Presentation is loading. Please wait.

Presentation is loading. Please wait.

Group # 3 Week 10. Progress so far ► Writing the progress report. ► Writing and edit code to send and receive SMS messages ► Writing code in VB to interprets.

Similar presentations


Presentation on theme: "Group # 3 Week 10. Progress so far ► Writing the progress report. ► Writing and edit code to send and receive SMS messages ► Writing code in VB to interprets."— Presentation transcript:

1 Group # 3 Week 10

2 Progress so far ► Writing the progress report. ► Writing and edit code to send and receive SMS messages ► Writing code in VB to interprets NMEA statement ► Design the interface for the program for Pocket PC ► Design Database in Access to store information to tracking vehicles

3 Tasks ► Ali: Writing and edit code to send and receive SMS messages using AT commands ► AHMAD: Writing code in VB to interprets NMEA statement ► MUHAMMAD: Design the interface for the program for Pocket PC and serial connection ► SALEH: Design Database in Access to store information to tracking vehicles.

4 Pocket PC

5 The Application in PC ► The application send and receive SMS message by connect to mobile by using serial connection ► Send and receive SMS message by using AT commands. The programs use program written by members in previous COE 400 project. ► The program is edit to make it work for our project.

6 The Database

7 Plan for coming week ► Writing the code in VB that parse GPS data ► Debugging & Testing GPS parsing ► Write the code in PC programs to use Database ► Drawing The position of the vehicles in the map


Download ppt "Group # 3 Week 10. Progress so far ► Writing the progress report. ► Writing and edit code to send and receive SMS messages ► Writing code in VB to interprets."

Similar presentations


Ads by Google