Presentation is loading. Please wait.

Presentation is loading. Please wait.

Prepared by: C. Douglas Cloud Professor Emeritus of Accounting Pepperdine University © 2011 Cengage Learning. All Rights Reserved. May not be copied, scanned,

Similar presentations


Presentation on theme: "Prepared by: C. Douglas Cloud Professor Emeritus of Accounting Pepperdine University © 2011 Cengage Learning. All Rights Reserved. May not be copied, scanned,"— Presentation transcript:

1 Prepared by: C. Douglas Cloud Professor Emeritus of Accounting Pepperdine University © 2011 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license distributed with a certain product or service or otherwise on a password-protected website for classroom use. 1 Cost Management for Just-in-Time Environments Chapter 27 Student Version These slides should be viewed using the presentation mode (left click your mouse on the icon). Principles of Financial and Managerial Accounting Principles of Managerial Accounting Principles of Financial and Managerial Accounting Using excel for Success 11e © 2012 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license distributed with a certain product or service or otherwise on a password-protected website for classroom use. Prepared by: C. Douglas Cloud Professor Emeritus of Accounting Pepperdine University Reeve Warren Duchac

2 © 2012 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license distributed with a certain product or service or otherwise on a password-protected website for classroom use. Learning Objective 1 Describe just-in- time manufacturing practices.

3 © 2012 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license distributed with a certain product or service or otherwise on a password-protected website for classroom use.  Just-in-time processing (JIT), sometimes called lean manufacturing, is a philosophy that focuses on reducing time and cost, and eliminating poor quality. Just-in-Time Practices LO 1

4 © 2012 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license distributed with a certain product or service or otherwise on a password-protected website for classroom use.  Just-in-time (JIT) manufacturing views inventory as wasteful and unnecessary. As a result, JIT emphasizes reducing or eliminating inventory.  Under traditional manufacturing, inventory often hides underlying production problems.  JIT manufacturing attempts to solve and remove production problems. LO 1 Reducing Inventory

5 © 2012 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license distributed with a certain product or service or otherwise on a password-protected website for classroom use. Reducing Lead Time  Lead time, sometimes called throughput time, is a measure of the time that elapses between starting a unit of product and completing the unit of product. The lead time can be classified as one of the following:  Value-added lead time, which is the time spent in converting raw materials into a finished unit of product.  Non-value-added lead time, which is the time spent while the unit of product is waiting or being moved to the next production process. LO 1

6 © 2012 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license distributed with a certain product or service or otherwise on a password-protected website for classroom use. LO 1 Value-Added Ratio  The value-added ratio is computed as follows: Value-Added Ratio = Value-Added Lead Time Total Lead Time

7 © 2012 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license distributed with a certain product or service or otherwise on a password-protected website for classroom use. Reducing Setup Time LO 1  A setup is the effort spent preparing an operation or process for a production run. If setups are long and costly, the batch size (number of units) for the related production run is normally large.  Large batch sizes allow setup costs to be spread over more units and, thus, reduce the cost per unit.

8 © 2012 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license distributed with a certain product or service or otherwise on a password-protected website for classroom use. Reducing Setup Time LO 1 Automotive Components Inc. manufactures engine starters as follows: (continued)

9 © 2012 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license distributed with a certain product or service or otherwise on a password-protected website for classroom use. Reducing Setup Time LO 1 The total within-batch wait time is 936 minutes, as computed below: The total lead time is 985 minutes, as computed below: (continued)

10 © 2012 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license distributed with a certain product or service or otherwise on a password-protected website for classroom use. Reducing Setup Time LO 1 Based on the data in the preceding slides, the value-added ratio is approximately 2.4%, as computed below: Value-Added Ratio = Value-Added Lead Time Total Lead Time Value-Added Ratio = (7 + 9 + 8) minutes 985 minutes = 2.4% (rounded) Value-Added Ratio

11 © 2012 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license distributed with a certain product or service or otherwise on a password-protected website for classroom use. Reducing Setup Time LO 1 Automotive Components can increase its value- added ratio by:  reducing setups so that the batch size is one unit (termed one-piece flow), and  moving the Machining, Assembly, and Testing operation closer to each other.

