Download presentation
Presentation is loading. Please wait.
1
Chapter 9 Ship’s Repair 4th 2-hour Nov. 29, 2010
2
grease reassemble in triplicate davit turning accessory brake lining
1. Review and warm-up 1.1 Translate the following words and phrases into Chinese grease reassemble in triplicate davit turning accessory brake lining guide roller ball bearing span tackle weather deck 油脂,涂油,润滑 重新装配 一式三份 吊艇柱 旋转附件 刹车片 导向滚轮 滚珠轴承 调节跨幅复式滑车 露天甲板
3
1.2 Translate the following sentences into Chinese.
The overall relative humidity of the ambient air must be below 85 percent before any paint application is allowed. Dry thickness of each coat to be spot checked. Application of paint must not start before approval by Owner’s Representative.
4
2. Anti-fouling composition consists largely of oxide of mercury, and if it comes into contact with the bare steel, it will set up corrosion hence the need of an anti-corrosive as an insulator. Anti-fouling coating is usually carried to the light load line and a cheaper paint called boottopping, applied between the light and load water marks when the ship is afloat.
5
1.3 Warm-up questions 1. The ship is built with mild steel, how to prevent its corrosion? To try and prevent this corrosion, the metal is coated with cement wash, bitumen and paint. 2. Can you list a few kinds of paint used on board? Metal primer, undercoat, top coat and heat-resistant paint,etc. 3. Before an area is painted, what preparation shall be made? Before an area can be painted, proper preparation is essential. It must be cleaned and washed with a cleaning solution to remove all salt, dirt and oil.
6
2. The study of Part Three 2.1 Passage One Paint Work Vocabulary mild [maild] adj. (1) 软的e.g. mild steel 软钢,低碳钢 (2) of weather not very cold, and therefore pleasant 温和的 e.g. mild winter (3) of people or their behaviour gentle and kind和善的;随和的 e.g. mild tone轻声细语 (4) of a flavour not strong, spicy or bitter (味道)不浓的;淡味的 e.g. mild beer
7
deteriorate [di5tiEriEreit] vt. to become worse变质;退化
e.g. (1)Idle houses deteriorate. 闲置不用的房子会渗漏衰败 (2)His sight have begin to deteriorate. 他的视力已经开始下降。 (3)Food is apt to deteriorate in summer. 食物在夏天爱变质。 sheathe [Fi:T] vt.(1) to cover something in a material, especially in order to protect it 盖;铺;包 e.g. to sheathe with a metal 镀金属包住 (2) to put a knife or sword into a sheath 把…插入鞘中 e.g. Sheathe your swords! 把你们的剑插到鞘里
8
dissolve [di5zClv] vt. (1) of a solid to mix with a liquid and become part of it 溶解 e.g. dissolve sugar in water 把糖溶化在水中 (2) to officially end a marriage, business agreement or parliament 解除(婚姻关系);终止(商业协议);解散(议会) e.g. To dissolve the marriage bond 解除婚姻关系 (3)to suddenly start laughing, crying, etc. 禁不住(笑起来或哭起来等) e.g. Pat will dissolve in tears at the least thing, the cry-baby. 帕特是个爱哭的孩子,哪怕是一点小事。 rinse [rins] vt. (1)to wash something with clean water only, not using soap (用清水)冲洗,洗涮 e.g. rinse the plates 把盘子冲一冲 (2)to remove the soap from something with clean water after washing it 冲掉…的皂液;漂洗;清洗 e.g. Rinse the soapy water away. 请把肥皂水漂洗乾净。
9
Passage One Paint Work Much of the work of the deck department on board a ship concerns the maintenance of the ship and her fittings. This is the responsibility of the chief officer. He and the men in his charge must protect the ship from the damaging effects of salt water, changes in temperature and the action of waves. The principal material used in building a ship is mild steel, and steel of different types is used for making most fittings and equipment. Unfortunately, steel undergoes a chemical change known as rusting when in contact with air, water or salt solutions. This causes the metal to deteriorate rapidly, unless some form of protection is given. concern: vt. have to do with or be relevant to有关于,关系到 protect…from: keep safe from harm or injury 保护e.g. Protect children from violence 保护儿童免遭暴力侵犯 (1)be in direct physical contact with接触 (2)be in or establish communication with 联系
10
To try and prevent this corrosion, the metal is coated with cement wash, bitumen and paint. Cement wash is a mixture of cement powder and fresh water. It is used in freshwater tanks and double bottom tanks. Bitumen is used in bilges and peak tanks. It is also used on metal decks before they are sheathed with wood. However, the principal protective coating is paint. There are many types of paint available nowadays in wide variety of colours and it is no longer necessary for the boatswain to mix himself. Paints are stowed in the paint locker, which is usually situated under the forecastle head. coat:vt. put a coat on; cover the surface of; furnish with a surface; e.g. coat the cake with chocolate variety: several different sorts of the same thing (同一事物的)不同种类,多种式样 本句翻译:现在有不同种类的多种颜色的油漆,不再需要水手长自己去调制了。 bilge 舭龙骨 available:obtainable or accessible and ready for use or service可获得的e.g. Pilot is available now. 现在有引水。
