Presentation is loading. Please wait.

Presentation is loading. Please wait.

NR LINK OPTIMUM II ADSL 2/2+ Service Verification Test Gear OPII TM

Similar presentations


Presentation on theme: "NR LINK OPTIMUM II ADSL 2/2+ Service Verification Test Gear OPII TM"— Presentation transcript:

1 NR LINK OPTIMUM II ADSL 2/2+ Service Verification Test Gear OPII TM
SOLUTIONS SDN BHD

2 OPTIMUS II Product Briefing
AGENDA OPTIMUS II Product Briefing OPTIMUS II User Guide TM SOLUTIONS SDN BHD

3 NR LINK OPTIMUM II Product Briefing TM SOLUTIONS SDN BHD

4 INTRODUCTION NR LINK OPTIMUM Test Gear has been used by the TM’s TOLLGATE team since July 2007. There are two types of test gear: NR LINK OPTIMUM NR LINK OPTIMUMII (OPII) NR LINK OPTIMUM II is a handheld tester that can do service verification and first level troubleshooting ADSL/ADSL2/2+ services at any point (in between Access Network and CPE). A cost-effective & user-friendly solution Robust Device Lightweight Handheld Rugged TM SOLUTIONS SDN BHD

5 FEATURES Designed with a built-in ADSL 2/2+ Modem Module with Infineon PSB7200ZDW chipset to test ADSL/ADSL 2+ service line User-friendly scroll menu in LCD to display: Status/Info Inventory Update/Info Testing (Send test report) It has an analog phone module include with hands-free for PSTN line testing It is lithium-Ion battery operated It has battery level Indicator to show the battery capacity Web Configuration in Graphical User Interface TM SOLUTIONS SDN BHD

6 ENHANCEMENT TM SOLUTIONS SDN BHD NR LINK OPTIMUM (2007)
NR LINK OPTIMUM II (2010) ADSL / ADSL 2 / ADSL 2+ (Conexant /Infineon chipset) (Infineon chipset) Web Configuration in Graphical User Interface Battery and LED indicator Low Battery LED indicator DC voltage protection module Operation voltage level is from 3.2v to 6.8v 4xNiMH battery with external fast charger (UNIROSS) Li-Ion Battery with built-in charger or external DC operated N/A User-friendly scroll menu in LCD Phone Module with hands-free set Controller Module for communication with built-in character LCD with backlight and keypad New functionality : Inventory (Update and view port status) Testing ( Send test report to server) TM SOLUTIONS SDN BHD

7 NR LINK OPTIMUM VS OPTIMUM II
PRODUCT NR LINK OPTIMUM (2007) NR LINK OPTIMUM II (2010) TECHNOLOGY ADSL / ADSL 2 / ADSL 2+ BATTERY LCD DISPLAY KEYPAD BUILT-IN SPLITTER PHONE TM SOLUTIONS SDN BHD

8 DSLAM/MSAN TESTING Average DSL handshaking time : < 30 sec
ZTE MSAN Lucent DSLAM (ATM) Huawei MSAN Huawei RDSLAM Fujitsu IPDSLAM LG RDSLAM Lucent IPDSLAM Lucent RTDSLAM Huawei IPDSLAM Hyundai RDSLAM Alcatel DSLAM Marconi LG DSLAM Fujitsu (8 port/16 port/24 port) INTEROPERABILITY TEST RESULT Average DSL handshaking time : < 30 sec Average PPP UP time : < 20 sec TM SOLUTIONS SDN BHD

9 PRODUCT BROCHURE (NR LINK OPTIMUM 1.0)

10 PRODUCT BROCHURE (NR LINK OPTIMUM 2.0)
NRLINK Solutions Sdn Bhd 27-1, Block C, Bistari De Kota,  Jalan Teknologi 3/9, Kota Damansara, Petaling Jaya, Selangor, MALAYSIA Tel#: ;  Fax #:

11 ACHIEVEMENTS (NR LINK OPTIMUM II)
MALAYSIA’S MOST INNOVATIVE PRODUCT, ITEX MALAYSIA 2009 GOLD AWARD IN TELECOMMUNICATION PRODUCT, ITEX MALAYSIA 2009 MOST OUTSTANDING INVENTION AWARD, TMR&D BREAKTHROUGH 2009 GOLD AWARD IN TELECOMMUNICATION CATEGORY, TMR&D BREAKTHROUGH 2009 TM SOLUTIONS SDN BHD

12 CAUTION Operational time is estimated around 3 hours with continuously ON. Prior to first time use, please ensure that the battery is charged for 8 hours minimum Use ONLY the specified charger Model 3P10-L1004 (included with the device While charging, the device MUST be completely SWITCHED-OFF Use the device only with battery securely connected The charging time is about 4 hours. When battery is at the critical level, the low battery warning will be display at LCD and LED will blink in red. Please do not leave the batteries inside when the test gear is not used for more than 5 days. Please do not leave the batteries inside when the test gear is not used for more than 5 days. TM SOLUTIONS SDN BHD

