Goals/ Objectives Safe PortableAffordableEasy to use Reliabl e Score Safe***11114 Portable0***1001 Affordable00***000 Easy to use011***13 Reliable0110***2.

Similar presentations


Presentation on theme: "Goals/ Objectives Safe PortableAffordableEasy to use Reliabl e Score Safe***11114 Portable0***1001 Affordable00***000 Easy to use011***13 Reliable0110***2."— Presentation transcript:

1 Goals/ Objectives Safe PortableAffordableEasy to use Reliabl e Score Safe***11114 Portable0***1001 Affordable00***000 Easy to use011***13 Reliable0110***2 Back 

2 Back 

3 S olutions with E lectrical E ngineering K nowledge Team Members:- Kamal Al Khuffash 920012902 Abdullah Al Qaydi 920011367 Syed Ghufran Hashmi 920013717 Project Management for “Toys for Special Needs Children” project

4 Outline:- Introduction: – Project overview Purpose Stakeholders – Clarifications of client needs Original Client statement Objectives and constraints Revised Client statement Project Management – Approach – Work breakdown schedule – Obstacles Conclusion and request to proceed

5 Project Overview The team intends to build an educational toy for special needs children to develop their learning skills. Our client is the “Special Care Center” in Abu Dhabi, and will be used by the children in the center.

6 Client Statement “The Special Care Center is seeking proposals from experienced engineering companies for the design of an educational toy for use in our classrooms. The toy should be suitable for children with varying disabilities and should be appropriate for use in a class room environment. The toy must be safe, affordable and reliable.”

7 Objectives Safe Portable Affordable Easy to use Reliable Pair wise comparison chart Objectives tree

8 Revised Client statement “The team should build an educational toy to support the learning experience of the special needs children in the Special Care Center. As the client has stated the toy will be used by children with various disabilities in a classroom environment, therefore it is important that the toy has to be portable. The client also required the toy should be easy to use by the teachers and the children themselves with a minimum purchase cost. The most important factors that the toy’s safety and reliability should be guaranteed.”

9 Project Management Reasons. Tools Used – GANTT Chart – Percentage Completion Matrix “PCM” – Linear Responsibility Chart “LRC” Progress

10 The Team Approach Problem Definition Conceptual design Detailed Design Building the prototype Testing the prototype ObjectivesFunctionsMeans Evaluation Matrix * Circuit * Materials * Dimensions * Codes

11 Work Breakdown Schedule

12 Obstacles Time Management Looking for alternatives Early deadline

13 Summery Objectives – Safe – Portable – Affordable – Easy to use – Reliable Revised Client statement – “The team should build a safe, portable, affordable, easy to use and reliable educational toy to support the learning experience of the special needs children in the Special Care Center.” Project Management – GANTT Chart – LRC – PCM

14 Any Questions?? S olutions with E lectrical E ngineering K nowledge