Download presentation
Presentation is loading. Please wait.
Published byAugust Walsh Modified over 8 years ago
1
Putting It All Together: Selection and Application of Low-Impact Development BMPs
2
Best Management Practices (BMPs) Structural ponds, wetlands, etc. Non-Structural grass swales, berms, etc. ordinances, regulations, etc.
4
BMP Selection Criteria Goals Physical Constraints Regulatory Constraints Public Acceptance Costs Schedule
5
BMP Selection - Goals Peak Runoff Control Runoff Volume Control Water Quality Nutrients Bacteria Metals Flood Control
6
BMP Selection – Physical Constraints Available Land Soils Slopes Vegetation Wetlands Sensitive Areas
7
BMP Selection – Regulatory Constraints Ordinances Zoning Subdivision Stormwater Management Regulations and Regulators Design Criteria
8
BMP Selection – Public Acceptance Health Issues Wetlands – West Nile disease Aesthetics Public Perception American Dream House
9
BMP Selection - Costs Construction Costs Maintenance Costs Loss of Income – Less units Increased Income – higher house prices
10
BMP Selection - Schedule Approvals & Permitting Public Acceptance Installation Constraints wetlands bioengineering
11
BMP Feasibility Criteria
12
Pollutant Removal Capacity
13
Benefits and Risks
14
END OF SEMINAR
Similar presentations
© 2024 SlidePlayer.com Inc.
All rights reserved.