewater management Plant
First Phase Second Phase Third Phase Fourth Phase Interceptors Builts Manizales Water and Sanitation Utility (Aguas de Manizales) Type: Joint enterprise Population: inhabitants Source: Aguas de Manizales

31 Prefeasibility and Feasibility studies Operation and Maintenance
MANIZALES Wastewater management Plant Technical Description: Includes the WWTP construction: initial capacity of 820 l/s and subsequent enlargement to 2 m3/s Investment: USD $47 million Time Chart: Preliminary Design Interceptors Arturo Gómez - Quasar – Aquaterra – Juan Bernardo Botero Prefeasibility and Feasibility studies (INGESAM Ltda) Detailed Engineering Building Period Operation and Maintenance Ending – To be defined 2005 2007 2010 2011 2012 2018 Bid type: International Public Tender Source: Aguas y Aguas de Pereira

32 Index Colombian Economic Outlook and PPP PPP Law and Way Forward
Water and Sanitation overview Sustainable Urban Drainage System - SUDS

33 TOTAL INVESTMENT (Preliminary)= USD $405 million
ATLANTIC OCEAN BOGOTÁ D.C. Barranquilla PACIFIC OCEAN Management of Urban Drainage (Barranquilla) 2. Storm Drainage Master Plan (Cartagena) 3. Storm Drainage Master Plan (Cúcuta) Cartagena Cúcuta TOTAL INVESTMENT (Preliminary)= USD $405 million

34 Management of Urban Drainage
BARRANQUILLA Barranquilla Management of Urban Drainage

35 (AGBAR, Aguas de Barcelona)
Management of Urban Drainage BARRANQUILLA Components of the project for the western watershed: Urban area Planning to Urban Flood Risk USD $ 20 million Urban Drainage USD $ 40 million Institutional strengthening US$ 5 mill Investment: US$65 mill Expansion Zone Eastern watershed Western watershed State of Progress: Terms of Reference for the Preparation of the Master Plan Storm (AGBAR, Aguas de Barcelona)

36 Storm Drain Master Plan
CARTAGENA Cartagena Storm Drain Master Plan

37 Cartagena Storm Drainage Master Plan
Construction of sand traps, channeling drains and rehabilitation of existing canal, detention pond designs in rural watersheds, construction of the perimeter dike, paving of channels y regularization paths. Urban area, Urban expansion area and Rural area of ​​the Northern Zone Investment: USD $ 180 million Storm Drainage Master Plan Source: Alcaldía Cartagena

38 Storm Drain Master Plan
CUCUTA Cúcuta Storm Drain Master Plan

39 Cúcuta Storm Drainage Master Plan
Watershed Rio Zulia Watershed Rio Pamplonita Watershed Rio Táchira The project includes the construction of canals, drains and collectors. Investment US$: 160 mill Fuente: Aguas Kpital Cúcuta SA ESP

40 Thank You PBX: