Presentation is loading. Please wait.

Presentation is loading. Please wait.

11 th Annual Sucker Rod Pumping Workshop Renaissance Hotel Oklahoma City, Oklahoma September 15 – 18, 2015 Breakout Session Summary Failure Rates and Failure.

Similar presentations


Presentation on theme: "11 th Annual Sucker Rod Pumping Workshop Renaissance Hotel Oklahoma City, Oklahoma September 15 – 18, 2015 Breakout Session Summary Failure Rates and Failure."— Presentation transcript:

1 11 th Annual Sucker Rod Pumping Workshop Renaissance Hotel Oklahoma City, Oklahoma September 15 – 18, 2015 Breakout Session Summary Failure Rates and Failure Analysis Facilitated by Mark Turland, Tom Cochrane

2 Sept. 15 – 18, 2015 2015 Sucker Rod Pumping Workshop2 What was Discussed? Deep and/or deviated rod pumping Typical failure challenges –Rod Failures; connections & corrosion –Tubing and Pumps Failure Rates 0.7 to 0.9. Several were higher but quick results from focused failure reduction Failure Meetings –Most reviewing the worst of repeat wells with relevant vendors, production, rig supervisors Failure Data (rig, chemical, pump, tubing) Mechanical cause easier to identify. The challenge is in finding solutions

3 Sept. 15 – 18, 2015 2015 Sucker Rod Pumping Workshop3 Where any Conclusions or Recommendations Made? Sucker Rods –Connection failures, and just below the upset; micro pits you have trouble seeing –Option to load C & D rods to 135% in corrosive service –Need better spacing recommendations in design programs; too much heat elongation –Need to be perfect in handling and makeup for deep wells; rig crew training –Need a rod inspection facility close to the field. Wary of extra handling required for inspection –Lay down string with known problems; can you afford to / afford not to

4 Sept. 15 – 18, 2015 2015 Sucker Rod Pumping Workshop4 Where any Conclusions or Recommendations Made? Deviated Wells –Guide > 30-50 lbf sideload –Little consensus around sideload max; some using dogleg criteria –Wear intervals move up the hole –Drilling directional surveys suspect; do a gyro and get a good survey density

5 Sept. 15 – 18, 2015 2015 Sucker Rod Pumping Workshop5 Where any Conclusions or Recommendations Made? Tubing –Verify rig floor inspected red joints with ultrasonic, camera –Look for external tubing wear for mis-set tubing anchor –Do a good tubing anchor setting calculation. You may need higher tubing grades shallow in deep wells, for the tensile strength –Need aggressive chemical treatment on startup and solid thereafter

6 Sept. 15 – 18, 2015 2015 Sucker Rod Pumping Workshop6 Where any Conclusions or Recommendations Made? Automation –Most have some automation, half have full automation, a few have full time monitoring on SCADA for problems –Some using SCADA data in failure meetings

7 Sept. 15 – 18, 2015 2015 Sucker Rod Pumping Workshop7 Who Attended the Breakout Session? TotalOperatorService Company Consultant 292153

8 Sept. 15 – 18, 2015 2015 Sucker Rod Pumping Workshop8 Summary Should this Breakout Session be repeated? Should this Breakout Session be repeated? –YesYes Should changes be made for the future? –Scribe with laptopScribe with laptop Any other recommendations.

9 Sept. 15 – 18, 2015 2015 Sucker Rod Pumping Workshop9 Copyright Rights to this presentation are owned by the company(ies) and/or author(s) listed on the title page. By submitting this presentation to the Sucker Rod Pumping Workshop, they grant to the Workshop, the Artificial Lift Research and Development Council (ALRDC), and the Southwestern Petroleum Short Course (SWPSC), rights to: –Display the presentation at the Workshop. –Place it on the www.alrdc.com web site, with access to the site to be as directed by the Workshop Steering Committee. –Place it on a CD for distribution and/or sale as directed by the Workshop Steering Committee. Other use of this presentation is prohibited without the expressed written permission of the author(s). The owner company(ies) and/or author(s) may publish this material in other journals or magazines if they refer to the Sucker Rod Pumping Workshop where it was first presented.

10 Sept. 15 – 18, 2015 2015 Sucker Rod Pumping Workshop10 Disclaimer The following disclaimer shall be included as the last page of a Technical Presentation or Continuing Education Course. A similar disclaimer is included on the front page of the Sucker Rod Pumping Web Site. The Artificial Lift Research and Development Council and its officers and trustees, and the Sucker Rod Pumping Workshop Steering Committee members, and their supporting organizations and companies (here-in-after referred to as the Sponsoring Organizations), and the author(s) of this Technical Presentation or Continuing Education Training Course and their company(ies), provide this presentation and/or training material at the Sucker Rod Pumping Workshop "as is" without any warranty of any kind, express or implied, as to the accuracy of the information or the products or services referred to by any presenter (in so far as such warranties may be excluded under any relevant law) and these members and their companies will not be liable for unlawful actions and any losses or damage that may result from use of any presentation as a consequence of any inaccuracies in, or any omission from, the information which therein may be contained. The views, opinions, and conclusions expressed in these presentations and/or training materials are those of the author and not necessarily those of the Sponsoring Organizations. The author is solely responsible for the content of the materials. The Sponsoring Organizations cannot and do not warrant the accuracy of these documents beyond the source documents, although we do make every attempt to work from authoritative sources. The Sponsoring Organizations provide these presentations and/or training materials as a service. The Sponsoring Organizations make no representations or warranties, express or implied, with respect to the presentations and/or training materials, or any part thereof, including any warrantees of title, non-infringement of copyright or patent rights of others, merchantability, or fitness or suitability for any purpose.


Download ppt "11 th Annual Sucker Rod Pumping Workshop Renaissance Hotel Oklahoma City, Oklahoma September 15 – 18, 2015 Breakout Session Summary Failure Rates and Failure."

Similar presentations


Ads by Google