Solvent Management Plan (SMP) Template in Slovenia Workshop on the exchange of practical experience with the implementation of the VOC Solvent Emissions.

Similar presentations


Presentation on theme: "Solvent Management Plan (SMP) Template in Slovenia Workshop on the exchange of practical experience with the implementation of the VOC Solvent Emissions."— Presentation transcript:

1 Solvent Management Plan (SMP) Template in Slovenia Workshop on the exchange of practical experience with the implementation of the VOC Solvent Emissions Directive 1999/13/EC 17-18 June 2010, Brussels REPUBLIC OF SLOVENIA MINISTRY OF THE ENVIRONMENT AND SPATIAL PLANNING ENVIRONMENTAL AGENCY OF THE REPUBLIC OF SLOVENIA Romana Stare and Veronika Tolar Šmid

2 Day 1 - Group B - Veronika Tolar Šmid.ppt VOC Directive 1999/13/EC Slovenian Competent Authorities : 1.Ministry of the Environment and Spatial Planning (MOP) (legislation) 2.Environmental Agency of the Republic of Slovenia (Agency) (implementation) 3.Inspectorate of the RS for the Environment and Spatial Planning (IRSOP) (enforcement)

3 Day 1 - Group B - Veronika Tolar Šmid.ppt Tasks of Agency 1.Authorisation, registrations of VOC installations 2.Notification of the Reduction Schemes 3.Collecting and checking data on solvent management plans 4.Maintaining database of VOC installations / emissions 5.Informing the Environmental Inspectors about non-compliance 6.Informing the Public (http://www.arso.gov.si/zrak/emisije)http://www.arso.gov.si/zrak/emisije 7.Provide data for reporting to the Commission

4 Day 1 - Group B - Veronika Tolar Šmid.ppt Slovenian VOC installations 244 installations activity (installations): 1 (4), 3 (7), 4 (3), 5 (17), 6 (8), 7 (1), 8 (35), 9 (1), 10 (24), 11 (113), 14 (2), 16 (14), 17 (7), 18 (1), 19 (1), 20 (6) 61 installations using Reduction Scheme 9 installations covered by IPPC Directive

5 Day 1 - Group B - Veronika Tolar Šmid.ppt SMP template - basic SMP template is prepared as a web-form Made with Microsoft tools and Visual Basic studio 2003 User name (UN) and Password (PW) for each operator Not used for dry cleaning

6 Day 1 - Group B - Veronika Tolar Šmid.ppt SMP template Deadline for SMP reporting to Agency: 31 th March each year Web form on: http://193.77.124.144/

7 Day 1 - Group B - Veronika Tolar Šmid.ppt Web form - step 1 Among different reports operator may find VOC report VOC report

8 Day 1 - Group B - Veronika Tolar Šmid.ppt Web form - step 2 Web form - step 2 Insert UN and PW Enter Operator enters user name and password

9 Day 1 - Group B - Veronika Tolar Šmid.ppt Web form - step 3 Operator may open all his previous data report (as read only): open

10 Day 1 - Group B - Veronika Tolar Šmid.ppt Operator makes duplicate of his previous year report Web form - step 4 35411-1/20092008 savedeleteduplicatePrint form Back to reports Add installation open General data on operator

11 Day 1 - Group B - Veronika Tolar Šmid.ppt Web form - step 5 General data on installation, stacks and VOC consumption editopen Step 5.1 Step 5.2

12 Day 1 - Group B - Veronika Tolar Šmid.ppt Web form - step 5.1 - waste gasses VOC concentracions measured in waste gasses from stack 1

13 Day 1 - Group B - Veronika Tolar Šmid.ppt Web form - step 5.2 - Web form - step 5.2 - VOC consumption Info on: u substances (search by name or by CAS number) u amount of consumption u possibility for adding other substances Choose from the list

14 Day 1 - Group B - Veronika Tolar Šmid.ppt Web form - step 5.2 - Web form - step 5.2 - VOC consumption After filling in all substances and their consumption, total VOC consumption (I1 – input) is calculated automatically!

15 Day 1 - Group B - Veronika Tolar Šmid.ppt Web form - step 6 – mass balance ▪ Data on input – output ▪ Automatic calculations (F, E, target emission) ▪ Automatic input = output checks Check: input =output Automatic calculation fill in

16 Day 1 - Group B - Veronika Tolar Šmid.ppt Web form - step 7 – finish Print form with operator signature Mass balance is finished when print form comes to Agency If print and e-form is the same & if there is no incompleteness  Agency locks up the report E- form  by filling in the web page application, our VOC database is filled up automatically

17 Day 1 - Group B - Veronika Tolar Šmid.ppt VOC Database (in ACCESS) for competent authority Used for: analyses, checking compliances, registrations Contains: data from 2004

18 Day 1 - Group B - Veronika Tolar Šmid.ppt VOC Database Data about operator and installations General info Installations Operator’s Notes Agency’s Notes Registration data

19 Day 1 - Group B - Veronika Tolar Šmid.ppt VOC Database VOC consumption Sumary data for each activity stacks

20 Day 1 - Group B - Veronika Tolar Šmid.ppt VOC Database Data on the installation and its SMP

21 Day 1 - Group B - Veronika Tolar Šmid.ppt SMP template - advantages Advantages for operators: -List of VOC (with CAS number, name, R phrases), list of activities with thresholds -Duplicate for next year -Automatic calculations of E, F -Checking compliance with target emissions, checking input=output balance Advantages for Agency: -Automatic input to VOC database -Swift checks of compliance and data consistency -Detailed info on VOC use

22 Day 1 - Group B - Veronika Tolar Šmid.ppt List of VOC and list of activities

23 Day 1 - Group B - Veronika Tolar Šmid.ppt Use of Monitoring To check compliance with the waste gas emission limit values To determine waste gas emissions (O1) (concentration, flow, operating hours)

24 Day 1 - Group B - Veronika Tolar Šmid.ppt O1 – Emissions in waste gases Speciality: –O1 emissions in waste gases are divided into: treated waste gases O1.1 and untreated waste gases O1.2 –O1.2 in some activities accounted to F (in SMP template this is done automatically, after activity is chosen)

25 Day 1 - Group B - Veronika Tolar Šmid.ppt Monitoring Continuously (> 10 kg/h TOC) Periodic measurements: -Each year (> 2 kg/h TOC) -Every 3 years (> 0,5 kg/h TOC) -Every 5 years (> 0,1 kg/h TOC) minimum three 1-hour samples, taken during full operation of installation No monitoring (in case of Reduction Scheme)

26 Day 1 - Group B - Veronika Tolar Šmid.ppt Monitoring Accurate and representative measurements: Monitoring is performed by authorized organizations -Use of standard methods for measurements (sampling, chemical analyses, calibrations for continuous measurements) -Accreditation required Measurement sites should comply with standard SIST EN 15259