1 Telescope Optical Units (TOUs)
Overview of the TOU Team organization during PLATO 1.0 & TOU timeline and plans during phase B1/B2 TOU Team Meeting Catania 11 June 2014 Isabella Pagano (TOU PM)

2 TOUs during PLATO 1.0 organization
Payload Instrument System Coordinator P. Levacher PLATO Payload Management PIPM: P. Bodin Camera Management D. Laubier DPS Management B. Pontet TOU R. Ragazzoni ICU R. Cosentino Normal TOU R. Ragazzoni Normal DPU Ph. Plasson Fast TOU W. Benz Hardware & boot software M. Mas FPA/FEE D. Walton/M. Mas Application software Ph. Plasson Prototype & FM AIV P. Levacher Fast DPU G. Peter AEU S. Fredon Algorithms R. Samadi Catania, 11 June 2014 TOU Meeting

3 TOUs during PLATO 1.0 organization
N-TOU and F-TOU delivered by IT in the PLATO 2.0 plan

4 TOUs during PLATO 1.0 Our mandate
Provide optical – mechanical design performing as required by Science Compliant with the assigned budget Feasible in the due time Reliable in the given environments Catania, 11 June 2014 TOU Meeting

5 TOUs during PLATO 1.0 How we managed
A large team: INAF Padova Catania Milano Univ. Bern Stockolms Obs. Univ. Firenze Industrial Partners Selex Medialario-Sagem Seso RUAG APCO Technologies Catania, 11 June 2014 TOU Meeting

6 TOUs during PLATO 1.0 How we managed
A large team: INAF Padova Catania Milano Univ. Bern Stockolms Obs. Univ. Firenze Industrial Partners Selex Medialario-Sagem Seso RUAG APCO Technologies A huge number of meetings/telecons: TOU Team Bilateral TOU-System Teams TOU-FPA System Teams Catania, 11 June 2014 TOU Meeting

7 TOUs during PLATO 1.0 How we managed
Design (Optics, Mechanics, Thermal, ..) Demonstration Activities TOU AIV procedure TOU Optical and Thermal Performances TOU Optical Lenses Procurement Feasibility Studies TOU MAIT and Management Plan TOU optical coating plan TOU aspherical lens manufacturability & procurement plan TOU AlBeMet® Structure Procurement Plan Breadboard/Prototype Catania, 11 June 2014 TOU Meeting

8 BreadBoard/Prototype
“pre-breadboard” the structure built with off-the-shelf lenses used to test GSE and procedures to be used with the breadboard. “breadboard” the structure built to test alignment in warm and cold environment before the I-PRR “prototype” the structure built after the I-PRR, during the Phase B1 (in the PLATO 1.0 context) , obtained from the breadboard, replacing the L1 and L2 lenses. Catania, 11 June 2014 TOU Meeting

9 TOUs during PLATO 1.0 What we delivered - Officially
At I-PRR (deadline April 2011) PMC TOU plans Source: TOU Team - Date: 4 May 2011 PLATO TOU Project Management Plan: Source: Selex, 20 April PLATO TOU MAIT Plan: Source: Selex, 20 April 2011 PLATO aspherical lens (ref ed03): preliminary technical, management proposal – Source: Medialario/Sagem-Reosc, 3 May 2011 PLATO Coating - Source: Selex, 22 April 2011 PLATO TOU Design Report: Source: TOU Team, Date 18 April included in the 02_Payload-design-report_draft11.pdf Catania, 11 June 2014 TOU Meeting

10 TOUs during PLATO 1.0 What we delivered – Unofficially 1/2
Not included in any package to ESA but delivered to CNES and O. Piersanti (former ESA PM) between March and July 2011: CaF2 lens blank: Thermal Vacuum Test Report - Filename: PLATO-CAMTOLE-RP-154-CNES, Issue 1, Rev. 0, Date: Jul 21st 2011, Prepared by: H. Pasquier - delivered to Piersanti Vibration Test Report: L3 CaF2 Vibration Test Dummy - Filename: Test_509_PLATO_dummy_lens_mount__report.pdf - Authors: M. Greber, D. Piazza, K. Seiferlin, P. Christiansen, 20th Jun delivered to CNES and Piersanti PLATO TOU Breadboard/Prototype: Design and AIT Report filename: PLATO-INAF-TOU-RP-0013-issue02-rev0-2.pdf- Authors: J. Farinato, V. Viotto, D. Piazza et al., Issue 2, Rev. 0, Date: 13 Jul delivered to CNES and Piersanti Catania, 11 June 2014 TOU Meeting

