1 LTE Measurement Monitor and Trace (MMT) Application

2 Agenda To Do

3 Measurement, Monitor and Trace Application MMT provides:  Detailed low-level debug L1 and 2 statistics measurements, Phy, MAC HARQ, Throughput, CQI, RLC, PDCP etc Monitor of all power levels and timing errors Runtime, real time MSC logging of all data and primitives Runtime control of trace logging Post process of all L1 information including DL/UL DCIs, PUCCH SRs, CQI, PMI,RI etc.

4 Measurement window

5 Monitor Window

6 Trace Window

7 Trace post process tool Post process of binary log for detailed DL and UL analysis Analysis contains very detailed information on a TTI-TTI basis

8 How to get the elementary information from MMT trace

9 1. How to get the elementary information Using the LTE-PHY-DATA-REQ-OPT Window to get the almost elementary information.LTE-PHY-DATA-REQ-OPT Window Refer to the “Control Software Operation Guide” to get the detailed explanation.Control Software Operation Guide “ MD8430A Easy-to-understand Signalling Tester (Control Software Operation Guide)” – Appendix A Option Information section Using the PRIM_HEAD Window to get the activation time of primitive.PRIM_HEAD Window confidential MCB-1QST11067

10 LTE-PHY-DATA-REQ-OPT Window MCB-1QST11067 confidential Parameters

11 LTE-PHY-DATA-REQ-OPT Parameter The elementary information of low lay MCB-1QST11067 confidential Back

12 Appendix A Option Information section of Control Software Operation Guide Appendix A Option Information section confidential MCB-1QST11067 Back MD8430A_Control_Software_Operation_Guide_e_23.pdf

13 PRIM_HEAD Window MCB-1QST11067 confidential Set “-”

14 Part 2 How to get the advanced information from MMT trace

15 2.1 Enable/display the advanced information Set “Capture Filter Switch” and “Display Filter Switch” to OFF as below for enabling/displaying the advanced information. The above setting should be applied after staring scenario, because of the setting will be neglected, if set it before starting scenario. confidential MCB-1QST11067

16 2.2 Use the Trace log conversion program to create the CSV file format. The Trace log conversion program converts the measurement result for the physical channel in the Trace log file saved in binary format to CSV files format as below. Drag and drop the saved trace log file onto the shortcut Trace Converter in C:\MX843010\Trace.. confidential MCB-1QST11067

17 2.3 Get the advanced information from the created CSV files The following CSV files will be created by conversion program. The almost advanced information are included in the Downlink/ Uplink Report information file. Refer to the “Control Software Operation Guide” to get the detailed explanation.Control Software Operation Guide “ MD8430A Easy-to-understand Signalling Tester (Control Software Operation Guide)” - Offline Measurement Using Trace Log section confidential MCB-1QST11067

18 Offline Measurement Using Trace Log section of Control Software Operation Guide Offline Measurement Using Trace Log section confidential MCB-1QST11067 MD8430A_Control_Software_Operation_Guide_e_23.pdf

19 Part 3 Practice

20 3.Practice UE eNB DCI & DL Message SR UL grant HARQ-ACK UL Message HARQ-ACK How to get DCI ? How to get UL HARQ Feedback ? How to get SR? How to get UL grant ? How to get DL HARQ Feedback (HI)? Generally, We only can catch some limited information from MMT trace. However, that is not enough for us to debug or further confirm eNB/UE behavior, So, We should get more information like DCI, UCI and so on. That is not enough ! confidential MCB-1QST11067

21 3.1 How to get DCI Open the “ ” file and find DCI according [SFN, Subframe] and [Progress Time] as below. Get [SFN, Subframe] and [Progress Time] of target from trace. -Apply the excel filtering at the 1st row of data. -Set the “System Frame Number” column to “363”, “Sub Frame Number” column to “1”. -Determine the row by “24.1”, if multiple rows have been filtered. -Find the DCI information at “DCI ” column. UEeNB DCI & DL Message confidential MCB-1QST11067

22 3.2 How to get UL HARQ Feedback Get [SFN, Subframe] and [Progress Time] of target from trace. Calculate Timing of the UL HARQ Feedback by [SFN, Subframe] as below. -FDD [SFN, Subframe] + 4 subframe -TDD [SFN, Subframe] + x subframe, x is depend on TDD UL-DL configuration (Refer to TS.36.213 -7.3) -Apply the excel filtering at the 1st row of data. -Set the “System Frame Number of UCI ” column to “363” the “Sub Frame Number of UCI ” column to “1+4 = 5 ”. -Determine the row by “24.1”, if multiple rows have been filtered. -Find UL HARQ Feedback at the “HARQ-AN of Received value of DCI ” column. UEeNB DCI & DL Message ACK confidential MCB-1QST11067 Open the “ ” file and find DCI according calculated values and [Progress Time] as below.

23 Open the “ ” file and find DCI according [SFN] and [Progress Time] as below. 3.3 How to get SR Get [SFN] and [Progress Time] of target from trace. -Apply the excel filtering at the 1st row of data. - Set the “System Frame Number of UCI ” column to the value less than or equal to “366” -Determine the row by “24.1”, if multiple rows have been filtered. -Set “1” at “SR of Received value of DCI ” column. UEeNB DCI & DL Message ACK SR UL Message confidential MCB-1QST11067

24 How to calculate SR Timing SFN[0-1023]Slot index [0-19] TS36.213 -10.1 rrcConnectionSetup →Scheduling RequestConfig + sr-ConfigurationIndex = 30 365 15 20 5 confidential MCB-1QST11067

25 3.4 How to get UL grant Get [SFN, Subframe] and [Progress Time] of target from trace. Open the “ ” file and find DCI according calculated values and [Progress Time] as below. -Apply the excel filtering at the 1st row of data. -Determine the row by “24.1”, if multiple rows have been filtered. Calculate Timing of the UL grant by [SFN, Subframe] as below. -FDD [SFN, Subframe] - 4 subframe -TDD [SFN, Subframe] - x subframe, x is depend on TDD UL-DL configuration (Refer to Table 8-2 of TS36.213) UEeNB DCI & DL Message ACK SR UL Message UL grant -Set the “System Frame Number” column to “365”, the “Sub Frame Number” column to “9”. -Find the UL grant at “DCI ” column. -Set the “DCI Format” column to “DCI FORMAT_0” MCB-1QST11067

26 3.5 How to get DL HARQ Feedback (HI) Get [SFN, Subframe] and [Progress Time] of target from trace. -Apply the excel filtering at the 1st row of data. -Determine the row by “24.1”, if multiple rows have been filtered. Calculate Timing of the UL grant by [SFN, Subframe] as below. -FDD [SFN, Subframe] + 4 subframe -TDD [SFN, Subframe] + x subframe, x is depend on TDD UL-DL configuration (Refer to TS36.213 - 9.1.2 ) -Set the “System Frame Number” column to “366”, the “Sub Frame Number” column to “3+4=7”. -Find the DL HARQ Feedback at the “HARQ Indicator of HI” column. UEeNB DCI & DL Message ACK SR UL Message UL grant ACK(HI) confidential MCB-1QST11067 Open the “ ” file and find DCI according calculated values and [Progress Time] as below.

27 Add trace converter GUI