12 © 2012 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license distributed with a certain product or service or otherwise on a password-protected website for classroom use. Emphasizing Product-Oriented Layout  If the manufacturing process is organized around a product, it is called a product- oriented layout (or product cells ).  If the manufacturing process is organized around a process, it is called a process- oriented layout. LO 1

13 © 2012 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license distributed with a certain product or service or otherwise on a password-protected website for classroom use. 1.Moving materials and products between processes  Just-in-time normally organizes manufacturing around products rather than processes. Organizing work around products reduces: 2.Work in process inventory 3.Lead time 4.Production costs LO 1 Emphasizing Product-Oriented Layout

14 © 2012 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license distributed with a certain product or service or otherwise on a password-protected website for classroom use. 1.Organizing employees into product cells. 2.Cross-training employees to perform any operation within the product cell. Emphasizing Employee Involvement  Employee involvement is a management approach that grants employees the responsibility and authority to make decisions about operations by: LO 1

15 © 2012 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license distributed with a certain product or service or otherwise on a password-protected website for classroom use. LO 1 Emphasizing Pull Manufacturing  Producing items only as they are needed by the customer is called pull manufacturing (or make to order ).  A system that accomplishes pull manufacturing is often called kanban (Japanese for “cards”). Electronic cards or containers signal production quantities to be filled by the preceding operation.

16 © 2012 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license distributed with a certain product or service or otherwise on a password-protected website for classroom use. Emphasizing Pull Manufacturing  In contrast, the traditional approach is to schedule production based on forecasted customer requirements. This principle is called push manufacturing (or make to stock ). LO 1

17 © 2012 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license distributed with a certain product or service or otherwise on a password-protected website for classroom use. 1.Scrap 2.Rework required to fix the product 3.Disruption in the production process 4.Dissatisfied customers 5.Warranty costs and expenses Emphasizing Zero Defects  Just-in-time manufacturing attempts to eliminate poor quality. Poor quality creates: LO 1

18 © 2012 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license distributed with a certain product or service or otherwise on a password-protected website for classroom use. Emphasizing Supply Chain Management LO 1  To enhance the interchange of information between supplier and customers, supply chain management often uses:  Electronic data interchange (EDI) which uses computers to communicate  Radio frequency identification devices (RFID), which are electronic tags placed on or embedded with products that can be read by radio waves that allow instant monitoring of product location

19 © 2012 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license distributed with a certain product or service or otherwise on a password-protected website for classroom use. Emphasizing Supply Chain Management LO 1  Enterprise resource planning (ERP) systems, which are used to plan and control internal and supply chain operations

20 © 2012 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license distributed with a certain product or service or otherwise on a password-protected website for classroom use. Learning Objective 2 Apply just-in-time practices to a non- manufacturing setting. Note: A discussion of Learning Objective 2 does not appear in the student version.

21 © 2012 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license distributed with a certain product or service or otherwise on a password-protected website for classroom use. Learning Objective 3 Describe the implications of just-in- time manufacturing on cost accounting and performance measurement.

22 © 2012 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license distributed with a certain product or service or otherwise on a password-protected website for classroom use. Accounting for JIT Manufacturing  In just-in-time manufacturing, the accounting system has the following characteristics:  Fewer transactions. There are fewer transactions to record, thus simplifying the accounting system.  Combined accounts. All in process work is combined with raw materials to form a new account, Raw and In Process (RIP) Inventory. LO 3

23 © 2012 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license distributed with a certain product or service or otherwise on a password-protected website for classroom use. Accounting for JIT Manufacturing  Combined accounts. Direct labor is combined with other costs to form a new account titled Conversion Costs.  Nonfinancial performance measures. Nonfinancial performance measures are emphasized.  Direct tracing of overhead. Indirect labor is directly assigned to product cells, thus, less factory overhead is allocated to products. LO 3

24 © 2012 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license distributed with a certain product or service or otherwise on a password-protected website for classroom use. Fewer Transactions  The accounting system for just-in-time manufacturing is simplified by eliminating the accumulation and transfer of product costs by departments. This type of accounting is termed backflush accounting. LO 3

25 © 2012 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license distributed with a certain product or service or otherwise on a password-protected website for classroom use. Combined Accounts LO 3 Anderson Metal Fabricators, a manufacturer of metal covers for electronic test equipment, has an annual budgeted conversion cost of $2,400,000 and 1,920 planned hours of production. The cell conversion cost rate is determined as follows: Cell Conversion Cost Rate = Budgeting Conversion Cost Planned Hours of Production Cell Conversion Cost Rate = $2,400,000 1,920 hours $1,250 per ton =

26 © 2012 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license distributed with a certain product or service or otherwise on a password-protected website for classroom use. Conversion Cost for Cover Manufacturing Time Cell Conversion Cost Rate = × = 0.02 hours × $1,250 = $25 per unit Combined Accounts LO 3 Assume that Anderson Metal’s cover product cell is expected to require 0.02 hour of manufacturing time per unit. Thus, the conversion cost for the cover is $25 per unit, as shown below.

27 © 2012 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license distributed with a certain product or service or otherwise on a password-protected website for classroom use. 1.Steel coil is purchased for producing 8,000 metal covers. The purchase cost was $120,000, or $15 per unit. Combined Accounts LO 3 (continued) Raw and In Process Inventory120,000 Accounts Payable120,000 To record material purchases. A separate Raw Materials account is not used.

