Data Coordination Working Group (DCWG). 2  Met with EIA  Discussed DCWG Scope  Reviewed Action Items from the Last Meeting  Discussed DCWG Work Plan.

Similar presentations


Presentation on theme: "Data Coordination Working Group (DCWG). 2  Met with EIA  Discussed DCWG Scope  Reviewed Action Items from the Last Meeting  Discussed DCWG Work Plan."— Presentation transcript:

1 Data Coordination Working Group (DCWG)

2 2  Met with EIA  Discussed DCWG Scope  Reviewed Action Items from the Last Meeting  Discussed DCWG Work Plan  Evaluated Confidence Levels for Capacity  Deliberated on Regional Feedback on Summer/LTRA data collection.  Discussed NERC’s current & future data analysis approach DCWG Meeting April 9-10, 2008 (Washington, DC)

3 3  Meeting held on April 9, 2008 in Washington D.C.  EIA to write letter to NERC outlining (Task 7 of DCWG work plan): Improvements to Current EIA 411 Data Collection Future Areas of Collaboration  Update NERC/EIA MOU  NERC to send letter to EIA thanking them (Bob Schnapp) for support on Schedule 7 (Transmission Outage Data) & Schedule 3.  DCWG to re-design Schedule 2 (Unified Generator Database): Support LTRA True-up to EIA 860  NERC to support Presidential Permitting for Canadian/Mexico Interconnections  EIA desires Spring/Fall Meetings Work Status: Joint Meeting with EIA (Task 6 of DCWG Work Plan)

4 4  Meeting held on April 9-10, 2008 in Washington D.C.  Consistent Posting of Meeting Materials  Formed a task force defining confidence levels for capacity data (Fedora, Simons & Molesky along with a representative from SERC and NERC)  SERC to summarize data submittal recommendations based on regional feedback on the Summer/LTRA data collection  Request RAS move the LTRA due date to May 1 corresponding to EIA’s new due data of July 15, 2008  NPCC Representative (Fedora) will perform a trial run to demonstrate risk assessment approaches to capacity margin analysis (Supporting Task 4 of the DCWG Work plan) Work Status: DCWG Meeting

5 5  Status of Risk Analysis and capacity confidence bounds – Phil Fedora  Comments on LTRA forms, as with Summer – Herb Schrayshuen  Update on NERC activities – Mark Lauby RAITF IVGTF DRDTF RMWG  Individual unit data collection 2009 - All  Status of Letter to EIA – Mark Lauby  Status of MOU with EIA – Mark Lauby  EIA – John Makens Write DCWG a letter outlining areas of improvement that they would like to see Presidential permits  Fall Meeting Agenda & Meeting Objectives -061808


Download ppt "Data Coordination Working Group (DCWG). 2  Met with EIA  Discussed DCWG Scope  Reviewed Action Items from the Last Meeting  Discussed DCWG Work Plan."