11 TOUs during PLATO 1.0 What we delivered – Unofficially 2/2
AlBeMet® Structure Procurement Report - author "APCO Technologies” – delivered to CNES on May Study on the aspherical lens performed by RUAG - delivered to CNES oo 18 Jul 2011 Less relevant… PLATO TOU - Letter of Interest - author: SAGEM/REOSC - delivered to Osvaldo Piersanti (ESA) (March 2011) PLATO TOU - Letter of Interest - author: SESO - delivered to Osvaldo Piersanti (ESA) (March 2011) Catania, 11 June 2014 TOU Meeting

12 TOUs during PLATO 1.0 What we left open
Optical Design Consolidation see Magrin presentation for details Breadboard activities see Farinato et al. presentation for details Mechanical Design Finite Element Model of the current mechanical design, including evaluation of the first eigenfrequency. Interfaces Verification of the interfaces of the finite element model with the lenses and their effects. Filter design Engineering consolidation Catania, 11 June 2014 TOU Meeting

13 PLATO    TOU 2.0 Catania, 11 June 2014 TOU Meeting

14 PLATO 2.0 timeline – Phase B2 Jul 2014-Jan 2016
Premises Phase B1 kick-off: Jul 2014 Science Management Plan approval: Nov 2015 Payload Development and Consolidation Review: March 2015 SRR data package: 1 Nov 2015 SRR: completed by Jan 2016 Mission adoption & IPC approval: Feb-Mar 2016 Catania, 11 June 2014 TOU Meeting

15 PLATO 2.0 timeline – Phase B2C/D/E1 Q1 2016-Q1 2024
Premises Industrial ITT for Phases B2/C/D/E1: Apr-Sep 2016 Industrial Prime contractor kick-off: Oct 2016 System PDR: by 2017 (tbc) System CDR: by mid-2020 (tbc) Payload CDR by 2018 (tbc) Delivery of all Cameras: Q4 2021 PLATO Launch: Q1 2024 Catania, 11 June 2014 TOU Meeting

16 Phase B1: SRR Objectives 1/2
Premises PLATO Phase B1 objective is the adoption of the PLATO mission by SPC in Feb-March 2016. The PLATO System Requirements Review (SRR) to be completed by January 2016 is a major input to PLATO mission adoption. The SRR is a formal review (category 1 i.e organized by ESA inspector general, D/SRE is the chairman). The primary objective of the SRR is to review in detail: The final payload and spacecraft system specifications, The payload and spacecraft design definition, The payload and spacecraft development and verification program, Mission programmatic and cost. Catania, 11 June 2014 TOU Meeting

17 Phase B1: SRR Objectives 2/2
Premises The camera development schedule is critical, and is actually defining the schedule critical path for the spacecraft. Hence: The camera detailed design activities (including AIV plans and Ground System Equipment design) shall be completed before the SRR, The critical bread-boarding activities (e.g. electronics Demonstration Models, optics) shall be initiated during phase B1, Consortium input to the SRR shall demonstrate that the camera Engineering Model - which is fully representative of the flight model except for some electronics parts - will be completed by early 2017, A detailed development plan of the payload shall demonstrate by SRR that: serial production phase will start by mid-2017, the first batch of 8 cameras will be delivered in November 2020, the last batch of cameras will be delivered by November 2021. ?? Catania, 11 June 2014 TOU Meeting

18 TOUs during PLATO 2.0 Phase B1 goal
Our proposal: deliver all ready but undelivered documents: Design: Consolidated TOU Design Report (Optical Design, Mechanical Design, Thermal Analysis, Stray-light Analysis, Optical Material Analysis and Coating Design, ..) Breadboard: Consolidated BreadBoard AIV report NEW: including a critical review of results and assessment of some open issues CaF2 tests AIV Design: Consolidated TOU MAIT and Management Plan Consolidated AlBeMet® Mechanical Structure Procurement Assessment Study NEW: F-TOU Filters Design Procurement Assessment Study

19 TOUs during PLATO 2.0 Phase B2 goal
Design: Engineering of TOU Design (Optical Design, Mechanical Design, Thermal Analysis, Stray-light Analysis, Optical Material Analysis and Coating Design, ..) Breadboard  Prototype Lens set like the FM one (change of 2 lenses and replacement of one lens previously accepted with no conformance issue because short in time optical quality test (in term of PSF shape and dimension) on the whole FoV. AIV Design: Finalized TOU MAIT and Management Plan Finalized AlBeMet® Mechanical Structure Procurement Study Consolidated: F-TOU Filters Design Procurement Assessment Study Catania, 11 June 2014 TOU Meeting

20 When Industrial Prime Contractor?
Our proposal: During Phase B1, industry will deliver consult and services. We’ll work to have ASI delivers a ITT for Phase B2/C contract, not later than March 2015. Goal: TOU Prime Contractor at work at beginning of Phase B2, but clearly identified before the SRR. Catania, 11 June 2014 TOU Meeting