Download presentation
Presentation is loading. Please wait.
Published byByron Mills Modified over 9 years ago
1
WPM ad-hoc group report TP#17 closing Group Name: WPM (TP adhoc) Source: convener WPM Roland Hechwartner, roland.hechwartner@t-mobile.at Meeting Date: 2015-05-22 Agenda Item: TP#17, Item: 11 TP-2015-0697-WPM_status_report_at_TP17_closing
2
Target Timeline for Release 2 2 TP15 Jan 2015 TP17 TP18 July 2015 TP20 Nov 2015 TP23 May 2016 R1 Publication and ratification TP15.1 R2 feature WIs R2 work program Marcom provides market view Initial version of Release description - check list for release finalization Target date for Stage 1 freeze R2 Essential Corrections - MNT Small Technical Enhancements - STE (R2) Target date for Stage 2 freeze R2 Target date for Stage 3 freeze R2 Source: TP-2015-0578R03-Release_2_planning_considerations
3
Feature Work Item View “Release 2 candidates” © 2015 oneM2M Partners TP-2015-0689R01-WPM_status_report_at_TP17_opening Prim. WGWork ItemName related TS / TR Start / RE- APPROVAL Target Date% compl WG5, WG1, WG2, WG3, WG4 WI 0025 Generic Interworking with Area Networks CRs to TR- 0007 TS- 0001 TS- 0003 TP#15TP#2120% WG1, WG2, WG3, WG5 WI-0026Efficient Communications CRs to TR- 0001 TS- 0002 TS- 0001 TS- 0004 TS8,9,10 TS- 05,06 TP#15TP#215% WG2, WG1 WI-0024LWM2M Interworking TS-0014TP#16TP#2340% WG2 WI-0011Service Component Architecture TS-0007TP#9TP#17100% WG4 WI-0021Secure Environment Abstraction TS-0016TP#14TP#2010% WG5 WI-0005Abstraction & Semantics Capability Enablement TR-0007 TS- 0002 TS- 0001 TS- 0004 TS- 0011 TS- 0012 TP#16TP#2315% WG1, WG2, WG3, WG4 WI-0029App-ID Clarification CRs to TS- 0001, TS- 0002, TS- 0003, TS- 0004, TS- 0011 TP#16TP#1825% WG1, WG2, WG4, WG5 WI-0030 M2M Application & Field Domain Component Configuration CRs to TS- 0002 TP#16TP#185% WG1, WG2, WG3, WG4 WI-0031Optimized Group-based Operation CRs to TS- 0001, TS- 0002, TS- 0004, TR- 0001, TR- 00012 TP#16 TP#19 TP#20 TP#21 10%
4
Work Item Status © 2015 oneM2M Partners TP-2015-0689R01-WPM_status_report_at_TP17_opening Prim. WGWork ItemName related TS / TR Start / Re- Approval Target Date % compl WG1 WI-0015oneM2M Use Case Continuation TR-0001 n.a. WG1 WI-0028Industrial Domain Enablement TR-0018 TP#15TP#1845% WG1, WG5 WI-0017Home Domain Enablement TR-0013 TR-0017 TP#13TP#2150% WG2 WI-0018oneM2M and AllJoyn Interworking TR-0014 TP#14TP#1870% WG3 WI-0020Service Layer API Core Principles TR-0015 TP#14TP#195% WG4 WI-0016 End-to-End Security and Group Authentication TR-0012 TP#11TP#2040% WG4 WI-0019Dynamic Authorization for IoT TR-0019 TP#14TP#185% WG4 WI-0023 Study of Authorization Architecture for Supporting Heterogeneous Access Control Policies TR-0016 TP#14TP#2035% WG6 WI-0022 Interoperability Testing TS-0013 TP#14TP#2580% WG6 WI-0027Testing Framework TS-0015 TP#15TP#2230% WG6 WI-0032Conformance Test TS-0017, TS-0018, TS-0019 TP#16TP#265%
5
Items for INFORMATION Release-1 Deliverables in Maintenance WGIDName Rel 1 Version latest Version WG1TS-0002RequirementsV1.0.1 WG1TS-0011Common TerminologyV1.2.1V1.3.0 WG2TS-0001Functional ArchitectureV1.6.1V1.8.0 WG3TS-0004Service Layer Core ProtocolV1.0.1V1.1.0 WG3TS-0008CoAP Protocol BindingV1.0.1 WG3TS-0009HTTP Protocol BindingV1.0.1 WG3TS-0010MQTT Protocol BindingV1.0.1V1.1.0 WG4TS-0003Security solutionsV1.0.1V1.1.0 WG5TS-0005Management enablement (OMA)V1.0.1V1.1.0 WG5TS-0006Management enablement (BBF)V1.0.1 V1.1.0 © 2015 oneM2M Partners TP-2015-0689R01-WPM_status_report_at_TP17_opening