11
The most common kinds of paint found on board ship are as follows: metal primers, which are applied to a bare surface to give protection against rust and to act as a key to the next coat; undercoat, which are used over the primer before the top coat; top coats, which provide a hardwearing surface and give the required colour; heat-resistant paints for radiators and pipes and for the ship’s funnel; non-slip paints for use on weather decks and other suitable surfaces such as companion-ways; and varnishes to give a clear protective coat to woodwork. bare:adj. of surfaces not covered with or protected by anything 无遮盖的;没有保护的 raiator 散热器
12
For painting, the surface of a ship’s hull is divided into three distinct areas: the topside, boot-topping and bottom. Topside paint is supplied in the company’s colours or in light grey, if the vessel is a warship. It is applied to the area of the ship’s hull which is out of the water when the ship is loaded. Boot-topping is applied to that area of the hull which is out of the water when the ship is in the light condition and under water when the ship is loaded. A ship’s bottom is given a coating of anti-fouling paint. Anti-fouling paints contain toxicants which are poisonous to marine life. The toxicants have to dissolve out of the paint into the surrounding water in order to be effective. 本句翻译:油漆时,船壳表面明显可分为三个不同区域:水线上,水线间和船底。 supply: apply 涂,油漆 本句翻译:水线上油漆涂公司的颜色,如果是军舰,是浅灰色。 Which area does the boot-topping refer to? Where is the anti-fouling paint applied? How does it fuction?
13
Before an area can be painted, proper preparation is essential
Before an area can be painted, proper preparation is essential. It must be cleaned and washed with a cleaning solution to remove all salt, dirt and oil. The paintwork must then be rinsed with clean fresh water and all trace of the cleaning solution removed. Loose paint and scale is removed with a scraper and any heavy rust with a chipping hammer. Finally, a wire brush should be used on all bare metal to remove the last of the scale, before the first coat of paint is applied. Question: Before an are can be painted, what preparation shall be made? 省略句,应为:all trace of the cleaning solution (must be) removed 省略句,应为:any heavy rust (is removed) with a chipping hammer
14
2.2 Passage Two Anchor and Chain Reconditioning
Vocabulary discard [dis5kB:d] vt. to get rid of something that you no longer want or need 丢弃;抛弃 e.g discard an old pair of shoes 扔掉一双旧鞋 discard old traditional ideas 抛弃旧的传统观念 gauge (1) vt. to measure something accurately using a special instrument (用仪器)测量 e.g. gauge rainfall 侧雨量 (2) an instrument for measuring the amount or level of something 测量仪器(或仪表);计量器 e.g. tide gauge 潮标尺
15
flush [flQF] vt.(1) to clean something by causing water to pass through it (用水)冲洗净,冲洗 e.g. flush the toilet. 冲马桶 (2)(of a person or their face)to become red, especially because you are embarrassed, excited or hot 发红;脸红 e.g. flush with shame 因羞辱而脸红 flush with smiles 含羞带笑 unobstructed [5QnEb5strQktid] adj. 不被阻塞的;畅通无阻的 obstruct vt. block or prevent 妨碍/阻碍 e.g. obstruct the traffic妨碍交通 obstruction n. 障碍/障碍物 e.g. underwater obstruction 水下障碍物
16
In conjunction with the “Anchor and Chain Inspection” item detailed separately in this specification, labor, materials and equipment are furnished to perform the following relative to reconditioning the vessel’s anchors, chains and connecting hardware: (1)Disassemble and remove the connection links securing the eleventh (11th) shot in the port chain. Discard the shot of chain and connecting links. Receive a new, owner-furnished shot of chain and connection links and reassemble the chain as original. (2)Perform additional repairs and renewals on the anchors, chains and connecting hardware as found during the inspection and gauging process and as directed by the attending owner’s representative. 现在分词、过去分词短语和形容词短语均可做后置定语(postpositive attributive ),相当于对应的定语从句(attributive clause), 常用语书面语。 as original: like the form in which something was first produced or created 按原样 as 引导的省略句,状语从句主语与主句主语一致时,或从句主语是it,则be动词及其主语常可省略。如: I won't do my homework as (I'm) directed.
