Presentation is loading. Please wait.

Presentation is loading. Please wait.

NICOLE FELICIANO (TEAM LEAD) JOHN FIGUEIRA (TEAM MEMBER) NOOR HUSAIN (TEAM MEMBER) KYLE GROTJOHN (TEAM MEMBER) DR. ALBRIGHT (FACULTY ADVISOR) JENIFER MILLER.

Similar presentations


Presentation on theme: "NICOLE FELICIANO (TEAM LEAD) JOHN FIGUEIRA (TEAM MEMBER) NOOR HUSAIN (TEAM MEMBER) KYLE GROTJOHN (TEAM MEMBER) DR. ALBRIGHT (FACULTY ADVISOR) JENIFER MILLER."— Presentation transcript:

1 NICOLE FELICIANO (TEAM LEAD) JOHN FIGUEIRA (TEAM MEMBER) NOOR HUSAIN (TEAM MEMBER) KYLE GROTJOHN (TEAM MEMBER) DR. ALBRIGHT (FACULTY ADVISOR) JENIFER MILLER (INDUSTRY ADVISOR) DR. KENNEDY (CUSTOMER) DR. NUXOLL (CLASS ADVISOR) Stoplight Pizza Wind Belt Generator

2 Introduction Team Members Project Background Block Diagram Design Challenges Risks Milestones Conclusion

3 Team Members Nicole Feliciano (Team Lead)  Home Town: Aiea, Hi  Favorite Hobby: Puzzles  Interesting Fact: Don’t have a middle name Noor Husain (Team Member)  Home Town: Kuwait  Favorite Hobby: Reading  Interesting Fact: Fluent Arabic, Persian, English

4 Team Members (Cont.) Kyle Grotjohn (Team Member)  Hometown: Riverside, CA  Favorite Hobby: Messing with my bike  Interesting Fact: I love cheesecake John Figueira (Team Member)  Hometown: Kapolei, Hi  Favorite Hobby: Building models  Interesting Fact: I really like free things, especially food

5 Background Developing Countries  More efficient and smaller wind power  Remote applications Wind Belt  Faraday’s Law  Narrows Bridge

6 Block Diagram

7 Design Challenges Placement of Magnets & Coils  Must be stable  One end of design Membrane Tension  Loss of power  Tension adjustment at end Stator vs. Coils  Cost vs. efficiency  Coils for cost Creating Coils  Particular design  Many prototypes and sealant

8 Risks SeverityLikelihood Magnet strength too lowModerate Frame does not support tensionHighModerate The coils do not cause an adequate magnetic field High Moderate Rectifier/Battery burn out due to too much charge ModerateModerate/Low

9 Milestones NumberDescriptionCompletion Date 1Project Proposal8/31/2012 2Due: Functional Specification, first complete draft (ver 0.9)9/21/2012 3  September Program Reviews  Due: Functional Specification, advisor-approved draft (ver 0.95)  Complete website  Submit part list for approval 9/28/2012 4  Due: Functional Specification, final draft (ver 1.0)  Project Support from Craig Henry and Allen Hansen 10/05/2012 5Due: Project Business Assessment10/12/2012 7October Program Reviews10/26/2012 8First Prototype constructed10/31/2012 9Due: Design Document, first complete draft (ver 0.9)11/02/2012 10  Due: Design Document, advisor-approved draft (ver 0.95)  Deadline: Team Meeting with Peter Rachor 11/09/2012 11Due: Design Document, final draft (ver 1.0)Final Budget11/16/2012 12November Program Reviews Due11/30/12

10 Conclusion Team Stoplight Pizza Importance/Background Design and Challenges Risks and Milestones


Download ppt "NICOLE FELICIANO (TEAM LEAD) JOHN FIGUEIRA (TEAM MEMBER) NOOR HUSAIN (TEAM MEMBER) KYLE GROTJOHN (TEAM MEMBER) DR. ALBRIGHT (FACULTY ADVISOR) JENIFER MILLER."

Similar presentations


Ads by Google