Presentation is loading. Please wait.

Presentation is loading. Please wait.

Milestone Program Overview September 2004. 2  2004 Copyright RosettaNet. RosettaNet Milestone Programs eBusiness Process Alignment Order Demand Creation.

Similar presentations


Presentation on theme: "Milestone Program Overview September 2004. 2  2004 Copyright RosettaNet. RosettaNet Milestone Programs eBusiness Process Alignment Order Demand Creation."— Presentation transcript:

1 Milestone Program Overview September 2004

2 2  2004 Copyright RosettaNet. RosettaNet Milestone Programs eBusiness Process Alignment Order Demand Creation ManufacturePayment Logistics DesignForecast eDiagnostics (SEMI) Semiconductor Process Data Exchange Material Composition Semiconductor Test Data Exchange Payment Freight Invoicing Complex Products & Services eDistribution (China) OMJ - Advanced Product Catalog Info Price & Availability RosettaNet Automated Enablement Sales Reporting TC Order to Cash (1) Material Release Automated eTicketing eCustoms Declaration Service Contract Info Mgmt Shipment Booking & Status Shipment Notification Mgmt Warranty Program Status ActiveFormingProposalComplete Engineering Information Mgmt

3 3  2004 Copyright RosettaNet. RosettaNet Milestone Programs Program Sponsorship Milestone Program Council Sponsors CCEECSMLGTCMilestone OMJ – AdvancedSonyS03.2004 Price & AvailabilityArrowSS06.2004 WarrantyHPS06.2004 TC Order to Cash (Phase 1)EricssonS08.2004 Semiconductor Test Data ExchangeIBMS11.2004 PaymentIntel & NokiaXSX12.2004 Product Catalog InfoIntelS12.2004 Sales ReportingIntelSX12.2004 Material CompositionNokiaXSX01.2005 RosettaNet Automated EnablementIntelSS03.2005 Shipment Notification ManagementHPSX03.2005 Engineering Information MgmtSonyS03.2005 eCustoms DeclarationExel & IntelS03.2005 Shipment Booking and StatusIntelS06.2005 Service Contract Information MgmtCisco SystemsSX10.2005 Legend: S – Sponsoring Council X – Councils Involved in Milestone Active Done

4 4  2004 Copyright RosettaNet. Milestone Program Council Sponsors CCEECSMLGTCMilestone eDistribution(RNC)S12.2004 eDiagnosticsIntelS10.2005 Automated eTicketingMotorola S12.2005 Material ReleaseArrowXS12.2005 Complex Product & ServicesSiemensSTBD Freight InvoicingIntel STBD Semiconductor Process Data ExchangeIBMSTBD Legend: S – Sponsoring Council X – Councils Involved in Milestone Proposed RosettaNet Milestone Programs Program Sponsorship

5 5  2004 Copyright RosettaNet. Milestone ProgramPhase Implement Existing Standard Reversion Existing Standard Develop New Standard Status OMJ - AdvancedComplete165--- Price & AvailabilityComplete1---- WarrantyActive113R TC Order to Cash (Phase 1)Active---G Semiconductor Test Data ExchangeActive--1G PaymentActive-1-G Product Catalog InfoActive-1-G Sales ReportingActive--2G Material CompositionActive-11G RosettaNet Automated EnablementActive-7*-G Shipment Notification ManagementActive-1-G Engineering Information MgmtActive-1-G eCustoms DeclarationActive-1-G Shipment Booking and StatusActive-4-G Service Contract Information MgmtActive-??1-3G * Format reversion only (Refactor). RosettaNet Milestone Programs Program Scope

6 6  2004 Copyright RosettaNet. Milestone ProgramPhase Implement Existing Standard Reversion Existing Standard Develop New Standard Status eDistributionProposed 3-5- --- eDiagnosticsProposed --1-2 -- Automated eTicketingProposed --1-3 -- Material ReleaseProposed -1- -- Complex Product & ServicesProposed --1-3 -- Freight InvoicingProposed -- 1-- Semiconductor Process Data ExchangeProposed -- 1-- RosettaNet Milestone Programs Program Scope Proposed

7 7  2004 Copyright RosettaNet. Milestone ProgramCouncil Total Unique Partners Total Unique PIPs ® Total Connections Milestone OMJ – AdvancedEC631532403.2004 Price & AvailabilityCCE/EC711206.2004 WarrantyCCE552606.2004 TC Order to Cash (Phase 1)TC---08.2004 Semiconductor Test Data ExchangeSM101-320*11.2004 PaymentEC515012.2004 Product Catalog InfoCCE713612.2004 Sales ReportingCCE622012.2004 Material CompositionEC12222*01.2005 RosettaNet Automated EnablementEC/SM575003.2005 Shipment Notification MgmtEC512003.2005 Engineering Information MgmtEC13+15003.2005 eCustoms DeclarationLG1015003.2005 Shipment Booking and StatusLG6420+06.2005 Service Contract ManagementCCE53-520+10.2005 * Proposed New Completion Date Done Active RosettaNet Milestone Programs Implementation Scorecard