28 © 2012 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license distributed with a certain product or service or otherwise on a password-protected website for classroom use. Combined Accounts LO 3 2.Conversion costs are applied to 8,000 covers at a rate of $25 per cover. Raw and In Process Inventory200,000 Conversion Costs200,000 To record applied conversion costs of the medium-cover line. The Raw and In Process Inventory account is used to accumulate the applied conversion costs. (continued)

29 © 2012 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license distributed with a certain product or service or otherwise on a password-protected website for classroom use. Combined Accounts LO 3 3.All 8,000 covers were completed in the cell. Finished Goods Inventory320,000 Raw and In Process Inventory320,000 To transfer the cost of completed units to finished goods. This is a backflush transaction because the Raw and In Process Inventory account balance is zero after the transfer. (continued) Materials ($15 x 8,000 units)$120,000 Conversion ($25 x 8,000 units) 200,000 Total$320,000 Total$320,000Materials ($15 x 8,000 units)$120,000 Conversion ($25 x 8,000 units) 200,000 Total$320,000 Total$320,000

30 © 2012 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license distributed with a certain product or service or otherwise on a password-protected website for classroom use. 7,800 × $70 (concluded) Combined Accounts LO 3 4.Of the 8,000 units completed, 7,800 were sold and shipped to customers at $70 per unit. Accounts Receivable546,000 Sales546,000 To record sales. Cost of Goods Sold312,000 Finished Goods Inventory312,000 To record cost of goods sold. 7,800 × $40

31 © 2012 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license distributed with a certain product or service or otherwise on a password-protected website for classroom use. Learning Objective 4 Describe and illustrate activity analysis for improving operations.

32 © 2012 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license distributed with a certain product or service or otherwise on a password-protected website for classroom use. Activity Analysis  An activity analysis determines the cost of activities based on an analysis of employee effort and other records. An activity analysis can be used to determine the cost of:  Quality  Value-added activities  Processes LO 4

33 © 2012 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license distributed with a certain product or service or otherwise on a password-protected website for classroom use. Cost of Quality LO 4  Prevention costs, which are costs of preventing defects before or during the manufacture of the product or delivery of services.  Appraisal costs, which are costs of activities that detect, measure, evaluate, and inspect products and process to ensure that they meet customer needs. (continued)

34 © 2012 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license distributed with a certain product or service or otherwise on a password-protected website for classroom use. Cost of Quality LO 4  Internal failure costs, which are costs associated with defects discovered before the product is delivered to the consumer.  External failure costs, which are costs incurred after defective products have been delivered to consumers.

35 © 2012 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license distributed with a certain product or service or otherwise on a password-protected website for classroom use. Pareto Chart of Quality Costs LO 4  Managers want information displayed so that the important problems or issues can be identified quickly. One method of reporting information is the Pareto chart.  A Pareto chart is a bar chart that shows the totals of an attribute for a number of ranked categories.

36 © 2012 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license distributed with a certain product or service or otherwise on a password-protected website for classroom use. 2.Percent of total quality costs associated with each classification 1.Total activity cost for each quality cost classification 3.Percent of each quality cost classification to sales Cost of Quality Report LO 4  A cost of quality report normally reports the:

37 © 2012 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license distributed with a certain product or service or otherwise on a password-protected website for classroom use. Value-Added Activity Analysis LO 4  A value-added activity is one that is necessary to meet customer requirements.  A non-value-added activity is not required by the customer, but occurs because of mistakes, errors, omissions, and process failures.

38 © 2012 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license distributed with a certain product or service or otherwise on a password-protected website for classroom use. Assume the cost of a firm’s four activities are as follows: If 10,000 sales orders are filled during the current period, the per unit process cost is $8 per order ($80,000/10,000 orders). (continued) Process Activity Analysis LO 4

39 © 2012 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license distributed with a certain product or service or otherwise on a password-protected website for classroom use. Masters Company determines that only new customers need to have a credit check. It is estimated that only 25% of sales orders would require credit checks. In addition, by revising the warehouse product layout, it is estimated that the cost of picking orders can be reduced by 35%. Process Activity Analysis LO 4 (continued)

40 © 2012 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license distributed with a certain product or service or otherwise on a password-protected website for classroom use. If 10,000 orders will be filled, the cost savings from these two improvements are as follows: Process Activity Analysis LO 4 (concluded)

41 Prepared by: C. Douglas Cloud Professor Emeritus of Accounting Pepperdine University © 2011 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license distributed with a certain product or service or otherwise on a password-protected website for classroom use. 41 Cost Management for Just-in-Time Environments The End


Download ppt "Prepared by: C. Douglas Cloud Professor Emeritus of Accounting Pepperdine University © 2011 Cengage Learning. All Rights Reserved. May not be copied, scanned,"

Similar presentations


Ads by Google