17
本句翻译:在两个锚、锚链和所有相关设备上均涂环氧树脂煤焦油漆,厚度为湿态7.4密耳,干态为5密耳。
Following inspection, gauging and all necessary repairs, apply one full coat of epoxy black at 7.4 mils wet, 5 mils dry film thickness to both anchors, chains and all connecting hardware. After the epoxy coating has thoroughly cured, properly mark the chains (connecting links) with Interlac CLB295 signal red and all shots marked with Interlac CLB000 white links in accordance with the following chain marking schedule. Note: the chain marking schedule is as follows: One (1) link on each side of the first shot connecting link shall be painted white and one (1) turn of #8 stainless steel wire shall be securely fastened around the stud of the first link on either side of the connecting link. following: after 在…之后 本句翻译:在两个锚、锚链和所有相关设备上均涂环氧树脂煤焦油漆,厚度为湿态7.4密耳,干态为5密耳。 apply …to …涂…于…上 醇酸标记漆CLB295 明红色 =according to 按照
18
Two (2) links on each side of the second shot connecting link shall be painted white and two (2) turns of #8 stainless steel wire shall be securely fastened around the stud of the second link on either side of the connecting link. Three (3) links on each side of the third shot connecting link shall be painted white and three (3) turns of #8 stainless steel wire shall be securely fastened around the stud of the third link on either side of the connecting link, and so forth. All the links in the last 15-fathom shot inboard shall be coated with Interlac CLB295 signal red, and all the links in the next adjoining shot shall be coated with Interlac CLB134 signal yellow. 锚链标记方法(参考译文):在第一与第二之间的连接连环前后第一个有档链环的撑档上绕金属丝,并在两环之间的 有档链环上涂白漆,以此表示第一节。- 在第二与第三节之间的连接链环前后第二个有档链环撑档上绕金属丝,并在该两环之间的所有档链上涂白漆,以此表示第二节。以此类推。 最后一至两节可涂红或黄漆,等醒目标记以作为预示锚链将至末端的危险-警告,以警惕丢锚-
19
Port and starboard chain locker drain system reconditioning
Remove, unship and discard the eductor. Flush the 4-in. chain locker sump drain piping to the sump beneath each chain locker with water to remove mud and other debris and to demonstrate that the piping is unobstructed. There is approximately ten (10) feet of piping between the common eductor and each sump. Following inspection and any necessary repairs, receive a new, owner-furnished, similar-design eductor and install as original, using new flange gaskets and new, 316 grade stainless steel fasteners in all locations. Tighten all fasteners to appropriate torque values for the applicable fastener sizes. unship: vt. remove/unload 解下/卸下 本句翻译:用水冲刷锚链舱排泄管以清除位于锚链舱下的集油槽内的泥土和其他垃圾等,并表明管系畅通。flush …to…with用…把…冲到… 本句翻译:将所有紧固件拧紧到与其相应尺寸适合的扭力值。
20
Multiple choices 1. ______ about 20 sq.m to be sand-blasted. The rusting area The rusted area The corroded area The corrosive area 2. Which of the following items is not in the charge of Chief Officer in repairing operation? hull cleaning derusting and painting the maintenance of boiler docking and undocking