8 8  2004 Copyright RosettaNet. Automated E-Ticketing Complex Product & Services Program Forming Investigation and Requirements Gathering Investigation and Requirements Gathering Engineering Design and Development Program Results Evaluation and Promotion Validation, Implementation and Support Architecture Design, Tools and Methods Development Planning Sponsor ECSMCCETC OMJ Advanced Payment Price & Availability Product Catalog Info eCustoms Declaration Engineering Information Mgmt Service Contract Information Mgmt Shipment Booking and Status Shipment Notification Mgmt RosettaNet Automated Enablement Material Composition Sales Reporting TC Order to Cash (Phase 1) Warranty Semiconductor Test Data Exchange LG RosettaNet Milestone Programs Standards Methodology Status – September 2004 Semiconductor Process Data Exchange eDiagnostics eDistribution Freight Invoicing Material Release

9 9  2004 Copyright RosettaNet. RosettaNet Milestone Programs Implementation Milestones – Completed in 2004 Program StatusImplementation Milestone OMJ - AdvancedCompleteIncrease of another 200 TPs by 03.2004 Price & Availability CompleteValidation and implementation of at least 5 Council Member companies in production with price & availability version 2 PIP ® with at least one - two partners each by 06.2004.

10 10  2004 Copyright RosettaNet. RosettaNet Milestone Programs Implementation Milestones – Active 2004 Programs Program StatusImplementation Milestone WarrantyAt RiskValidate and deploy warranty standard by 06.2004. Issue: PIP 3A5 validation with only two TPs; Implementation Guide (RIG) not produced. Secure validation participants and create RIG Telecom Order to Cash (Phase 1) On TrackDocumented Implementation Reference Models and RosettaNet Implementation Guides for Telecom Industry by 08.2004. Semiconductor Test Data Exchange On TrackAchieve initial production implementations of Semiconductor Test Data Exchange process by 05.2004 and a total of 20 connections by 11.2004. PaymentOn TrackEarly implementation and validation with at least 10 connections by 12.2003. Production implementation by program partners with at least 40 additional connections by 12.2004.

11 11  2004 Copyright RosettaNet. RosettaNet Milestone Programs Implementation Milestones – Active 2004 Programs Program StatusImplementation Milestone Product Catalog Information On TrackTotal of 26 connections using the Product Catalogue Information process by 12.2004. Sales ReportingOn TrackDevelop and validate a Sales Reporting Process by 12.2003 Deploy the Sales Reporting process within 6 months of the Validated PIP release with a total of 20 connections by 12.2004. Material Composition On TrackEarly implementation and validation with at least 6 connections by 11.2004. Production implementation by program partners with at least 14 additional connections by 01.2005. RosettaNet Automated Enablement On TrackBegin validation in 07.2004 of 7 XML Schema Order to Cash PIPs ® with supporting Trading Partner Implementation Requirements (TPIRs) using Connectivity Profile Service to enable automated configuration with production connections by 03.2005. Shipping Notification Management On TrackAt least 5 companies to validate the revised Shipment Notification process with 20 implementations by 03.2005.

12 12  2004 Copyright RosettaNet. RosettaNet Milestone Programs Implementation Milestones – Active 2004 Programs Program StatusImplementation Milestone Engineering Information Management On TrackBy 03.2005, have over 50 connections exchanging electronic engineering information related to material composition, new product database, and approved component database information using PIP 2A10 V02.00.00. Create a standardized IDA and templates. eCustoms Declaration On TrackValidate and deploy Notify of Shipping Documentation (3B18) to support automated customs clearance involving 10 Council companies with 50 total connections by 03.2005 in Malaysia and Philippines. Shipment Booking and Status On TrackTarget implementation Q2 2005. Service Contract Information Management On TrackAt least 5 Council companies in production with service contract maintenance PIPs with at least 3 partners each by 10.2005.

13 13  2004 Copyright RosettaNet. RosettaNet Milestone Programs Program Sponsorship – Completed Programs Milestone Program Council SponsorsCCEECSMMilestone SM Work In Process (WIP)TSMCS07.2001 Collaborative Forecasting (1) ST Microelectronics, Texas Instruments S10.2001 SM Order ManagementMotorolaS11.2001 Basics & ExpressIntelSS12.2001 Design WinMotorolaS12.2001 iHubCisco SystemsS12.2001 Order Management in JapanSonyS12.2001 Product Info ExchangeLucent (former member) S12.2001 Ship from Stock (1)ArrowS12.2001 SM MaterialsSM CouncilS12.2001 Order Management (SM)MotorolaS06.2002 Mfg Work in Process (2)TSMCS09.2002 Forecasted Inventory MgmtJSR & NECS10.2002 Mfg Work OrderTSMCS10.2002 Order Mgmt In Japan - ExtSonyS12.2002 Design Engineering InfoSonyS12.2002 Ship from Stock (2)ArrowS12.2002 Complete

