Presentation is loading. Please wait.

Presentation is loading. Please wait.

…or the Josh title Wet Cable Ahoy!

Similar presentations


Presentation on theme: "…or the Josh title Wet Cable Ahoy!"— Presentation transcript:

0 The Internet Growth Sparks Submarine Cables Builds
Sylvie LaPerriere Dir. Peering & Commercial Operations Presentation deck 1 of 2 GPF 4 – Punta Cana 30 Jan 2009

1 …or the Josh title Wet Cable Ahoy!
GPF 4 – Punta Cana

2 World Internet Users Key Markets: Asia, Europe, North America
Asia users almost equal Europe and North America combined. Growth > 400% (2000 – 2007) Emerging markets (high user growth, low penetration) Middle East Africa Latin America / Caribbean CORPORATE Source:

3 Growing Importance of India & China in the New World
Source: Morgan Stanley; Tata Communications Research Working Population 2010, millions Addition to Working Pops In fact, in the next few years, India, China and Africa will contribute nearly two thirds of all increase in working population to the world. CORPORATE

4 Growing Importance of India & China in the New World
Population Distribution (2007) Mobile Subscriber Adds ( ) Source: Morgan Stanley, Gartner, Tata Comms Research CORPORATE

5 Upcoming Submarine Cables in Emerging Markets
Asia Middle East Africa + India Infrastructure GPF 4 – Punta Cana

6 Commencement of New Submarine Cable Projects
TGN Eurasia Intra-Europe Trans-Pacific London Trans-Pacific New York Frankfurt San Francisco Tokyo Hong Kong Trans-Atlantic Mumbai SMW 3 & 4; FEA TGN Intra-Asia Singapore TIC, i2i & SMW 4 New Cables SAT3 & SAFE Capacity Purchase Cable Name Connecting Ownership TGN-Intra Asia Singapore Hong Kong, Japan, Vietnam, Philippines Majority Owner TGN-Eurasia India to France via Egypt Cable Name Connecting Ownership IMEWE India, Middle East, Egypt, Italy, France Consortium Member SEACOM India, Egypt, South Africa Initial Capacity Owner CORPORATE

7 Intra-Asia Networks CORPORATE

8 Asia : TGN-IA Overview Day One Landing Points Overview
City-to-City Connectivity Full Range of Service Offerings including: E1, DS-3, STM-1 through STM-16 Unprotected 10G Wavelength Service E-1 though STM-4 Protected Ethernet Services Lease & IRU Contracts available Asia : TGN-IA Overview Day One Landing Points Expected Latencies Overview Length: 6,700 km # of Fiber Pairs: 4 Initial Capacity: 650Gbps Design Capacity: 3.84Tbps Speeds: STM-1/4/16 & 10G Singapore Tokyo Guam Philippines Hong Kong Vietnam Sin POP – Jp POP  = 63msec RTD Sin POP – HK POP = 33msec RTD HK POP – Jp POP  = 45msec RTD Sin POP – Vietnam CLS = 16.3msec RTD Vietnam CLS – Ph CLS = 24msec RTD Ph CLS – Japan POP = 33msec RTD CORPORATE 8

9 TGN-IA Complements Existing Cable Systems in Asia
CORPORATE 9

10 Other Asian and Pacific projects
VSNL Intra Asia cable (RFS Q3 2008) Two Indonesia-Singapore cables Hong-Kong-Vietnam (Tricom Asia, US$60’) New-Caledonia-Hawaii New-Caledonia-Sydney Australia-Guam Pipe Networks, 1.92Tb, RFS March 2009 Australia-Hawaii (Telstra) South Asia Japan Cable RFS 2011+ CORPORATE

