Solar Probe Plus FIELDS Fluxgate Magnetometer QSR – June 2015 June 16, 2015 1 SPF MAG Quarterly Report – June 2015 MAG FM1 electronics PCB assembled (see.

Similar presentations


Presentation on theme: "Solar Probe Plus FIELDS Fluxgate Magnetometer QSR – June 2015 June 16, 2015 1 SPF MAG Quarterly Report – June 2015 MAG FM1 electronics PCB assembled (see."— Presentation transcript:

1 Solar Probe Plus FIELDS Fluxgate Magnetometer QSR – June 2015 June 16, 2015 1 SPF MAG Quarterly Report – June 2015 MAG FM1 electronics PCB assembled (see photo) The flight electronics frames and flight sensor components are fabricated. The FM1 sensor build has started. EM MAG sensor thermal cycling completed 200 cycles and vibration testing to EDTRD v2 numbers. No significant change in scale factors, zeros or orthogonality Second MAG Data Simulator delivered to U Minnesota Qualification vibration testing on the MAG EQM sensor was conducted on May 7. Will be repeated when EDTRD Rev-C is signed MAG responses to FIELDS CDR RFAs # 17, 19, and 23 uploaded to PIMS, awaiting requestor response. Response to Advisory #20 available IDL-based verification of MAG EQM test data from FIELDS 2 continues. Development of test procedures for MAG FM hardware continues.

2 Solar Probe Plus FIELDS Fluxgate Magnetometer QSR – June 2015 June 16, 2015 2 MAG Risk Matrix EM Vibe CONSEQUENCES 1 2 3 4 5 LIKELIHOODLIKELIHOOD 5432154321 Retest to EDTRD Rev-C new vibe numbers (released June 11) to retire.

3 Solar Probe Plus FIELDS Fluxgate Magnetometer QSR – June 2015 June 16, 2015 Magnetometer Schedule 3 SPP Magnetometer Summary FebruaryMarch AprilMay June July 2916232916233061320274111825181522296132027 Mag FM-1 PCB Build XXXXXXXXXXX Mag FM-1 Sensor Build XXXXXXXXXXXXXXXXXXXXX Mag FM-1 Integrate & Test XXXXXX Mag EM Sensor Thermal Cycles XXXX Mag EM Sensor Qualification Vibe X Mag Simulator #2 XXXXX Mag FM Frames XXXX Mag FM Adapter Plates XXXX Mag Sensor Covers XXX Mag FM-2 PCB Build XX XXXXXXXXX Mag FM-2 Sensor Build XX XXXXXXXXXX Mag FM-2 Integrate & Test XXX X Schedule delayed waiting for boom vibration numbers update (informally delivered Apr/May) Impact on schedule: FM delivery Feb 2016

4 Solar Probe Plus FIELDS Fluxgate Magnetometer QSR – June 2015 June 16, 2015 Magnetometer Workforce 4 #495051525354555657585960 Year2014 2015 MonthOctNovDecJanFebMarAprMayJunJulyAugSep FTE – plan5.3 FTE - Act4.25.16.04.44.04.34.44.7 616263646566676869707172 2015 2016 OctNovDecJanFebMarAprMayJunJulyAugSep 4.5 737475767778798081828384 2016 2017 OctNovDecJanFebMarAprMayJunJulyAugSep 3.6 858687888990919293949596 2017 2018 OctNovDecJanFebMarAprMayJunJulyAugSep 2.1 Plan does not include labor in GSFC pools which are considered a procureme nt

5 Solar Probe Plus FIELDS Fluxgate Magnetometer QSR – June 2015 June 16, 2015 Magnetometer Budget - 1 5 Budget Summary (5/31/2015) FY15: Cost to date: $994,697Plan: $1,078,508 Accumulative: Cost to date: $3,925,333Plan: $3,865,290 Reserves thru FY 15: $475,073 Reserves request submitted 2/28/2015: $124,750 (status?) Reserve Phase C request (2/28/2015) to cover Carbon Composite Base build, test & qualify (save mass, improve thermal isolation) Mag data simulator (2x) for FIELDS 2 (UM) (increase FIELDS reliability)  W/ mass model suitable for vibration (UM → UCB)  Lab version (UM) Future Phase C/D Liens GSE multi-mag variometer/gradiometer (science performance verification to assess local magnetic field environment up to 144 Hz) Mu-metal shield cans with 3-axis field generator (science performance verification during S/C I&T)

6 Solar Probe Plus FIELDS Fluxgate Magnetometer QSR – June 2015 June 16, 2015 Magnetometer Budget - 2 6 A+B Contract Value ($) Phase C/D ($) CTD Actual May 15 CTD Plan May 15 Plan Balance EAC Contract Value 2,133,931GSFC MAG 3,925,3333,865,2901,992,2126,187,3886,127,345 22,069Reserves 820,752 2,156,000Total 3,925,3333,865,2901,992,2126,187,3886,948,097 Phase A-B Reserves FY14FY15FY16FY17FY18Total C/D 22,069129,705323,299209,55872,43163,689798,683 Future Phase C/D Liens GSE multi-mag variometer/gradiometer Mu-metal shield cans with 3-axis field generator Schedule slips beyond Mag’s control


Download ppt "Solar Probe Plus FIELDS Fluxgate Magnetometer QSR – June 2015 June 16, 2015 1 SPF MAG Quarterly Report – June 2015 MAG FM1 electronics PCB assembled (see."