Presentation is loading. Please wait.

Presentation is loading. Please wait.

M AY 13, 2015 C ALIFORNIA C OASTAL C OMMISSION S LIDE 1.

Similar presentations


Presentation on theme: "M AY 13, 2015 C ALIFORNIA C OASTAL C OMMISSION S LIDE 1."— Presentation transcript:

1 M AY 13, 2015 C ALIFORNIA C OASTAL C OMMISSION S LIDE 1

2 E XECUTIVE D IRECTOR ’ S R EPORT, M AY 2015S LIDE 2 S ANTA B ARBARA C OUNTY C OASTAL Z ONE

3 E XECUTIVE D IRECTOR ’ S R EPORT, M AY 2015S LIDE 3 N OTICE OF A PPEALABLE L OCAL COASTAL PERMITS

4 E XECUTIVE D IRECTOR ’ S R EPORT, M AY 2015S LIDE 4 FLAN S – T OTAL AND A PPEALABLE

5 E XECUTIVE D IRECTOR ’ S R EPORT, M AY 2015S LIDE 5

6 E XECUTIVE D IRECTOR ’ S R EPORT, M AY 2015S LIDE 6 A PPEAL DISPOSITION AND PROCESSING T IME 2012 – P RESENT

7 E XECUTIVE D IRECTOR ’ S R EPORT, M AY 2015S LIDE 7 Average Processing Time (Days)

8 E XECUTIVE D IRECTOR ’ S R EPORT, M AY 2015S LIDE 8 CDMS LCP AND CDP W ORKLOAD D ATA

9 E XECUTIVE D IRECTOR ’ S R EPORT, M AY 2015S LIDE 9 “Continued investments to update LCPs is necessary since most LCPs currently do not include plans for reducing risk from sea-level rise.”(p. 181) S AFEGUARDING C ALIFORNIA & LCP P LANNING

10 E XECUTIVE D IRECTOR ’ S R EPORT, M AY 2015S LIDE 10 “WHEREAS taking climate change into account in planning and decision making will help the state make more informed decisions and avoid high costs in the future...” “California Natural Resources Agency shall update every three years the state's climate adaptation strategy, Safeguarding California, and ensure that its provisions are fully implemented.” EXECUTIVE ORDER B-30-15


Download ppt "M AY 13, 2015 C ALIFORNIA C OASTAL C OMMISSION S LIDE 1."

Similar presentations


Ads by Google