Presentation is loading. Please wait.

Presentation is loading. Please wait.

› Energy WP 2012: priorities and topics Piotr Świątek, NCP Energy.

Similar presentations


Presentation on theme: "› Energy WP 2012: priorities and topics Piotr Świątek, NCP Energy."— Presentation transcript:

1 › Energy WP 2012: priorities and topics Piotr Świątek, NCP Energy

2 Solar Energy Photovoltaics CSP Wind Energy Wind energy Bio Energy Bioenergy Other renewable energies Ocean Hydro Geothermal Fuel cells and hydrogen Energy networks Smart grid Clean coal/CCS Coal and steel (RFCS) Energy efficiency Efficiency and savings FP7 ENERGY RESEARCH Horizontal aspects Socio-economic research Future emerging technologies & materials

3

4 Examples of EU – Funding schemes - Focus Energy ENERGIE / FP7 - RTD ENERGIE / FP7 - Demo IEE / CIP FCH - JTI Research ….. Application ….. Pilot.…. Prototype ….. Series ….. ESF LIFE EERP ERC RFCS NMP… / FP7

5 Operational Programmes LIFE work programme Implementation: projects, networks, award of grants and subsidies, etc. work programme – work programme – work programme Capacities: 4,1 Bn Regions of Knowledge (126 M) Dev Research policy (CREST, ERA-Watch, OMC- Nets) (70 M) SME research (1,3 Bn) Research potential of cohesion regions (340M) Science & Society. (280 M) Infrastructure (1,7 Bn) incl Risk sharing finance facility (RSFF) Cooperation: 32,4 Bn Themes: Energy (2,3 Bn); Environment (1,9 Bn); Space (1,4 Bn); Social & Econ.Sciences (0,6 Bn) ICT (9 Bn); etc Formats: JTI (incl Risk sharing finance facility RSFF) Art 169: cooperation of nat. Programmes ERA-Nets (plus) etc Enterprise & Innovation (EIP) 2,1 Bn Financial instruments (1,1 Bn) Service networks: SME consultancy, Technology- transfer, FP7 participation, IPR use and awareness Networking of actors: policy development and learning Analysis and studies e-business Eco-innovation (430 M): market replication; Financial instruments, Networking Etc. ICT 728 M ( market up-take ICT; e-learning; ICT application ) Intelligent Energy Europe (IEE) 727 M (Energy efficiency; market up-take; awareness raising) ERDF, ESF, Cohesion Fund Objectives: Convergence (251 Bn) Competitiveness & employment (49,1 Bn; ERDF, ESF) Territorial cooperation (successor to INTERREG) (7,75 Bn) Priorities: Research, Innovation, Environment New Instruments: JEREMIE (SME financial instrument) JESSICA urban dev. JASPERS technical assistance + EAFRD & EFF Comenius (preschool, comp. and Upper Sec) Leonardo da Vinci (vocational edu. & training) Erasmus (university level scholarships ) ErasmusMundus (third country) Grundtvig (adult education) E Twinning : ICT in schools Transversal Act. Environment: policy monitoring & policy development; NGO projects 5 Committees 10 Com- mittees Committee Com- mittee Com- mittee Ideas: Fundamental research (ERC) 7,5 Bn People: Marie-Curie- Scholarships (4,7 Bn) JRC (Joint Research Centres) 1,75 Bn 3 Committees Managing Authorities (Member States & Regions LIFE+ EIT LIFE+ 2,1 Bn Structural Funds 347 Bn CIP Competitveness & Innovation 3,6 Bn FP7 Research and Development 54 Bn LLP Education & Training 6,2 Bn Agencies Member States / COM FP7 Agency (People, SME) ERC (Ideas) COM (INFSO) COM (ENTR, ENV) COM (RTD, ENERGY, MOVE, INFSO) EIB/EIF : CIP financial instruments, FP7: RSFF CIP Agency EACI Regions / MS / Agencies Bodies for territorial cooperation EIF : JEREMIE EII

