Request for Proposals Notification When to use?. When to use….. Federal funds to be used as reimbursement for PE, R/W, CE. 100% local funds for PE and/or.

Similar presentations


Presentation on theme: "Request for Proposals Notification When to use?. When to use….. Federal funds to be used as reimbursement for PE, R/W, CE. 100% local funds for PE and/or."— Presentation transcript:

1 Request for Proposals Notification When to use?

2 When to use….. Federal funds to be used as reimbursement for PE, R/W, CE. 100% local funds for PE and/or R/W to be used as credit Not required if PE, R/W or CE 100% Local funded (even if FHWA funds in CN)

3

4 LPA NAME __________ RFP# _______________ Posting Date _________ Project Location ________________ Response Due Date and Time _____ Contact for Questions _____________ Submit To: ______________________ DBE goal _______%

5 RFP Submittal Requirements Letter of Interest (including attachments) One (1) signed Affirmative Action Certification (including attachments)

6 Letter of Interest (LoI) general instructions Must be received by due date Details on number of pages (maximum) No additional brochures, etc.

7 Letter of Interest (LoI) Content Consultant Identifications and qualifications Key Staff and Project approach

8 Letter of Interest Content Identification and Qualifications –Firm name and person authorized to negotiate –Sub consultants, DBE status, and percent of work –Personnel resumes and additional information

9 Letter of Interest Content Key Staff and Project Approach List Project Manager and key staff experience Describe staff capacity and ability Describe present workload Provide a description of your project approach

10 Requirements for Affirmative Action Certification A completed form for items that identify a DBE goal (identifies DBE firm and % participation) DBE certification Show good faith efforts if goal not met

11 Work Item Details LPA Name Project location District Project Phases included Project Description Estimated Construction Amount DBE Goal Term of Contract and Funding Required Prequalification Categories

12

13 Selection Procedures Selected for work items Selected based on LoI and other documents Selected based on Selection Rating Consultant is Pre-qualified (if not pre- qualified, additional steps will be required as related in the LPA Architectural and Engineering Firm Selection Procedures)