13 OPTIMUM II User Guide TM SOLUTIONS SDN BHD

14 NR LINK OPTIMUM II PACKAGE
1 Set OPTIMUM II 1 Set RJ II c/w Crocodile Clip 1 Set RJ45 1 Set Li-Ion Battery 1 Set Battery Charger 1 Set Hands-free Headset 1 Set Sling Bag 1 Set Hand Strap 1 Set OPTIMUM II Manual 1 Set OPTIMUM II Precaution Sheet TM SOLUTIONS SDN BHD

15 NR LINK OPTIMUM II – FRONT VIEW
LCD Screen LED for:- Power,DSL,PPP,Network Left Button Enter Button Phone Keypad Right Button On Hook /Off Hook Battery Indicator TM SOLUTIONS SDN BHD

16 NR LINK OPTIMUM II – TOP VIEW
Line Ethernet Reset Button Switch On/Off Button Power TM SOLUTIONS SDN BHD

17 NR LINK OPTIMUM II - LED TM SOLUTIONS SDN BHD Low Battery Phone DSL
PPP Power Network TM SOLUTIONS SDN BHD

18 To display the ADSL information
MENU: Status/Info To display the ADSL information TM SOLUTIONS SDN BHD

19 MENU: Status/Info TM SOLUTIONS SDN BHD

20 Estimate Line Distance (m/km)
MENU: Status/Info – cont. STATUS/INFO Output DSL Status UP or DOWN PPP Status Connected or Not Connected Speed (kbps) Uplink Downlink SNR Margin (dB) Attenuation (dB) Estimate Line Distance (m/km) xxx m/km Modulation ADSL G.dmt / ADSL 2/2+ Error Counter Trasmit Receive IP Address xxx.xxx.xxx.xxx IP Gateway Ping Server (ms) Tx Rx Avg Mac Address xxxxxxxxxx TM SOLUTIONS SDN BHD

21 To display inventory info and update service number.
MENU: Inventory To display inventory info and update service number. TM SOLUTIONS SDN BHD

22 MENU: General – cont. General Menu shows the :-
NR LINK OPTIMUM II Version Modem Version TM SOLUTIONS SDN BHD

23 MENU: Inventory NEXT TM SOLUTIONS SDN BHD

24 MENU: Inventory – cont. NEXT TM SOLUTIONS SDN BHD

25 MENU: Inventory – cont. TM SOLUTIONS SDN BHD

26 INVENTORY WORKFLOW TM SOLUTIONS SDN BHD Update Menu Y Menu or Update*
Setup Test Gear at Cust Line Update in NIS Enter Authentication Code DSL stable PPP on Choose Inventory at Main Menu Display Port Inventory Send to Server Go to Main Menu Enter Phone Number Submit DSL Status DOWN PPP Status NOT CONNECTED N TM SOLUTIONS SDN BHD

27 MENU: Testing To send test report. TM SOLUTIONS SDN BHD

28 MENU: Testing – cont. NEXT TM SOLUTIONS SDN BHD

29 MENU: Testing - cont TM SOLUTIONS SDN BHD Select Location Type MDF
Cabinet/SDF Distribution Point Customer Premises TM SOLUTIONS SDN BHD

30 SEND TEST REPORT WORKFLOW
Y Match Setup Test Gear at Cust Line Update in Server Enter Authentication Code DSL stable PPP on Choose Testing at Main Menu Send to Server Go to Main Menu Enter Phone Number Select Test Location DSL Status DOWN PPP Status NOT CONNECTED Display Message N TM SOLUTIONS SDN BHD

31 MESSAGE DISPLAYED TM SOLUTIONS SDN BHD No Message Possible Cause 1
Successful Transaction successful 2 Invalid Authentication Code User not registered Wrong Authentication code 3 Data not updated Problem in updating data to database 4 Invalid data Missing data/parameter during transmission to server. 5 Error in database update 6 Inventory not in database Port not in database 7 Phone number mismatched Wrong entering Service Number 8 Unregistered Device Device not registered 9 Connection not established Connection to server is not successful DSL/PPP is not UP 10 Device status Working Faulty Send Repair Under Repair BSQM Stolen Not Used TM SOLUTIONS SDN BHD

32 To show the firmware version
MENU: General To show the firmware version TM SOLUTIONS SDN BHD

33 General Menu shows the :-
MENU: General – cont. General Menu shows the :- OPTIMUS II Version Modem Version TM SOLUTIONS SDN BHD

34 MENU: General TM SOLUTIONS SDN BHD

35 MAKING PHONE CALL TM SOLUTIONS SDN BHD

36 WARRANTY Generally, the warranty period for each of OPTIMUM II Test Gear is 5 years except for: Battery (1 year) Hand-free Headset (1 year) Battery Charger (1 year) TM SOLUTIONS SDN BHD

37 NRLINK SOLUTIONS SDN BHD ( M)‏ (formerly known as Shannimpex Sdn Bhd)‏ No.27-1, Block C, Bistari De Kota Jalan Teknologi 3/9 Kota Damansara Petaling Jaya Selangor MALAYSIA TM SOLUTIONS SDN BHD

38 TM SOLUTIONS SDN BHD


Download ppt "NR LINK OPTIMUM II ADSL 2/2+ Service Verification Test Gear OPII TM"

Similar presentations


Ads by Google