The Installation Process applicable for new buildings
3
Removal of dead mortar from the roof slab
6
Cleaning work in progress
8
Dead mortar removed from the surface of the roof slab
9
Roof slab after cleaning
10
Exposed reinforcements on the roof slab
11
Opening up of the floor-wall junction of parapet wall
12
Opening up of the floor-wall junction
13
Exposed floor-wall junction of column
14
Exposed floor-wall junction of parapet wall
15
Spraying of crystallization product on the roof slab towards waterproofing
17
Sealing of floor-wall junctions using polymer modified sealant
18
Sealing of floor-wall junctions using elastomeric compounds
19
Mixing concrete for slope making
20
Slope making in progress
21
Curing after slope making
24
Laying of bed mortar for fixing THERMATEK® Heat Resistant Terrace Tiles
25
Fixing of THERMATEK® Heat Resistant Terrace Tiles on the bed mortar
26
Laying of THERMATEK® Heat Resistant Terrace Tiles in progress
27
Tiling completed - before polishing
28
Cutting of tiles for skirting
29
45° cutting of skirting tiles
30
Skirting tiles ready for fixing
32
Fixing of skirting tiles
33
Polishing of THERMATEK® Heat Resistant Terrace Tiles in progress
35
THERMATEK® tiled terrace
37
Skirting
38
Skylight opening
39
The final look
41
Thank you! Manufacturer: ISHAAN INDUSTRIES "An Associate of Parashuram Pottery Works Co. Ltd. Gandevi Road, Bilimora - 396 380 Dist. Navsari, Gujarat. Contact Person: Mr. Amit Ganpule Tel: 02634 284416 Mobile: +91-9426117277 Website: http://www.thermatek.co.inhttp://www.thermatek.co.in E-mail: info@thermatek.co.ininfo@thermatek.co.in