Presentation is loading. Please wait.

Presentation is loading. Please wait.

NLOG: New and Planning TNO BenO Geological Survey of the Netherlands NLOG: New and Planning User Council 20081008.

Similar presentations


Presentation on theme: "NLOG: New and Planning TNO BenO Geological Survey of the Netherlands NLOG: New and Planning User Council 20081008."— Presentation transcript:

1 NLOG: New and Planning TNO BenO Geological Survey of the Netherlands NLOG: New and Planning User Council 20081008

2 TNO BenO, 08 October 2008NLOG: New and Planning2 What happened First a short explanation why we did it this way Why? Making NLOG manageable Improve maintainability of NLOG Status: finished Therefore GIP issue priorities have been shifted

3 TNO BenO, 08 October 2008NLOG: New and Planning3 What happened Precondition for NLOG improvements: Unraveling NLOG with the other portals as DINOLoket Upgrading applicationserver JBOSS 4.02  4.2 Status: finished

4 TNO BenO, 08 October 2008NLOG: New and Planning4 Planning rest of 2008 Functional improvement of NLOG Implementing a large number of little functional improvements and corrections of bugs and inconsistencies in the dynamic content Additional information on Geothermal energy, CO2 and gas storage, salt production in concept  powerpoint Gijs Remmelts

5 TNO BenO, 08 October 2008NLOG: New and Planning5 Planning rest of 2008 Extraction of data and metadata from DINO Database 1.DINO-BRH Public metadata and data of boreholes “Monitoring period“ as a selection criterium doesn’t work properly. Extend choices on selection screen like the option ‘Result of the drilling’ with ‘gas’, ‘oil’, ‘oil and gas’ and ‘dry’ A lot of the metadata is not filled in. The meaning of the data is not clear in some cases. In the metadata screen depth and other information is not shown for public boreholes. The extraction of lithostratigrafy, deviationdata, coremeasurements of public boreholes. Extraction of composite well logs as a seperate document.

6 TNO BenO, 08 October 2008NLOG: New and Planning6 Planning rest of 2008 Extraction of data and metadata from DINO Database 2.DINO-SMC Extracting of public data and metadata of seismic surveys Extraction of all metadata of 2D seismic surveys. Seismic 2D: show snapshot from DINO-SMC. Seismic 3D: show snapshot from DINO-SMC. Downloading tiffs of 2D seismic and digital 2D surveys.

7 TNO BenO, 08 October 2008NLOG: New and Planning7 Planning rest of 2008 Extraction of data and metadata from DINO Database 3.DINO-RES Extraction of production figures Extend choices on selection screen option ‘Area’ with ‘Territory’ and ‘Continental Shelf’ Extend selection screen for reproduction in (million, x 1000) Normal cubic meter (Nm3) and (million, x 1000) Standard cubic meter (Sm3).

8 TNO BenO, 08 October 2008NLOG: New and Planning8 Planning rest of 2008 Extraction of data and metadata from DINO Database 4.DINO-LOGS Extraction of public (D)LIS and LAS files Extraction of public files containing boreholedata Mining Act, after module DINO-LOGS II is delivered.

9 TNO BenO, 08 October 2008NLOG: New and Planning9 Planning rest of 2008 Extraction of data and metadata from DINO Database 5.DINO-QUA Extraction of public organic geochemical data Extraction of public Vitrinite Reflection data and public Rock-Eval analysis Extraction of gas composition data with calculated parameters included

10 TNO BenO, 08 October 2008NLOG: New and Planning10 Planning 2009 Functional improvement of NLOG Adjusting and adding of searchcriteria in the select screens Overall improvement of userfriendliness of NLOG. Realisation of userfriendly presentation of the results. Development of a generic tool which exports the queryresults to excelformat Adding of online help and update of NLOG manuals

11 TNO BenO, 08 October 2008NLOG: New and Planning11 Planning 2009 Extraction of data and metadata from DINO Database 1.Extraction of field information and documents linked to fields Extend choices on the selection screen.

12 TNO BenO, 08 October 2008NLOG: New and Planning12 Planning 2009 Extraction of data and metadata from DINO Database 2.DINO-LIC: Extraction of (public) licences All licence information will be extracted from the new database DINO-LIC Completing operators dropdownlist, use of full name Change ‘Choose an operator’ into ‘Licence holder’. Adding dropdown list for option ‘Licence name’. Extend choices on selection screen like on/offshore and ‘Expiry Date’.

13 TNO BenO, 08 October 2008NLOG: New and Planning13 Planning 2009 Extraction of data and metadata from DINO Database 3.DINO-MAP: Extraction of public maps Will be offered as a seperate item in the NLOG navigation bar and will be extracted from the database

14 TNO BenO, 08 October 2008NLOG: New and Planning14 Assignments Usercouncil 20080313-01 Manders’ request for the systematic monitoring of DINO data use, data users and user requests, in a register with easy access for the members of this council, is noted as point for information and discussion in the next council meeting Status: See proposal information for DINO-DO User Council

15 TNO BenO, 08 October 2008NLOG: New and Planning15 Assignments Usercouncil 20080313-02 Mrs Hagendijk’s complaint that NLOG contains lots of errors, is not a user friendly website and has icons that are far from self evident, is noted by Remmelts in his role of content manager of the DINO Deep Subsurface data modules. Remmelts will contact Mrs. Hagendijk for more detailed information. Status: errors: planning rest of 2008, ready december 2008 user-friendliness:planning 2009 self evidence: planning 2009 easy search options: planning 2009