21
3. All removals to be reassembled in order ______ of repairs.
upon commencement on completion before ending after beginning 4. I hereby request permission to ______ the ship hull for routine maintenance. operate repair oil paint 5. If the ship sustains such damage that repairs are necessary,the master must put into the nearest port ______ such repairs can be effected. which at which there at there
22
6. I'll have the damaged parts repaired in Hongkong and send you in due course the amount of expenses ______. incurred happened spent paying out 7. No repairs can be done without the Harbor Master's ______. approval authorization consideration discussion
23
sail twine and vulcanizing kit
Puncture leaks in the lower tubes or bottom of an inflatable liferaft should FIRST be stopped by using ______. sealing clamps repair tape a tube patch sail twine and vulcanizing kit 9. Repairing damage to the hull at or above the waterline reduces the threat of ______. free surface effects capsizing continued progressive flooding wind heel 夹具 Twine: 双股线,麻线,帆线 Vulcanize: 1.硫化,硬化 2.热补(胎)
24
10. Rivets are usually made of ______. wrought-iron aluminum
wrought [rɔ:t] 基本释义 词组短语 同近义词 adj. 锻造的;加工的;精细的 v. 工作(work的过去分词) 10. Rivets are usually made of ______. wrought-iron aluminum high-tensile steel mild steel 11. Small hull leaks can be temporarily repaired by ______. parcelling parbuckling caulking seizing mild steel 低碳钢;[材] 软钢 向绳上缠油帆布捆成小捆 套拉绳,起重索套,突拉力 caulking ['kɔ:kiŋ] 基本翻译 n. [建] 堵缝;压紧 网络释义 caulking:堵缝 | 嵌缝 | 敛缝 缠扎绳
25
12. The deck control valve to be ______ after being repaired.
moved and fitted again removed and refitted reproduced and put on again returned and attached again 13. The order of importance in addressing damage control is ______. A. control flooding,control fire,repair structural damage B. restore vital services,control fire,control flooding C. control fire,restore vital services,control flooding D. control fire,control flooding,repair structural damage
26
14. The two factors which make underwater hull repair difficult are accessibility and the ______.
availability of tools shape of the hull pressure exerted by the water threat of progressive flooding 15. We enclose herewith an application {in triplicate} for repairs. in one copy in two copies in three copies in four copies
27
16. We have come on board to check with you on the main items of repairs as stated in the ______.
order list repair list store list spare parts list 17. Laying out a line in successive circles flat on deck with the bitter end in the center is known as ______. coiling faking flemishing lining coiling ['kɔiliŋ] 基本翻译 n. 卷绕,成卷;螺旋 网络释义 coiling:成卷 | 上卷筒 | 绕成螺旋 卷索,盘索 平盘绳
28
18. Lines or gear NOT in use should be ______.
conspicuously marked stowed anywhere left on deck secured or stowed out of the way 19. Our starboard derrick boom of hatch No.4 is badly cracked ______ that it has become entirely useless. at its goose neck to such a extent at it's goose neck to such an extent at it's goose neck for such a extent at its goose neck to such an extent
29
20. The heel block is located ______.
at the base of the boom at the cargo hook near the midships guy near the spider band
30
永久性修理 水线带 舭龙骨 计程仪 防污漆 通海吸水箱(海底门) 球鼻首标记 载重线/干舷标志 油脂, 涂油,润滑 重新装配
II Translate the following into English 永久性修理 水线带 舭龙骨 计程仪 防污漆 通海吸水箱(海底门) 球鼻首标记 载重线/干舷标志 油脂, 涂油,润滑 重新装配 Permanent repair boot-top Bilge keel speed log anti-fouling paint Sea chest bulbous bow mark Load line/plimsoll line marking grease reassemble
31
一式三份 吊艇柱 旋转附件 制动衬面,刹车片 调节跨幅复式滑车 导向滚轮 滚球轴承 防滑漆 露天甲板 升降口 In triplicate
davit Turing accessory brake lining span tackle Guide roller ball bearing Non-slip paint Weather deck companion way
32
Exercises from the test bank
______ are two vertical supports,usually steel,one each side of the centerline of the ship used to support booms. A.Shrouds B.King posts C.Stays D.Turnbuckles ______ are used for anchor gear in marine work where the chains must withstand the corrosive effects of seawater. A.Chains B.Wires C.Ropes D.Lines ______ provide athwartship support for the mast or king posts.
33
A 6x12,two-inch wire rope has ______.
A.12 strands and a two-inch diameter B.12 strands and a two-inch circumference C.6 strands and a two-inch diameter D.6 strands and a two-inch circumference A 6x19 wire rope would be ______. A.6 inches in diameter and 19 fathoms long B.6 inches in circumference with 19 strands C.6 strands with 19 wires in each strand D.19 strands with 6 wires in each strand
34
The next-to-last shot of an anchor cable is usually painted ___________
white international orange C. yellow D. red
35
3. Do the remaining exercises of this chapter.
4. Summary of this lesson In today’s class we studied paint work, anchor and chain reconditioning. We finish the exercises of this chapter, too. 5. Homework 5.1 Please go over the new words and all the passages of this chapter and get ready for the quiz next class. 5.2 Preview next chapter
Similar presentations
© 2025 SlidePlayer.com Inc.
All rights reserved.