Presented by: Eastern Research Group, Inc. September 27, 2005 Status Report to the WRAP Emissions Forum EDMS Testing.

Similar presentations


Presentation on theme: "Presented by: Eastern Research Group, Inc. September 27, 2005 Status Report to the WRAP Emissions Forum EDMS Testing."— Presentation transcript:

1 Presented by: Eastern Research Group, Inc. September 27, 2005 Status Report to the WRAP Emissions Forum EDMS Testing

2 2 Overview of Presentation Scope and Objectives Methodology Schedule for Completion Beta test-to-Beyond-Beta Test Comparison

3 3 Scope and Objectives Beta Test  Usability  Functionality Main/home pages Standard reports GIS/Dynamic reports (limited) Data upload (limited)  Data Integrity Inventory 1: 2002 Draft NEI Beyond-Beta Test  Bug Resolution  Functionality Ad hoc reports Standard reports (limited) GIS/Dynamic reports Data upload  Data Integrity Inventory 8: Version 1.2 Revisions, fire, biogenics  Specifications Compliance

4 4 EDMS Testing Methodology Beta Test  Test Plan General Main/home All areas of functionality  Test Worksheets  Bugzilla  Reporting Findings, statistical analysis Recommendations Beyond-Beta Test  Acceptance Plan (Pechan)  Test Plan New/revised functionality, data Bugzilla reports Specifications checklist  Reporting Findings Recommendations

5 5 EDMS Bug Resolution Beta Test Bugs:  113 by ERG + 98 by Others  211 Total Beyond-Beta Test to Confirm:  183 Closed  20 Open - Enhancement  8 Open - Unresolved  Others

6 6 Specifications Checklist General Requirements  Basic capabilities  User’s Manual Data Requirements  General  Point, Area, Onroad, Nonroad, Fire, Biogenics, Tribal and County Accounting, Data Versions Functional Requirements  General  Import, GIS, Fire, Reporting, Export, Security Reports  Standard, Ad hoc, Sector-specific Cross-Reference to Reported Bugs Reference: “EDMS Software and Hardware Development Plan,” Pechan 4/16/04

7 7 Specifications Evaluation Process First-time Test? Applicable Closed Bug? Evaluation:  Acceptable?  Unacceptable?  Cannot be Determined?

8 8 EDMS Testing – Next Steps Develop Queries from NIF files: 9/30  New fire and biogenics data  Revised point, area, mobile, nonroad data Begin Testing: 10/3 Complete Testing: 10/28 Draft Report: 11/15 Final Report: 12/15

9 THANK YOU! Any questions?


Download ppt "Presented by: Eastern Research Group, Inc. September 27, 2005 Status Report to the WRAP Emissions Forum EDMS Testing."