6 Energy in Cooperation Program

7 Nationale Kontaktstelle Energie: eu-energie@fz-juelich.de Calls ENERGY-2012 Call identifierTitlePublishedDeadlineBudgetSubmission FP7-ENERGY-2012-1ENERGY CALL PART 119.07.201125.10.2011150Two stage FP7-ENERGY-2012-2ENERGY CALL PART 219.07.201108.03.201281One stage FP7-ENERGY- SMARTCITIES-2012 Smart Cities And Communities19.07.201101.12.201140One stage FP7-ERANET-2012- RTD ERA-NET PLUS - BIOENERGY DEMONSTRATIONS OF THE EUROPEAN INDUSTRIAL BIOENERGY INITIATIVE 10 FP7-2012-NMP-ENV- ENERGY-ICT-EeB DEMONSTRATION OF ZERO CARBON BUILDING RENOVATION FOR CITIES AND DISTRICTS 35

8 Nationale Kontaktstelle Energie: eu-energie@fz-juelich.de Calls ENERGY-2012 Call identifierTitleReleasedDeadlineBudgetEvaluation FP7-ENERGY-2012-1ENERGY CALL PART 119.07.201125.10.2011150Two-step FP7-ENERGY-2012-2ENERGY CALL PART 2XX.07.201108.03.201281Single step FP7-ENERGY- SMARTCITIES-2012 Smart Cities And CommunitiesXX.07.201101.12.201140Singel step FP7-ERANET-2012- RTD ERA-NET PLUS - BIOENERGY DEMONSTRATIONS OF THE EUROPEAN INDUSTRIAL BIOENERGY INITIATIVE 10 FP7-2012-NMP-ENV- ENERGY-ICT-EeB DEMONSTRATION OF ZERO CARBON BUILDING RENOVATION FOR CITIES AND DISTRICTS 35 AreaTopicType FP7- ENERGY- ACTIVITY ENERGY.2: RENEWABLE ELECTRICITY GENERATION 2.1: PHOTOVOLTAICS ENERGY 2012.1.1: Reliable, cost-effective, highly performing PV systemsCP2012-1 Energy.2012.2.1-2: Demonstration of multifunctional PV modules CP demonstration 2012-2 2.3: WIND ENERGY.2012.2.3.1: Innovative wind conversion systems (10-20MW) for offshore applications CP2012-1 Energy.2012.2.3-2: Demonstration of innovative designs to reduce fatigue loads and improve reliability of multi-MW turbines CP demonstration 2012-2 2.5: CONCENTRATED SOLAR POWER ENERGY.2012.2.5.1: Research, development and testing of solar dish systemsCP2012-1 ENERGY.2012.2.5.2: Hybridisation of CSP with other energy sourcesCP2012-1 2.6: OCEANEnergy.2012.2.6-1: Demonstration and deployment of first ocean energy farms CP demonstration 2012-2.2.9: CROSS-CUTTING ISSUESENERGY.2012.2.9.1: Power generation in the low temperature rangeCP2012-1 AreaTopicType FP7- ENERGY- ACTIVITY ENERGY 3: RENEWABLE FUEL PRODUCTION 3.2: SECOND GENERATION FUEL FROM BIOMASS ENERGY.2012.3.2.1: Biofuels from microalgae or macroalgaeCP2012-1 ENERGY.2012.3.2.2: Development and testing of advanced sustainable bio- based fuels for air transport CP2012-1 Energy.2012.3.2.3: Pre-commercial industrial scale demonstration plant on lignocellulosic ethanol CP demonstration 2012-2 3.7: CROSS-CUTTING ISSUES ENERGY.2012.3.7.1: Development of new or improved logistics for lignocellulosic biomass harvesting, storage and transport CP small & medium size 2012-1

