Download presentation
Presentation is loading. Please wait.
Published byJennifer Green Modified over 9 years ago
1
Results of rail trial shipment of DDGS
2
1956 Borsari family started with one truck transporting straw and hay. Since 1956…
3
6 Logistical sites in Italy Around 350.000 MT(cereal basis) total storage capacity bulk dry product Around 60.000 m³ tank capacity for liquids More than 700.000 MT handled in 2014 Around 300 trains received in our terminals in 2014 …Today…Today
4
Warehouses Villa Poma (Mantova) Ficarolo (Rovigo) Castelvetro Piacentino (Piacenza) Crevalcore (Bologna) Bondeno (Ferrara)
5
Villa Poma The Borsari Rail Terminal of Villa Poma offers: 150.000 SQ.M. directly connected to the train station of Poggio Rusco (Mantova), intersection of 2 main train lines: Bologna-Brennero & Ravenna Ferrara Mantova. Over 5 km of train lines of which 3km electrified Capacity to handle 6 block trains simultaneously Unloading capacity of 250 tons/hour cereals based 160.000 tons storage capacity cereals based Fully equipped research laboratory to analyse arriving goods on toxins and quality parameters.
6
Rail Terminal Villa Poma (Mantova)
7
Rail trail shipment of DDGS (video)
Similar presentations
© 2025 SlidePlayer.com Inc.
All rights reserved.