11 Transcontinenals….TGN – Eurasia
Tata Communications joint build with SEACom & Telecom Egypt, providing an owned route from Europe to India City-to-City Connectivity in Europe & India Full Range of Service Offerings including E-1, DS-3, STM-1 through STM-64 Protected and Unprotected Wavelength Services Ethernet Services Backhaul is included from Marseille Expected RFS: October 2009 Fibre Length ~ 9,240km 2 fiber pairs Day One Capacity: 160 Gbps Design Capacity: 1.28Tbps Design Life ~ 25 years Protected transit through Egypt Landing Locations: Mumbai – VSB Egypt – transit Marseille – Net Centre CORPORATE

12 Transcontinentals….IMEWE
Connectivity from Europe to India and other MENA countries Expected Length ~ 14,000km Landing Stations Mumbai Landing - BKC Marseille Landing – FT City-to-City Connectivity in Europe & India Full Range of Service Offerings including E-1, DS-3, STM-1 through STM-64 Protected and Unprotected (via other systems) Ethernet Services Expected RFS: 1Q2010 CORPORATE

13 Africa: SEACom Cable System
First Cable system connecting E. Africa to S. Africa, India and Europe Length: 13,000km Cable Locations: South Africa (Mtunzini) Mozambique (Maputo) Madagascar (Toliary), Tanzania (Dar es Salaam) Kenya (Mombasa) India (Mumbai) Djibouti (Djibouti) France (Marseille) Ultimate Capacity: 1,280 Gbps City-to-City Connectivity onto the Tata Communications Networks in Europe, India, & USA Full Range of Service Offerings including: E1, DS-3, STM-1 through STM-64 Lease and IRU Contracts available Expected RFS: 2H2009 CORPORATE

14 Africa: SAT-3/SAFE Connectivity Into S. Africa with Tata Communications partner, Neotel Sister company Neotel is second national operator in South Africa Joint Neotel-Tata international service Both International and domestic data service Neotel owned national long distance and metro network in South Africa provides diversity from existing networks Johannesburg Cape Town Durban City-to-City Connectivity in Europe, India, and S. Africa Full Range of Service Offerings including E-1, DS-3, STM-1,and STM-4 Consortium Restored on SMW-3 Ethernet Services Backhaul is included CORPORATE

15 Africa: the three SAT’s
                                                                                                                                                                    SAT-1: 1968 SAT-2: 1993 SAT-3: 2001 WASC/SAFE: 2002 See: CORPORATE

16 Latin America/ Caribbean
Mercosur countries SAM1 (Telefonica) New landing of SAM1 Cable in Columbia SAC/LAN (GlobalCrossing) Globenet Columbus Networks completed its Caribbean Crossing (east) Maya Arcos New systems announced for DR, NL Antilles CORPORATE

17 Tata National India Network
40,000 km transmission network 170 points of presence across India Covering 300 cities and towns High service uptimes through diverse fiber routes and state of the art Ciena core director network Dual Pop architecture in 4 metros Cost effective DWDM network Aggressive expansion across India Creation of express network connecting major metros 17

18 Tata Metro Area Fiber Network
32+ Metro Fiber Networks Direct Connectivity onto the NPL Network Full Range of Service Offerings including E-1, DS-3, STM-1 and STM-4 Protected and Unprotected Ethernet Services Mumbai, Pune, Delhi & NCR, Bangalore, Chennai, and Hyderabad E-1 through STM-64 Wavelength Services Presence in Major Carrier Hotels MAN Network MAN PoP

19 Tata WIMAX Network Last mile solution in 110+ Towns
Directly integrated with the MPLS backbone Reliable Secure Service Offerings including Up to 2Mbps Jamnagar Junagadh WIMAX Network Wimax Location Upcoming Wimax Location

20 Cable breaks part III December 19, 2008
Part I : Taiwan Earthquake 26 Dec 2006 Part II: Mediterranean Cuts Jan 2008 Part III: Triple Break off Italy Dec 2008 GPF 4 – Punta Cana