9 Nationale Kontaktstelle Energie: eu-energie@fz-juelich.de Calls ENERGY-2012 Call identifierTitleReleasedDeadlineBudgetEvaluation FP7-ENERGY-2012-1ENERGY CALL PART 119.07.201125.10.2011150Two-step FP7-ENERGY-2012-2ENERGY CALL PART 2XX.07.201108.03.201281Single step FP7-ENERGY- SMARTCITIES-2012 Smart Cities And CommunitiesXX.07.201101.12.201140Singel step FP7-ERANET-2012- RTD ERA-NET PLUS - BIOENERGY DEMONSTRATIONS OF THE EUROPEAN INDUSTRIAL BIOENERGY INITIATIVE 10 FP7-2012-NMP-ENV- ENERGY-ICT-EeB DEMONSTRATION OF ZERO CARBON BUILDING RENOVATION FOR CITIES AND DISTRICTS 35 AreaTopicType FP7- ENERGY- ACTIVITY ENERGY.2: RENEWABLE ELECTRICITY GENERATION 2.1: PHOTOVOLTAICS ENERGY 2012.1.1: Reliable, cost-effective, highly performing PV systemsCP2012-1 Energy.2012.2.1-2: Demonstration of multifunctional PV modules CP demonstration 2012-2 2.3: WIND ENERGY.2012.2.3.1: Innovative wind conversion systems (10-20MW) for offshore applications CP2012-1 Energy.2012.2.3-2: Demonstration of innovative designs to reduce fatigue loads and improve reliability of multi-MW turbines CP demonstration 2012-2 2.5: CONCENTRATED SOLAR POWER ENERGY.2012.2.5.1: Research, development and testing of solar dish systemsCP2012-1 ENERGY.2012.2.5.2: Hybridisation of CSP with other energy sourcesCP2012-1 2.6: OCEANEnergy.2012.2.6-1: Demonstration and deployment of first ocean energy farms CP demonstration 2012-2.2.9: CROSS-CUTTING ISSUESENERGY.2012.2.9.1: Power generation in the low temperature rangeCP2012-1 AreaTopicType FP7- ENERGY- ACTIVITY ENERGY.3: RENEWABLE FUEL PRODUCTION 3.2: SECOND GENERATION FUEL FROM BIOMASS ENERGY.2012.3.2.1: Biofuels from microalgae or macroalgaeCP2012-1 ENERGY.2012.3.2.2: Development and testing of advanced sustainable bio- based fuels for air transport CP2012-1 Energy.2012.3.2.3: Pre-commercial industrial scale demonstration plant on lignocellulosic ethanol CP demonstration 2012-2 3.7: CROSS-CUTTING ISSUES ENERGY.2012.3.7.1: Development of new or improved logistics for lignocellulosic biomass harvesting, storage and transport CP small & medium size 2012-1 AreaTopicType FP7- ENERGY- ACTIVITY ENERGY 4: RENEWABLES FOR HEATING AND COOLING 4.1: LOW/MEDIUM TEMPERATURE SOLAR THERMAL ENERGY ENERGY.2012.4.1.1: Research and development for medium temperature range solar collectors (100°-250°C) CP2012-1 ACTIVITY ENERGY.5: CO2 CAPTURE AND STORAGE TECHNOLOGIES FOR ZERO EMISSION POWER GENERATION 5.2: CO2 STORAGE ENERGY.2012.5.2.1: Sizeable pilot tests for CO2 geological storage CP Funding from third parties 2012-1 ENERGY.2012.5.2.2: Impact of the quality of CO2 on transport and storage behaviour CP2012-1 ACTIVITY ENERGY 5&6: CROSS-CUTTING ACTIONS BETWEEN ACTIVITIES ENERGY.5 AND ENERGY.6 5&6.2: CROSS CUTTING AND REGULATORY ISSUES Energy.2012.5&6.1-1 Pilot plant-scale demonstration of advanced post- combustion CO2 capture processes with a view to integration in fossil fuel power plants CP demonstration 2012-2 Energy.2012.5&6.1-2: Pilot plant-scale demonstration and integration of emerging and new combustion technologies CP demonstration 2012-2 ENERGY.2012.5&6.2.1: Support to the coordination of stakeholders' activities in the field of Zero Emission Energy Production CSA-SA2012-1