16 TNO BenO, 08 October 2008NLOG: New and Planning16 Assignments Usercouncil 20080313-03 The DINO department will consider all complaints heard during this meeting (13-03-2008), on lack of accessibility of data, lack of user friendliness and of self evidence of NLOG and will study it’s options to remedy the situation Status: accessibility of data DINO-BRH, -SMC, -RES, -QUA, -LOGS : planning rest of 2008. Ready december 2008 DINO-AST, -LIC, parts of DINO-RES: planning 2009 user-friendliness:planning 2009 self evidence: planning 2009

17 TNO BenO, 08 October 2008NLOG: New and Planning17 Assignments Usercouncil 20080313-04 A specific complaint by Corcoran on the availability of 2D and 3D seismic data in NLOG is noted: these data are very difficult to mine; it is very difficult to make selections. This problem is known to the department: “we are working on a solution” Status: DINO-SMC: planning rest of 2008. Ready december 2008

18 TNO BenO, 08 October 2008NLOG: New and Planning18 Assignments Usercouncil 20080313-05 To facilitate the reporting of user complaints a button will be added to the NLOG menu (co-ordination: Van Leeuwen / Monen); Remmelts has added his request that any complaint also be sent to him by email via the mailbox in NLOG, he has assured the council members that all complaints so received will be answered. Status: Implemented

19 TNO BenO, 08 October 2008NLOG: New and Planning19 Procedure Complaints If you have a complaint against NLOG, then you can process this on nlog-portal@tno.nl. Whether this concerns the response times, the information, the data or the service level, NLOG is keen to take your complaint on board and deal with it according to a set procedure. This means that you will receive and email from us within two days informing you of when your complaint is expected to be resolved. NLOG tries to deal with complaints within four weeksnlog-portal@tno.nl The only reason why a complaint may not be deal within this way is that your complaint is considered by NLOG as a wish, in which case a normally much longer procedure is involved. We will inform you within a day if this is the case.

20 TNO BenO, 08 October 2008NLOG: New and Planning20 Procedure Wishes NLOG enables you to express your wishes via nlog- portal@tno.nl. NLOG will check whether your wish falls within the public task of NLOG. You will be informed as soon as possible of the outcome. Your wish is likely to take a few weeks to a few months to be realised. If your wish cannot be accommodated within DINO’s current program, then the DINO-DO User Council will have to consider it and thus the realisation may take a significantly longer time, up to eight months.nlog- portal@tno.nl In the worst case scenario you may have informed us of your wish just after the User Council has met. We will inform you of the outcome following a meeting of the User Council and then we will deal with the wish as recognised by the User Council.

21 TNO BenO, 08 October 2008NLOG: New and Planning21 Assignments Usercouncil 20080313-06 Aalpol’s request to improve the well header data (all well data should be headed by a correct and complete name and description of the well, i.e. complete well header data) is noted for follow-up by Kuipers. Status: part of DINO-BRH: planning rest of 2008. Ready december 2008

22 TNO BenO, 08 October 2008NLOG: New and Planning22 Assignments Usercouncil 20080313-07 Remmelts will discuss with the DINO software developers the possibility to place, for extra visibility, all new released wells and other recent changes in NLOG, behind a new button on NLOG. Status: review visibility of new released wells:planning 2009 review visibility of recent changes:planning 2009

23 TNO BenO, 08 October 2008NLOG: New and Planning23 Assignments Usercouncil 20080313-09 Van Leeuwen expects that the header data of the seismic surveys will be available with the next release of NLOG. The (D)LIS and LAS-files will be available not before September (co-ordination: Van Leeuwen / Monen). Status: DINO-SMC: planning rest of 2008. Ready december 2008 DINO-LOGS: planning rest of 2008. Ready december 2008

24 TNO BenO, 08 October 2008NLOG: New and Planning24 Assignments Usercouncil 20080313-10 Van Leeuwen promises that an overview of all digital data now available in NLOG will be provided before the next council meeting. Status: received as handout: completed

25 TNO BenO, 08 October 2008NLOG: New and Planning25 Assignments Usercouncil 20080313-11 An invitation to visit NAM for a presentation to NAM’s data-managers on all data and information that DINO can offer it’s professional users, is noted by Van Leeuwen for some future occasion. Status: To be planned

26 TNO BenO, 08 October 2008NLOG: New and Planning26 Assignments Usercouncil 20080313-12 Jaspers’ wish (seconded by Kluin) for a consistent identification system for the image files under NLOG (when an image file is downloaded it should include the relevant metadata so that one can see what one has downloaded) is noted for follow-up by Kuipers. Status: DINO-SMC: planning rest of 2008. Ready december 2008

27 TNO BenO, 08 October 2008NLOG: New and Planning27 Proposal Information for the DINO-DO User Council 1.Complaints number of complaints number of complaints resolved within the promised time not dealt within the promised time  listing of these complaints categorized 2.Wishes wishes that can be accommodated within DINO’s current program And wishes that can be prioritized by the User Council, DINO and eventually GIC

28 TNO BenO, 08 October 2008NLOG: New and Planning28 Proposal Information for the DINO-DO User Council 3.Monthly use of NLOG number of requests per datatype visitors overview (anonymous) traffic sources content overview We shall provide monthly reports (kind of management reports) to the DINO-DO User Council

29 TNO BenO, 08 October 2008NLOG: New and Planning29 Proposal Example of a visitor overview 1

30 TNO BenO, 08 October 2008NLOG: New and Planning30 Proposal Example of a visitor overview 2

31 TNO BenO, 08 October 2008NLOG: New and Planning31 Proposal Example of a Traffic Sources Overview

32 TNO BenO, 08 October 2008NLOG: New and Planning32 Proposal Example of a Content Overview


Download ppt "NLOG: New and Planning TNO BenO Geological Survey of the Netherlands NLOG: New and Planning User Council 20081008."

Similar presentations


Ads by Google