2 Objective and Description Build a scale model of a support structure for a water tower calculate loads on the structural members test the design physically with an initial model modify the design to optimize the performance of final design Our initial testing indicated that our design could hold 47 lbs. without any modifications, so with modification we suspect the model holding 55-65 lbs. Economic Analysis Costs 40 Girders ($1,250 each) =$50,000 56 Short Joints ($350 each) =$19,600 Water Tank=$30,000 Site preparation, water connections, and access=$55,000 Planning=$45,000 Total=$199,600 Receipts

3 Milestones

4 Further Engineering Further Analysis of Materials Test different designs Look at durability and reliability of design Find the actual limits of the design

5 Construction Plan Parts – Grooved top and bottom frames Four main support frames. Four extra support frames on each side Sandwich joints Details – Two top and bottom frames were added after the initial model test. Triangle shaped extra support frames. Four sticks combined sandwich joints. Description – Advantage of grooved frame and sandwich joint. 3″3″ 12″ 4.5″

6 Force Analysis WW F1 W F7 F8 F3 F1 F7 F4 F5 F8 F7 F6 Θ7Θ7 Θ1Θ1 Θ7Θ7 Θ6Θ6 Θ1Θ1 Θ1Θ1Θ5Θ5 Θ4Θ4 Θ3Θ3 Θ2Θ2 Θ1Θ1 Inside view of Sandwich Joint Advantage – Sandwich Joint and grooved frame. Pass W to the bottom Disadvantage – X-shaped cross bar & diagonal cross bar Grooved frame for top and bottom