10 Nationale Kontaktstelle Energie: eu-energie@fz-juelich.de Calls ENERGY-2012 Call identifierTitleReleasedDeadlineBudgetEvaluation FP7-ENERGY-2012-1ENERGY CALL PART 119.07.201125.10.2011150Two-step FP7-ENERGY-2012-2ENERGY CALL PART 2XX.07.201108.03.201281Single step FP7-ENERGY- SMARTCITIES-2012 Smart Cities And CommunitiesXX.07.201101.12.201140Singel step FP7-ERANET-2012- RTD ERA-NET PLUS - BIOENERGY DEMONSTRATIONS OF THE EUROPEAN INDUSTRIAL BIOENERGY INITIATIVE 10 FP7-2012-NMP-ENV- ENERGY-ICT-EeB DEMONSTRATION OF ZERO CARBON BUILDING RENOVATION FOR CITIES AND DISTRICTS 35 AreaTopicType FP7- ENERGY- ACTIVITY ENERGY.2: RENEWABLE ELECTRICITY GENERATION 2.1: PHOTOVOLTAICS ENERGY 2012.1.1: Reliable, cost-effective, highly performing PV systemsCP2012-1 Energy.2012.2.1-2: Demonstration of multifunctional PV modules CP demonstration 2012-2 2.3: WIND ENERGY.2012.2.3.1: Innovative wind conversion systems (10-20MW) for offshore applications CP2012-1 Energy.2012.2.3-2: Demonstration of innovative designs to reduce fatigue loads and improve reliability of multi-MW turbines CP demonstration 2012-2 2.5: CONCENTRATED SOLAR POWER ENERGY.2012.2.5.1: Research, development and testing of solar dish systemsCP2012-1 ENERGY.2012.2.5.2: Hybridisation of CSP with other energy sourcesCP2012-1 2.6: OCEANEnergy.2012.2.6-1: Demonstration and deployment of first ocean energy farms CP demonstration 2012-2.2.9: CROSS-CUTTING ISSUESENERGY.2012.2.9.1: Power generation in the low temperature rangeCP2012-1 AreaTopicType FP7- ENERGY- ACTIVITY ENERGY.3: RENEWABLE FUEL PRODUCTION 3.2: SECOND GENERATION FUEL FROM BIOMASS ENERGY.2012.3.2.1: Biofuels from microalgae or macroalgaeCP2012-1 ENERGY.2012.3.2.2: Development and testing of advanced sustainable bio- based fuels for air transport CP2012-1 Energy.2012.3.2.3: Pre-commercial industrial scale demonstration plant on lignocellulosic ethanol CP demonstration 2012-2 3.7: CROSS-CUTTING ISSUES ENERGY.2012.3.7.1: Development of new or improved logistics for lignocellulosic biomass harvesting, storage and transport CP small & medium size 2012-1 AreaTopicType FP7- ENERGY- ACTIVITY ENERGY.4: RENEWABLES FOR HEATING AND COOLING 4.1: LOW/MEDIUM TEMPERATURE SOLAR THERMAL ENERGY ENERGY.2012.4.1.1: Research and development for medium temperature range solar collectors (100°-250°C) CP2012-1 ACTIVITY ENERGY.5: CO2 CAPTURE AND STORAGE TECHNOLOGIES FOR ZERO EMISSION POWER GENERATION 5.2: CO2 STORAGE ENERGY.2012.5.2.1: Sizeable pilot tests for CO2 geological storage CP Funding from third parties 2012-1 ENERGY.2012.5.2.2: Impact of the quality of CO2 on transport and storage behaviour CP2012-1 ACTIVITY ENERGY.5&6: CROSS-CUTTING ACTIONS BETWEEN ACTIVITIES ENERGY.5 AND ENERGY.6 5&6.2: CROSS CUTTING AND REGULATORY ISSUES Energy.2012.5&6.1-1 Pilot plant-scale demonstration of advanced post- combustion CO2 capture processes with a view to integration in fossil fuel power plants CP demonstration 2012-2 Energy.2012.5&6.1-2: Pilot plant-scale demonstration and integration of emerging and new combustion technologies CP demonstration 2012-2 ENERGY.2012.5&6.2.1: Support to the coordination of stakeholders' activities in the field of Zero Emission Energy Production CSA-SA2012-1 AreaTopicType FP7- ENERGY- ACTIVITY ENERGY 7: SMART ENERGY NETWORKS 7.1: DEVELOPMENT OF INTER-ACTIVE DISTRIBUTION ENERGY NETWORKS ENERGY.2012.7.1.1: Integration of variable distributed resources in distribution networks CP2012-1 ENERGY.2012.7.1.2: Enhancing electricity networks through use of distributed intelligence CP2012-1 ENERGY.2012.7.1.3: Empowering smart customers to participate in active demand and energy system efficiency CP2012-1 7.2: PAN-EUROPEAN ENERGY NETWORKS ENERGY.2012.7.2.1: Planning for European Electricity Highways to ensure the reliable delivery of renewable electricity and market integration CP2012-x 7.3: CROSS CUTTING ISSUES AND TECHNOLOGIES ENERGY.2012.7.3.1: Networking of national R&D and demonstration projects on smart metering infrastructure and data processing CSA-CA2012-1 ENERGY.2012.7.3.2: Facilitating the deployment of safe stationary batteriesCP2012-1 ENERGY.2012.7.3.3: Support to the coordination of stakeholders activities in the field of Smart Grids CSA-SA2012-1

