Progress on Phase 1 of the Bing Kong Tong Building Renovation April-May 2014.

Similar presentations


Presentation on theme: "Progress on Phase 1 of the Bing Kong Tong Building Renovation April-May 2014."— Presentation transcript:

1 Progress on Phase 1 of the Bing Kong Tong Building Renovation April-May 2014

2 Forms and rebar at the front of the building ready to pour for shear walls.

3 Rafters getting reinforced Dry rot and broken rafters were reinforced to carry new roofing material.

4 LVLs (manufactured beams) were added at the rear and front of the building.

5 Concrete was poured into forms at the front and rear for shear wall support.

6 Old front parapet wall going down Main Street for storage at River Storage. It was removed due to dry rot damage.

7 Rebuilding of the new parapet wall to exact dimensions of the original.

8 The new parapet wall being placed

9 Installing insulation

10 Installing insulation prior to roofing