Presentation is loading. Please wait.

Presentation is loading. Please wait.

CYBER DISPLAY 3 RD STEERING COMMITTEE MEETING 24.-25.11.2009 Almada, Portugal.

Similar presentations


Presentation on theme: "CYBER DISPLAY 3 RD STEERING COMMITTEE MEETING 24.-25.11.2009 Almada, Portugal."— Presentation transcript:

1 CYBER DISPLAY 3 RD STEERING COMMITTEE MEETING 24.-25.11.2009 Almada, Portugal

2 LOCAL COMMUNICATION ACTIVITIES WP3/3.1 and 3.2 HELSINKI HKR-RAK Ulla Soitinaho

3 Producing Communicative Energy Certificates – Display labels (3.1.1) Target: – 50-100 labels Reached: – 116 labels – consumption 2008 – completely new during CYBER-project – 120 “old Display buildings” received new label by e-mail

4 Target : – Campaign total 50- 100 – before 30.11. in 30 buildings – Action plan – Information material Reached: – Done in 8 schools – Agreed in 22 schools DMU’s questionnaire – Action plan 70 % ready For pupils For school personnel – Ppt-show template – Energy Audit reports Campaign in Display® buildings 3.1.2 (1/2)

5

6 Target : – Campaign total 50- 100 – before 30.11. in 30 buildings – Action plan – Information material Reached: – Done in 8 schools – Agreed in 22 schools DMU’s questionnaire – Action plan 70 % ready For pupils For school personnel – Ppt-show template – Energy Audit reports Campaign in Display® buildings 3.1.2 (1/2)

7 Energiankulutus ja Display Aurinkolahden peruskoulu “Aurinkokoulu”

8 Campaign in Display® buildings 3.1.2 (2/2) Target : – Information material – Press article 20 media companies Reached: – Purchased from Motiva 2200 pcs. and links to www-pages – You tube video “Proper Education” – Sent in the beginning of campaign 46 media companies 3 “scores”

9

10

11

12

13

14 Helsingin sanomat 3.11.2009

15

16 Seminar/workshops for key personnel in the municipality of Helsinki (3.1.3) 1/2 Target: – Total 3 seminars – 1 before 30.11.2009 – Action plan/programme – Slides – Training material Reached: – 0 – Contacts active from our side – Passive reception – Done/updating – Waiting… – Same as in building campaign

17 Seminar/workshops for key personnel in the municipality of Helsinki (3.1.3) 2/2 Target: – Conclusion  establishment of Helsinki network (1 meeting) Reached: – Waits for the results of the workshops

18 National Implementation Clubs (3.2) (1/3) Helsinki so far the only Display user Target: – 1-2 meetings Reached: – Several information occasions among others The Climate Change Campaign – Association of Municipalities in Finland November 2008 Finnish local and regional Energy Agencies and Motiva December 2008

19 National Implementation Clubs (3.2) (2/3) Helsinki so far the only Display user Target: – 1-2 meetings Meeting with the ministries of the environment, and employment and the economy November 2009 Meeting with the contact persons of the voluntary energy efficiency agreement municipalities (57 cities) November 2009  Invitation to actual meeting concerning energy certificates and Display

20 National Implementation Clubs (3.2) (3/3) Helsinki so far the only Display user Target: – 1-2 meetings – Conclusion  establishment of National Implementation Club – Meeting with the Finnish local and regional Energy Agencies and Motiva on March 2009 – Waits for the results of the meetings

21 Actions planned for the next 6 months period Campaign in schools will continue 40-50 schools DMU’s ”after” questionnaire Updating and finishing the Action Plan Seminars for key personnel/The City of Helsinki Network Finding new groups – Eco supporters Energy efficiency - not only energy certificates or Display First seminar National Implementation Club Larger National meeting – interest noticed  Finland Network?

22 Helsinki and Ulla thank you for your interest!


Download ppt "CYBER DISPLAY 3 RD STEERING COMMITTEE MEETING 24.-25.11.2009 Almada, Portugal."

Similar presentations


Ads by Google