11 Nationale Kontaktstelle Energie: eu-energie@fz-juelich.de Calls ENERGY-2012 Call identifierTitleReleasedDeadlineBudgetEvaluation FP7-ENERGY-2012-1ENERGY CALL PART 119.07.201125.10.2011150Two-step FP7-ENERGY-2012-2ENERGY CALL PART 2XX.07.201108.03.201281Single step FP7-ENERGY- SMARTCITIES-2012 Smart Cities And CommunitiesXX.07.201101.12.201140Singel step FP7-ERANET-2012- RTD ERA-NET PLUS - BIOENERGY DEMONSTRATIONS OF THE EUROPEAN INDUSTRIAL BIOENERGY INITIATIVE 10 FP7-2012-NMP-ENV- ENERGY-ICT-EeB DEMONSTRATION OF ZERO CARBON BUILDING RENOVATION FOR CITIES AND DISTRICTS 35 AreaTopicType FP7- ENERGY- ACTIVITY ENERGY.2: RENEWABLE ELECTRICITY GENERATION 2.1: PHOTOVOLTAICS ENERGY 2012.1.1: Reliable, cost-effective, highly performing PV systemsCP2012-1 Energy.2012.2.1-2: Demonstration of multifunctional PV modules CP demonstration 2012-2 2.3: WIND ENERGY.2012.2.3.1: Innovative wind conversion systems (10-20MW) for offshore applications CP2012-1 Energy.2012.2.3-2: Demonstration of innovative designs to reduce fatigue loads and improve reliability of multi-MW turbines CP demonstration 2012-2 2.5: CONCENTRATED SOLAR POWER ENERGY.2012.2.5.1: Research, development and testing of solar dish systemsCP2012-1 ENERGY.2012.2.5.2: Hybridisation of CSP with other energy sourcesCP2012-1 2.6: OCEANEnergy.2012.2.6-1: Demonstration and deployment of first ocean energy farms CP demonstration 2012-2.2.9: CROSS-CUTTING ISSUESENERGY.2012.2.9.1: Power generation in the low temperature rangeCP2012-1 AreaTopicType FP7- ENERGY- ACTIVITY ENERGY.3: RENEWABLE FUEL PRODUCTION 3.2: SECOND GENERATION FUEL FROM BIOMASS ENERGY.2012.3.2.1: Biofuels from microalgae or macroalgaeCP2012-1 ENERGY.2012.3.2.2: Development and testing of advanced sustainable bio- based fuels for air transport CP2012-1 Energy.2012.3.2.3: Pre-commercial industrial scale demonstration plant on lignocellulosic ethanol CP demonstration 2012-2 3.7: CROSS-CUTTING ISSUES ENERGY.2012.3.7.1: Development of new or improved logistics for lignocellulosic biomass harvesting, storage and transport CP small & medium size 2012-1 AreaTopicType FP7- ENERGY- ACTIVITY ENERGY.4: RENEWABLES FOR HEATING AND COOLING 4.1: LOW/MEDIUM TEMPERATURE SOLAR THERMAL ENERGY ENERGY.2012.4.1.1: Research and development for medium temperature range solar collectors (100°-250°C) CP2012-1 ACTIVITY ENERGY.5: CO2 CAPTURE AND STORAGE TECHNOLOGIES FOR ZERO EMISSION POWER GENERATION 5.2: CO2 STORAGE ENERGY.2012.5.2.1: Sizeable pilot tests for CO2 geological storage CP Funding from third parties 2012-1 ENERGY.2012.5.2.2: Impact of the quality of CO2 on transport and storage