Presentation is loading. Please wait.

Presentation is loading. Please wait.

EUREF Symposium Toledo 2003 ETRF-Austria 2002 EUREF-Campaign for the introduction of ETRS89 in AUSTRIA N. Höggerl, G. Stangl (BEV) E. Fragner, R. Weber.

Similar presentations


Presentation on theme: "EUREF Symposium Toledo 2003 ETRF-Austria 2002 EUREF-Campaign for the introduction of ETRS89 in AUSTRIA N. Höggerl, G. Stangl (BEV) E. Fragner, R. Weber."— Presentation transcript:

1 EUREF Symposium Toledo 2003 ETRF-Austria 2002 EUREF-Campaign for the introduction of ETRS89 in AUSTRIA N. Höggerl, G. Stangl (BEV) E. Fragner, R. Weber (TUW)

2 EUREF Symposium Toledo 2003 Intentions Setting up a new national frame Based on GPS permanent stations Inclusion of non-governmental stations ETRS89 as a common system Free data access (post processing) confirmed Quality certificate (at least Class B) needed

3 EUREF Symposium Toledo 2003 Former net (2 permanent, 9 markers)

4 EUREF Symposium Toledo 2003 New net (10 permanent, 1 marker)

5 EUREF Symposium Toledo 2003 Date GPS Week and Day No. Session Number Start Time Stop Time 21-July-200211760202000:00:0023:59:30 22-July-200211761203000:00:0023:59:30 23-July-200211762204000:00:0023:59:30 24-July-200211763205000:00:0023:59:30 25-July-200211764206000:00:0023:59:30 26-July-200211765207000:00:0023:59:30 27-July-200211766208000:00:0023:59:30 Sessions of the pseudo-campaign

6 EUREF Symposium Toledo 2003 Data processing Bernese Software 4.2 Processing standards of EPN First solution constrained to GRAZ at epoch of measurements Official solution constrained to GRAZ, PENC, WTZR, ZIMM Transformation from ITRF2000 to ETRS89

7 EUREF Symposium Toledo 2003 Processing quality (7 sessions, 14 stations, 2 ACs)

8 EUREF Symposium Toledo 2003 StationNorth [mm]East [mm]UP [mm] GRAZ 11001M0020.44.0-10.7 HFLK 11006S0032.710.9 PENC 11206M006-1.80.7-4.9 PFAN 11005S002-1.91.40.2 WTZR 14201M0100.1-1.40.3 ZIMM 14001M0040.3-2.74.5 Comparison GRAZ constrained -> ITRF2000

9 EUREF Symposium Toledo 2003 StationNorth [mm]EAST [mm]UP [mm] GRAZ 11001M0020.42.6-6.3 HFLK 11006S0030.1-0.92.2 LINZ 11033S0010.3 -0.3 PENC 11206M006-1.50.3-0.6 PFAN 11005S0020.1-1.22.8 SBGZ 11031S0010.0-0.30.7 WTZR 14201M0100.2-1.44.6 ZIMM 14001M0040.4-2.68.8 GUES 11045M001-0.30.9-2.1 AT01 11027M0020.00.5-1.2 HKBL 11039S0010.1 -0.6 KOET 11046M0010.00.5-1.6 VLCH 11036S0010.00.6-1.7 WIEN 11035S001-0.10.9-2.1 Transformation GRAZ constrained -> 4 IGS stations constrained

10 EUREF Symposium Toledo 2003 Conclusions Change from markers to permanent stations necessary (users acceptance) ETRS89 for international compatibility Maintenance and permanent monitoring possible Same quality as EPN stations Accept proposal, please!


Download ppt "EUREF Symposium Toledo 2003 ETRF-Austria 2002 EUREF-Campaign for the introduction of ETRS89 in AUSTRIA N. Höggerl, G. Stangl (BEV) E. Fragner, R. Weber."

Similar presentations


Ads by Google