21 Part I AS6453 Asia Backbone circa Dec 2006 | Physical Routes Diversity
TransPac: C-US | J-US | TGN-P FLAG FNAL TOKYO TGN-P Intra-Asia: FNAL | APCN | APCN-2 | EAC | SMW-3 EAC APCN-2 J-US Shima HONG KONG SMW-3 LONDON SMW-4 APCN CH-US Pusan MUMBAI KUALA LUMPUR Chongming PALO ALTO Fangshan MUMBAI TIC Shantou LOS ANGELES SINGAPORE IN PROGRESS EXISTING LEGEND MANILLA CORPORATE As of December 26th, 2006

22 Part I Taiwan Earthquake December 26, 2006 | Cable Faults
FLAG FNAL TOKYO TGN-P EAC APCN-2 J-US Shima HONG KONG SMW-3 LONDON SMW-4 APCN CH-US Pusan MUMBAI KUALA LUMPUR Chongming PALO ALTO Fangshan MUMBAI TIC Shantou LOS ANGELES SINGAPORE IN PROGRESS EXISTING LEGEND MANILLA CORPORATE As of December 26th, 2006

23 Part I Taiwan Earthquake December 26, 2006 | Remaining Cable Routes
TOKYO TGN-P J-US EAC Shima EAC HONG KONG EAC LONDON APCN-2 SMW-4 Pusan MUMBAI KUALA LUMPUR Chongming PALO ALTO APCN-2 Fangshan MUMBAI CH-US TIC SMW-3 Shantou SMW-3 LOS ANGELES SINGAPORE EAC APCN-2 EAC IN PROGRESS EXISTING LEGEND MANILLA CORPORATE As of December 26th, 2006

24 Part III: Triple break – SWM4, SMW3, Flag
Dec. 19, 2008 Dec. 20, 2008 Dec. 21, 2008 0:00 8:00 16:00 0:00 8:00 16:00 0:00 8:00 16:00 24:00 08:06 GMT - FLAG 08:00 GMT - S’pore-USA 07:33 GMT - SMW3 20:00 GMT - S’pore-India 07:28 GMT - SMW4 09:30 GMT - India-USA 19:00 GMT - MENA-S’pore Europe Japan and USA Middle-East CORPORATE India Singapore

25 The Internet Growth Sparks Submarine Cables Builds
Sylvie LaPerriere Dir. Peering & Commercial Operations Presentation deck 2 of 2 GPF 4 – Punta Cana 30 Jan 2009

26 Operating Submarine Cables
GPF 4 – Punta Cana

27 Specialist Ships – Laying, Repair, ROVs Several Key Players
Cable Laying Specialist Ships – Laying, Repair, ROVs Several Key Players Cable Depots Worldwide CORPORATE

28 Most Cables now trenched offshore where permitted,
Specialist Equipment Burial capability, Work to 2500m, Most Cables now trenched offshore where permitted, Pre/Post Lay Inspections CORPORATE

29 Cable Faults JOLT - external aggression, anchor or skid from commercial fishing net but not actually breaking cable. Sometimes the bend is so sharp fibers will attenuate but not break, other times cable will part elsewhere along the cable. Planned restoration and repair required. Shunt Fault – external aggression, friction damage has caused damage to the cable but not actually breaking the cable. The damage extends to the core power cable causing a leakage to ground; though not always traffic affecting indicative of a larger problem. Planned Restoration and Repair required. Cable Break – immediate restoration and repair required Executed by Cable Administrator and RCO/RLO. CORPORATE

30 JOLT CORPORATE

31 Severe JOLT CORPORATE

32 Cable Break CORPORATE

33 Cable Break – Recovered Internal Section
CORPORATE

34 TGN Break – Net Material
CORPORATE

35 Backhaul Systems – Terrestrial and Landing
CORPORATE

36 Backhaul Systems – Terrestrial and Landing
CORPORATE

37 Thank You GPF 4 – Punta Cana


Download ppt "…or the Josh title Wet Cable Ahoy!"

Similar presentations


Ads by Google