behaviour CP2012-1 ACTIVITY ENERGY.5&6: CROSS-CUTTING ACTIONS BETWEEN ACTIVITIES ENERGY.5 AND ENERGY.6 5&6.2: CROSS CUTTING AND REGULATORY ISSUES Energy.2012.5&6.1-1 Pilot plant-scale demonstration of advanced post- combustion CO2 capture processes with a view to integration in fossil fuel power plants CP demonstration 2012-2 Energy.2012.5&6.1-2: Pilot plant-scale demonstration and integration of emerging and new combustion technologies CP demonstration 2012-2 ENERGY.2012.5&6.2.1: Support to the coordination of stakeholders' activities in the field of Zero Emission Energy Production CSA-SA2012-1 AreaTopicType FP7- ENERGY- ACTIVITY ENERGY.7: SMART ENERGY NETWORKS 7.1: DEVELOPMENT OF INTER-ACTIVE DISTRIBUTION ENERGY NETWORKS ENERGY.2012.7.1.1: Integration of variable distributed resources in distribution networks CP2012-1 ENERGY.2012.7.1.2: Enhancing electricity networks through use of distributed intelligence CP2012-1 ENERGY.2012.7.1.3: Empowering smart customers to participate in active demand and energy system efficiency CP2012-1 7.2: PAN-EUROPEAN ENERGY NETWORKS ENERGY.2012.7.2.1: Planning for European Electricity Highways to ensure the reliable delivery of renewable electricity and market integration CP2012-x 7.3: CROSS CUTTING ISSUES AND TECHNOLOGIES ENERGY.2012.7.3.1: Networking of national R&D and demonstration projects on smart metering infrastructure and data processing CSA-CA2012-1 ENERGY.2012.7.3.2: Facilitating the deployment of safe stationary batteriesCP2012-1 ENERGY.2012.7.3.3: Support to the coordination of stakeholders activities in the field of Smart Grids CSA-SA2012-1 AreaTopicType FP7- ENERGY- ACTIVITY ENERGY 8: ENERGY EFFICIENCY AND SAVINGS 8.1: EFFICIENT ENERGY USE IN THE MANUFACTURING INDUSTRY AND BUILDING SECTOR ENERGY.2012.8.1.1: Next generation heat pump technologiesCP2012-1 8.8: SMART CITIES AND COMMUNITIES Energy.2012.8.8-1: Strategic sustainable planning and screening of city plans – Smart Cities and Communities Incubator CSA-CA SMARTCIT IES-2012 Energy.2012.8.1-2: Large scale systems for urban area heating and/or cooling supply CP demonstration SMARTCIT IES-2012 Energy.2012.8.1.3: Demonstration of Zero Carbon Building Renovation for cities and districts CP demonstration FP7-2012- ENV-ICT- ENERGY- NMP-EeB ACTIVITY ENERGY.10: HORIZONTAL PROGRAMME ACTIONS 10.1: ERA-NET PLUS ON BIOENERGY Energy.2012.10.1.1 : ERA-NET Plus - Bioenergy Demonstrations of the European Industrial Bioenergy Initiative CSA coordinating research activities FP7- ERANET- 2012-RTD 10.2: FUTURE EMERGING TECHNOLOGIES ENERGY.2012.10.2.1: Future Emerging TechnologiesCP2012-1