14 14  2004 Copyright RosettaNet. RosettaNet Milestone Programs Program Sponsorship – Completed Programs Milestone Program Council Sponsors CCEECSM Milestone Collaborative Forecasting (2) STMicroelectronics Texas Instruments S03.2003 Ship NoticeAmkor TechnologyS05.2003 Design Win (2) MotorolaS12.2003 Direct Ship / 3PLIntelS12.2003 Global BillingIntelSS12.2003 Complete

15 15  2004 Copyright RosettaNet. RosettaNet Milestone Programs Implementation Scorecard – Completed Programs Milestone ProgramCouncil Total Unique Partners Total Unique PIPs ® Total Con- nections Milestone SM Work In Process (WIP) SM1021407.2001 Collaborative Forecasting (1) EC62810.2001 SM Order Management SM17+454+11.2001 Basics & Express EC / CCE15+413712.2001 Design Win (1) EC1222512.2001 iHub EC1148012.2001 Order Management in Japan EC45129212.2001 Product Information Exchange EC1412612.2001 Ship from Stock (1) EC52612.2001 SM Materials SM1153212.2001 Order Management (SM) SM17+440+06.2002 Mfg Work in Process (2) SM71809.2002 Forecasted Inventory Mgmt SM942610.2002 Mfg Work Order SM521010.2002 Order Mgmt In Japan - Ext EC1661679112.2002 Design Engineering Info EC1412212.2002 Ship from Stock (2) EC541612.2002 Complete

16 16  2004 Copyright RosettaNet. RosettaNet Milestone Programs Implementation Scorecard – Completed Programs Milestone ProgramCouncil Total Unique Partners Total Unique PIPs ® Total Con- nections Milestone Collaborative Forecast. (2)EC632603.2003 Ship NoticeSM61805.2003 Design Win (2)EC834012.2003 Direct Ship / 3PLEC19911412.2003 Global BillingEC / SM1022012.2003 Complete

17 17  2004 Copyright RosettaNet. RosettaNet Milestone Programs Implementation Milestones – Completed in 2002 Program StatusImplementation Milestone Design Engineering Info Complete At least 1 board company committed to implement the technical information distribution process with 3 or more partners by 12.2002. Forecasted Inventory Mgmt Complete 6 Council Member companies in production using at least one inventory (4C) or forecast (4A) PIP with at least two trading partners by 10.2002. Manufacturing WIP (2) Complete 4 Council Member companies in production using at least one WIP (7B) PIP with at least one trading partner by 9.2002. Manufacturing Work Order Complete 6+ Council members have put at least one PIP on production with at least one trading partner by 10.2002. 6+ Council members have put PIPs on production with at least 2 trading partners by 03.2003 Order Mgmt in Japan–Extended Complete EC companies in Japan implementing Order Management or its adjacent process PIP like 3A*,4A*/4C*,and so on, with more than 200 partners in production by the 12.2002. Order Management-SM (2) Complete 20 Council Member companies in production using at least one order mgmt (3A) PIP with at least one trading partner by 06.2002. 10 of those Council Member companies in production using at least two of the above-referenced PIPs with at least five trading partners by 06.2002. Ship from Stock (2) Complete Initiate ship from stock process from quote and validate at least two of the remaining PIPs ® during 1H02. Deploy complete ship from stock process (two or more PIPs 3A1, 5D1- 5D6) by 12.2002.

18 18  2004 Copyright RosettaNet. RosettaNet Milestone Programs Implementation Milestones – Completed in 2003 Program StatusImplementation Milestone Collaborative Forecasting (2) CompleteAt least 4 EC Council Member companies in production with at least one partners using forecast and forecast response and at least 1 EC Council Member company in production with at least one partner using forecast and exception notification by 3.3.2003. Ship NoticeComplete6 SM Council Member companies in production using ASN (3B) PIP with at least two trading partners by 5.2003. Design Win (2)Complete11 EC Council Member suppliers and distributors complete the implementation of the Design Win PIPs ® with multiple trading partners by 12.2003. Direct Ship / 3PLCompleteImplement the direct ship process standards with two or more trading partners and at least three PIPs® by 12.2003. Global BillingComplete20 trading partner implementations of seller-initiated billing process and 5 trading partner implementations of self-billing process by 12.2003

19 Milestone Program Overview END September 2004


Download ppt "Milestone Program Overview September 2004. 2  2004 Copyright RosettaNet. RosettaNet Milestone Programs eBusiness Process Alignment Order Demand Creation."

Similar presentations


Ads by Google