6
Items for INFORMATION Release-2 Deliverables WGIDName latest Version Start Change Control Rel.2 Freeze Rel. 2 Approval WG1TS-0002 RequirementsV2.0.0n.a. TP18TP25? WG1TS-0011 Common TerminologyV2.0.0n.a. TP23TP25? WG2TS-0001 Functional ArchitectureV2.1.0n.a. TP20TP25? WG2TS-0007Service ComponentsV0.8.0TP9TP15 TP17 WG2TS-0014 LWM2M Interworking V0.2.0TP16TP21 TP23 WG3TS-0004 Service Layer Core ProtocolV1.1.0TP17 TP23TP25? WG3TS-0008 CoAP Protocol BindingV1.0.1 TP23 TP25? WG3TS-0009 HTTP Protocol BindingV1.0.1 TP23TP25? WG3TS-0010 MQTT Protocol Binding V1.1.0TP17 TP23TP25? WG4TS-0003 Security solutionsV1.0.1 TP23TP25? WG4TS-0016 Secure Environment Abstraction V0.0.1TP16TP18TP19TP20 WG5TS-0005 Management enablement (OMA) V1.1.0 TP23TP25? WG5TS-0006 Management enablement (BBF) V1.1.0 TP23TP25? WG5TS-0012 Base OntologyV0.2.0 TP15TP18TP19TP20 © 2015 oneM2M Partners TP-2015-0689R01-WPM_status_report_at_TP17_opening
7
Items for INFORMATION Testing Deliverables WGIDName latest Version Start Change Control FreezeApproval WG6TS-0013Interoperability Testing V0.0.4TP15TP18TP21TP22 WG6 TS-0015Testing Framework V0.2.0TP16TP18TP21TP22 WG6TS-0017 Implementation Conformance Statements V0.0.1TP17TP21TP22TP26 WG6TS-0018 Test Suite Structure and Test Purposes V0.0.1TP17TP21TP24TP26 WG6TS-0019 Abstract Test Suite & implementation eXtra Information for Test V0.0.1TP19TP23TP24TP26 © 2015 oneM2M Partners TP-2015-0689R01-WPM_status_report_at_TP17_opening
8
Items for INFORMATION Technical Reports in development © 2015 oneM2M Partners TP-2015-0689R01-WPM_status_report_at_TP17_opening WGIDName Latest Version FreezeApproval WG1TR-0001Use Cases CollectionV1.6.0n.a. WG1TR-0005Roles and Focus AreasV0.0.4n.a. WG1TR-0013Home Domain EnablementV0.2.1TP17TP18 WG1TR-0018Industrial Domain EnablementV0.1.1TP17TP18 WG2TR-0014oneM2M and AllJoyn InterworkingV0.0.0TP17TP18 WG3TR-0015Service Layer API Core PrinciplesV0.1.0TP18TP19 WG3TR-00yy Language Bindings for specific target programming languages V0.0.0TP18TP19 WG4TR-0012 End-to-End- Security_and_Group_Authentication V0.3.0TP18TP20 WG4TR-0016 Authorization Architecture and Access Control Policy V0.1.1TP19TP20 WG4TR-0019Dynamic AuthorizationV0.0.1TP18TP20 WG5TR-0007 Study on Abstraction and Semantics Enablement V2.5.0TP17TP18 WG5TR-0017 Home Domain Abstract Information Model V0.3.0TP20TP21
9
Next Steps Update of report post TP#17 – latest versions of TSs and TRs – WIs agreed during TP17 Work program status information on member portal – Work in progress Prepare Release 2 description for TP#18 finalization – Goal: high level technical description of Rel. 2 – Input / review comments invited See initial draft skeleton in TP-2015-0688 Release-2 control document – WPM 17.1 targeted to progress Release 2 description – Final drafting and agreement during TP#18 © 2015 oneM2M Partners TP-2015-0689R01-WPM_status_report_at_TP17_opening
10
Next Meetings / Calls Conference Call – WPM 17.1: July 1 @ 14:00 -15:00 (GMT) Face-to-Face – WPM#18.0: July 20-24, ad-hoc as required © 2015 oneM2M Partners TP-2015-0689R01-WPM_status_report_at_TP17_opening
Similar presentations
© 2024 SlidePlayer.com Inc.
All rights reserved.