Download presentation
Presentation is loading. Please wait.
Published byNeal Bailey Modified over 8 years ago
1
Worldwide Symposium on Performance of the Air Navigation System, Montreal, 29 March 2007 1 RNA and RNAV and RNP Strategy in Japan Yoshiki Imawaka Director for International Policy Coordination ATS Systems Planning Division Civil Aviation Bureau, Japan ICAO Worldwide Symposium on Performance of the Air Navigation System Montreal, 26 - 30 March 2007
2
Worldwide Symposium on Performance of the Air Navigation System, Montreal, 29 March 2007 2 Current RNAV Procedures in Japan Implemented 50NM lateral and longitudinal separation minima (based on RNP10) over NOPAC and CENPAC since 1998 and 2006, respectively Established three RNAV routes in 1992 Implemented 60 RNAV routes as of March 2007 Oceanic Airspace En Route Established FMS arrival route in Tokyo (Haneda) in 1999 Expanded to five other airports since 2004 Established RNAV (GNSS) approaches with Baro-VNAV at selected airports Terminal Area Approaches
3
Worldwide Symposium on Performance of the Air Navigation System, Montreal, 29 March 2007 3 Background Growing traffic demands JCAB has predicted that air traffic in Japan will increase by 34 percent from 2005 to 2017 New runways at airports in Asia Fuel savings and reduce noise Reduce fuel, reduce emissions and reduce noise High performance aircraft Increased number of aircraft equipped with multifunctional FMS and GPS
4
Worldwide Symposium on Performance of the Air Navigation System, Montreal, 29 March 2007 4 Capacity and Efficiency 52 Restructuring of ATS routes and airspace Flexible use of airspace RNAV Reduction of separation minima Procedures In order to accommodate growing traffic and increase efficiency, new capabilities should be introduced. New capabilities will employ a combination of procedures and systems, such as a restructuring of ATS routes/airspace, and ATC support tools, which would increase controller capability and reduce workload. New ATC workstations with controller support tools Data link (ADS/CPDLC) GNSS Systems
5
Worldwide Symposium on Performance of the Air Navigation System, Montreal, 29 March 2007 5 JCAB Initiatives Developed “RNAV Roadmap for Japan” in April 2005. Decided on an evolutionary implementation of RNAV procedures in Japan, and to continue working collaboratively with the operators on the implementation. Established RNAV Implementation Team in October 2005 for implementing RNAV according to the RNAV Roadmap. JCAB established a Steering Committee and Work Group in 2004 Composed of JCAB, operators, and aviation industry representatives The purpose was to review the current RNAV procedures, and develop an RNAV implementation plan for Japan
6
Worldwide Symposium on Performance of the Air Navigation System, Montreal, 29 March 2007 6 JCAB Study 4.Reviewed procedures currently available and identified procedures to be developed Certification, Operational Approvals, Design Criteria, ATC Procedures, and Flight Inspection 2.Studied current and forecasted aircraft equipage 3.Studied airspace and infrastructure 1.Reviewed current operations (en route and terminal) International Harmonization
7
Worldwide Symposium on Performance of the Air Navigation System, Montreal, 29 March 2007 7 Radar Coverage (above 15,000 ft MSL) Radar Coverage (above 30,000 ft MSL) RNAV Routes in Japan
8
Worldwide Symposium on Performance of the Air Navigation System, Montreal, 29 March 2007 8 RNAV Systems & Equipage GNSS (GPS, SBAS) DME/DME (two DME) VOR/DME (single VOR/DME) Self-contained navigation system (IRU, INS) Combination of above GPS+DME/DME+IRUDME/DME+IRU GPS (without IRU) Non-RNAV capability B-747 classic Surveyed commercial passenger/cargo aircraft registered in Japan
9
Worldwide Symposium on Performance of the Air Navigation System, Montreal, 29 March 2007 9 Know our aircraft Surveyed commercial passenger/cargo aircraft registered in Japan * Capable as determined by equipment only. Crew training is not considered
10
Worldwide Symposium on Performance of the Air Navigation System, Montreal, 29 March 2007 10 Know our airspace - 1 DME/DME, VOR/DME RNAV Total System Error 5NM 12,000 MSL 29,000 MSL 12,000 MSL 29,000 MSL DME/DME RNAV Total System Error 2NM
11
Worldwide Symposium on Performance of the Air Navigation System, Montreal, 29 March 2007 11 Know our airspace - 2 12,000 MSL 2,000 MSL 8,000 MSL DME/DME RNAV Total System Error 1NM
12
Worldwide Symposium on Performance of the Air Navigation System, Montreal, 29 March 2007 12 RNAV Roadmap Major issues considered International Harmonization Increase capacity; Tokyo 4th Runway and Kansai 2nd Runway Implementation Phase - 2007 : Introduction of internationally harmonized procedures 2008 - 2012 :Increase capacity and efficient operations 2013 - 2017, beyond :Future direction
13
Worldwide Symposium on Performance of the Air Navigation System, Montreal, 29 March 2007 13 RNAV Roadmap - 1 Implement RNAV5 routes as an interim step for radar airspace Operationally segregate between RNAV flights and VOR flights Implement RNP2 routes, and expand RNP2 routes to non-radar airspace Expect to mandate RNP2 above FL290 Reduce ATC complexity, Increase capacity, Improve efficiency En Route
14
Worldwide Symposium on Performance of the Air Navigation System, Montreal, 29 March 2007 14 RNAV Roadmap - 2 Implement RNAV1 SID/STARs for radar airports Airspace restructure at major airports Implement RNP1 SID/STARs for non-radar airports Expect to mandate RNP1 in mid-high density airports Terminal By 2009 RNAV will be available at major city pairs in Japan from departure to arrival. By 2012 RNAV will be available at most of the airports in Japan.
15
Worldwide Symposium on Performance of the Air Navigation System, Montreal, 29 March 2007 15 Evolutionary implementation of RNAV (GNSS) approaches with Baro-VNAV Implement RNP AR approaches at airports, where beneficial Approaches RNP AR approaches will increase runway access Increase runway access, Increase safety, Reduce noise RNAV Roadmap - 3
16
Worldwide Symposium on Performance of the Air Navigation System, Montreal, 29 March 2007 16 Japan Roadmap for RNP
17
Worldwide Symposium on Performance of the Air Navigation System, Montreal, 29 March 2007 17 Thank you for your attention E-mail: imawaka-y2ys@mlit.go.jp