Presentation is loading. Please wait.

Presentation is loading. Please wait.

UAMPS EXISTING RESOURCES Coal  Intermountain Power Project 253 MW  Hunter II 65 MW  San Juan 35 MW Gas--Nebo NGCC 141 MW Hydro275 MW Renewable 78 MW.

Similar presentations


Presentation on theme: "UAMPS EXISTING RESOURCES Coal  Intermountain Power Project 253 MW  Hunter II 65 MW  San Juan 35 MW Gas--Nebo NGCC 141 MW Hydro275 MW Renewable 78 MW."— Presentation transcript:

1

2 UAMPS EXISTING RESOURCES Coal  Intermountain Power Project 253 MW  Hunter II 65 MW  San Juan 35 MW Gas--Nebo NGCC 141 MW Hydro275 MW Renewable 78 MW Member Internal Generation 232 MW Market (mostly sourced from Coal) 255 MW

3 UAMPS VIEW ON CPP COMPLIANCE Impacts of CPP compliance on UAMPS will depend on the following: Uncertain Cost of CPP Compliance Will fixed O & M costs for coal be competitive if allowances cannot be acquired? Coal plant output may have to be reduced, reducing coal’s cost competiveness by having the same fixed O & M amortized over fewer MWh Similar issue with fixed fuel Coupled with Other Clean Air Act Compliance Obligations on Affected EGUs Allocation of CO 2 allowances by States under a mass based plan approach UAMPS’ CPP Compliance will focus on: Replacement of Coal Baseload Generation and Market Purchases with zero CO 2 emitting resources Incremental generation from load growth will be met by Energy Efficiency


Download ppt "UAMPS EXISTING RESOURCES Coal  Intermountain Power Project 253 MW  Hunter II 65 MW  San Juan 35 MW Gas--Nebo NGCC 141 MW Hydro275 MW Renewable 78 MW."

Similar presentations


Ads by Google