12 › Factories of the Future — FoF FP7 - Budget: 645 M€ FP7-Theme: NMP, ICT › Energy Effcient Buildings — E2B FP7 - Budget: 505 M€ FP7-Theme: NMP, ICT, Energy, Environment › Green Cars — GC FP7 - Budget: 503 M€ FP7-Theme: SST, ICT, NMP, Environment, Energy › FCH JTI – Art188, administered by FCH JU PPPs in 7th Framework Programme

13 Partner search engines › Partner Search CORDIS › http://cordis.europa.eu/partners › Managenergy › http://www.managenergy.net/partner_search › Ideal-IST › http://www.ideal-ist.net/partner-search › ICT-PSP › http://ec.europa.eu/information_society/activities/ict_psp/cf/partner/login/ind ex.cfm › IGLO › http://www.iglortd.org/services/partner.html › SMEs › http://www.ncp-sme.net/partner-search › www.enterprise-europe-network.ec.europa.eu/services/technology-transfer

14

15 Strukturr and Budget of FCH JU Public share: 450 Mill. € Private share: in-kind Should match each other Governing Board: IG, RG, COM Kommission 5 Sitze; Forschungsgruppe 1 Sitz Nationale Kontaktstelle Energie: eu-energie@fz-juelich.de

16 16 Preliminary Structure of the MAIP

17 Budget and cost sharing of the Fuel Cells and Hydrogen JU › For 2008 – 2013: € 940 M (minimum) › EC budget : € 470 M (in cash) › Industry : € 450 M (minimum in kind), € 20 M (in cash) › Close follow-up to monitor and ensure the 50/50 cost sharing between the Community and industry

18 Financing Direct Costs Indirect costs: 20% of direct costs Nationale Kontaktstelle Energie: eu-energie@fz-juelich.de Type of Organisation Type of Activity CP= coordinated projects; CSA= coordination / support action RTDDemonstrationOther Industry (other than SME) CP: < 50% CSA:< 100% CP: < 50% CSA: < 100% CP: < 100% CSA: < 100% SME CP: < 75% CSA:< 100% Non-profit (public, research, …)

19 Der Projektträger Jülich. Partner für Forschungsmanagement CALL FCH JU 2011-1 › published 3. Mai 2011 › Deadline 18. August 2011 › Budget 109 Millionen EUR › 36 Topics › Info: www.fch-ju.euwww.fch-ju.eu

20 European Network of Energy-NCPs › 3 years EU-Project C-ENERGY+ › www.c-energyplus.eu › Contacts › Brokerage Events › Partner Search (no dedicated engine) › Russian partner Elena Chistyakova, chistaykova@psm.com.ru http://www.fp7-energy.ru

21 Piotr Świątek NCP Energy Project Management Jülich Research Centre Jülich D-52425 Jülich +49 2461 61 1848 office +49 170 211 96 12 mobile/cell p.swiatek@fz-juelich.de www.nks-energie.de


Download ppt "› Energy WP 2012: priorities and topics Piotr Świątek, NCP Energy."

Similar presentations


Ads by Google