4 ZEEBRUGGE – FACT SHEET BUILDING AND PREMISSES: (PHASE 1: TBR) - 2 KM from port terminal, D type bonded - 27,456 m² warehouse - 8 modules of 3,500 m² - 4 modules with 9m useful height and 4 modules with 8m useful height - Parking area is 12,000 m² - Total land concession is 58,950 m² plus an additional 78,796 m² - Purchase cost 6,2 million Euro - Capacity is 110,000 TBR BUILDING AND PREMISSES: (PHASE 2: PSR & CVR) - Attached with phase 1, D type bonded - 28,336 m² warehouse - 4 modules of 7,000 m² - 7000 m² with 11m useful height and 21,000 m² with 8m useful height - Parking area is 5,000 m² - Construction cost 6,5 million Euro - Capacity is 720,000 PSR and 80,000 CVR

5 Logistics and Supply Chain Management Bridgestone Europe Workforce: (PHASE 1) -18 operators of which 2 are interim, 3.5 administrative staff, 1 manager -Total handling capacity is 8.700 TBR tires/shift or 21.36 tons/man/shift Workforce: (PHASE 2) -26 operators, 2.5 administrative staff, 0 manager -Total handling capacity is 26.500 PSR tires/shift or 10.7 tons/man/shift Material handling: (PHASE 1) -18 forklift trucks -13.100 TBR leased racks (5 high) – allows a maximum storage of 110.000 tires in the warehouse -15 docks – allows an intake of 15-20 containers per day and 15-20 trucks out per day – total volume is 3.729 containers IN for 2002 -SAP WM 4.6, with RF (under implementation) Material handling: (PHASE 2) -15 forklift trucks -38.914 racks (9 high PSR, 7 high CVR) – allows a maximum storage of 800.000 tires in the warehouse -14 docks – allows an intake of 12-18 containers per day and 12-18 trucks out per day – total volume is 8.000 containers IN for 2004 (all tires) -SAP WM 4.6, with RF ZEEBRUGGE – FACT SHEET

6 Logistics and Supply Chain Management Bridgestone Europe

7 BUILDING AND PREMISSES - 2 KM from polt terminal, D type bonded - Warehouse is 56 000 m² 4 modules of 3500 m², 9 m useful height; 4 modules of 3500 m², 8 m useful height 1 module of 7000 m², 11 m useful height; 3 modules of 7000 m², 8 m useful height - Parking area is 17 000 m² - Total land concession is 58 950 m² plus an additional 78 796 m² - Purchase cost 6.2 million euro (2001), and construction cost 6.5 million euro (2003) - Capacity: 110 000 TBR; 600 000 PSR/CVR WORKFORCE - 74 operators of which 35 are interim, 7 administrative staff, 2 managers - Total handling capacity is 8 700 TBR tires/shift or 21.36 tons TBR/man/shift - Total handling capacity is 26 500 PSR tires/shift or 10.7 tons PSR/man/shift MATERIAL HANDLING - 18 forklift trucks for TBR; 15 forklift trucks for PSR - 13 100 TBR leased racks (5 high) - allows a maximum storage of 110 000 tires in the warehouse - 35 000 racks (9 high PSR, 7 high CVR) - allows a maximum storage of 600 000 tires in the warehouse - TBR part: 15 docks - allows an intake of 15-20 containers per day and 15-20 trucks out per day totally 4753 TBR containers IN for 2003 - PSR part: 14 docks - allows an intake of 12 - 18 containers per day and 12 - 18 trucks out per day totally 1904 PSR containers IN for 2003 (from June) - SAP WM 4.6 with RF