Presentation is loading. Please wait.

Presentation is loading. Please wait.

Doc.: IEEE 802.15-14-0049-00-0sru Submission Jan 2014 Takashi Yamamoto, Sumitomo Electric IndustriesSlide 1 Consideration on standardization process Authors:

Similar presentations


Presentation on theme: "Doc.: IEEE 802.15-14-0049-00-0sru Submission Jan 2014 Takashi Yamamoto, Sumitomo Electric IndustriesSlide 1 Consideration on standardization process Authors:"— Presentation transcript:

1 doc.: IEEE 802.15-14-0049-00-0sru Submission Jan 2014 Takashi Yamamoto, Sumitomo Electric IndustriesSlide 1 Consideration on standardization process Authors: NameAffiliationsAddressPhoneemail Takashi YamamotoSumitomo Electric Industries, Ltd. 1-1-3, Shimaya, Konohana-ku, Osaka, 554-0024 Japan +81-06-6466-5695yamamoto-takashi@sei.co.jp Yoshizo Tanakatanaka-yoshizo@sei.co.jp Kenichi Murakamimurakami-kenichi@sei.co.jp Hirotsugu Yamamotoyamamoto-hirotsugu@sei.co.jp Yoji Okadaokada-yoji@sei.co.jp

2 doc.: IEEE 802.15-14-0049-00-0sru Submission Jan 2014 Takashi Yamamoto, Sumitomo Electric IndustriesSlide 2 Project: IEEE P802.15 Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Consideration on standardization process] Date Submitted: [January 21, 2014] Source: [Takashi Yamamoto] Company [Sumitomo Electric Industries, Ltd] Address [1-1-3, Shimaya, Konohana-ku, Osaka, 554-0024 Japan] Voice:[+81-06-6466-5695], FAX: [+81-06-6462-4586], E-Mail:[yamamoto-takashi@sei.co.jp] Re: [Call for contributions by IEEE802.15 SG-SRU] Abstract:[This presentation provides our view on the SG and TG standardization process.] Purpose:[To support the drafting of PAR & 5C.] Notice:This document has been prepared to assist the IEEE P802.15. It is offered as a basis for discussion and is not binding on the contributing individual(s) or organization(s). The material in this document is subject to change in form and content after further study. The contributor(s) reserve(s) the right to add, amend or withdraw material contained herein. Release:The contributor acknowledges and accepts that this contribution becomes the property of IEEE and may be made publicly available by P802.15.

3 doc.: IEEE 802.15-14-0049-00-0sru Submission Abstract Jan 2014 Takashi Yamamoto, Sumitomo Electric IndustriesSlide 3 An evaluation methodology for SRU should be substantially discussed in order to assess gains relative to legacy IEEE802.15.4 systems. This presentation provides our view on the SG and TG standardization process that could help RRMM spec development.

4 doc.: IEEE 802.15-14-0049-00-0sru Submission Step 1: Clarify the RRMM requirements Jan 2014 Takashi Yamamoto, Sumitomo Electric IndustriesSlide 4 Collect the requirements of the RRMM use cases and narrow down the target of SRU. –Applications Example: position estimation, periodic monitoring, etc. –Traffic models of sensors and actuators packet size, interval, event probability –Deployment methods numbers of gateways and devices additional deployment is possible or not initial channel settings –etc.

5 doc.: IEEE 802.15-14-0049-00-0sru Submission Example of classifiers Jan 2014 Takashi Yamamoto, Sumitomo Electric IndustriesSlide 5 #CategoryComment (example) 1NameFactory 2ActorsMeters (position, gas, pressure, etc.) 3LocationOutdoor 4Deployment methodsAdditional deployment is possible. 5STA/AP communication… 6Data rate 7BER/PER requirement 8Mobility 9 Traffic type wake up period (duty cycle) 10Battery life requirement 11STA/AP capacity 12STA/AP elevation Details of the classifiers are for further discussion.

6 doc.: IEEE 802.15-14-0049-00-0sru Submission Step 2: Establish evaluation methodology Jan 2014 Takashi Yamamoto, Sumitomo Electric IndustriesSlide 6 Define metrics to evaluate communication quality in the view point of application users. –Prioritize the evaluation items (throughput, delay, power consumption, etc.) for each application. –The problem is how to describe user experience such as connectivity, discovery, reachability, and mobility technically.

7 doc.: IEEE 802.15-14-0049-00-0sru Submission Step 3: Evaluate new RRMM technologies Jan 2014 Takashi Yamamoto, Sumitomo Electric IndustriesSlide 7 Analyze the issues of the legacy IEEE802.15.4 RRMM technologies and collect the solutions. –Simulation is one of potential evaluation methods. –IEEE802.15 MAC/PHY may be abstracted boldly to use the existing network simulation software. Summarize how to approach the issues in the SRU standardization activity.

8 doc.: IEEE 802.15-14-0049-00-0sru Submission 20142015 MarMayJulSepNovJanMarMayJulSep Schedule Jan 2014 Takashi Yamamoto, Sumitomo Electric IndustriesSlide 8 The evaluation activity need enough discussion time, but we can’t repeat Step1~3 several times. Therefore, we propose that we schedule this work clearly and advance it systematically. –Guidelines for Step1~3 proposals will be roughly determined in order to collect contributions widely. Step 2: Evaluation Methodology Step 1: Requirements Step 3: Proposal of new technologies

9 doc.: IEEE 802.15-14-0049-00-0sru Submission Summary Jan 2014 Takashi Yamamoto, Sumitomo Electric IndustriesSlide 9 We proposed the standardization process of SRU. –Step 1: Clarify the RRMM requirements –Step 2: Establish evaluation methodology –Step 3: Evaluate new RRMM technologies Our intention is not to limit the discussion, but to activate the discussion by clarifying the issues at each step.


Download ppt "Doc.: IEEE 802.15-14-0049-00-0sru Submission Jan 2014 Takashi Yamamoto, Sumitomo Electric IndustriesSlide 1 Consideration on standardization process Authors:"

Similar presentations


Ads by Google