March 2, 2015 Kampala Mobility Map Transfer survey.

Similar presentations


Presentation on theme: "March 2, 2015 Kampala Mobility Map Transfer survey."— Presentation transcript:

1 March 2, 2015 Kampala Mobility Map Transfer survey

2 Waiting and transferring discourages people from using public transport

3 Bus route design can reduce transfers Home Transfer point SchoolIntroduce direct service

4 Output from transfer survey Transfer point Origins Destinations

5 Public transport passenger transfer survey Transfer survey helps us to distinguish between the – Passengers whose origin and destination is near the minibus taxi stop where they boarded/alighted and – Those passengers who are transferring to other minibus taxi routes It involves interviewing the minibus taxi passengers about details of their current trip The surveys are conducted during the peak period (6:30 a.m. to 9:30 a.m.)

6 Transfer Survey - Continued Surveys performed at a total of 35 major transfer locations throughout Kampala Surveys conducted along all legs of an intersection and on both sides of the road Public transport in Kampala mainly constitutes – Minibus taxis (14 seats) – 29 seat buses – 41 seat buses

7 Transfer Survey Form

8 Transfer Survey Form Data Entry Step 1: Write down your Name – Example: Chris Van Eyken Step 2: Write down the Survey Location – Example: Bombo Road and Makerere Hill Road Step 3: Write down the Survey Date – 02/03/2015 Step 4: Write down the Page Number – Example: Number the sheets as 1, 2, 3, and so on

9 Filling the Form – Questions to ask We are going to determine you about how many vehicles you took and from where. Where did you start your trip? By what type of vehicle? – Boda-boda, minibus taxi or bus? In this vehicle, what was the destination? At that (or this) location, how long did you (or will you) have to wait for the next minibus or bus?

10 For subsequent stages Where are you going now? Will you take another minibus or bus from there? – If answer is: “No this is the end of my trip” – If answer is: “Yes”, keep asking about further segments of the trip until they reach their destination

11 Transfer Survey Form Chris Kost Kampala Road and Dastur St CBD Seeta 7 30 1 CBD Makerere University 5 02 03 1 10 ---

12 Minibus taxi

13 Bus

14 Boda boda

15 BRT Surveys – Instructions Each surveyor will be assigned a surveyor id and a survey location Each surveyor will be reporting to a supervisor The surveyors should arrive at the survey location 30 minutes before the start of data collection. The filled forms must be handed over to supervisor after the end of the survey on each day In case of emergency, please call Stephanie Lotshaw (0771276981) Chris Van Eyken (0778093173) Chris Kost (0753396478)

16 BRT Surveys – Supplies Survey Form & Clipboard Writing Pad/Folder Pen Wrist Watch/Stop Watch/Phone (bring your own) Authorization Letter Badge/ID

17 At the end of the day…. Input your data into the matching Excel spreadsheet – This will be sent to you Email it to christopher.vaneyken@itdp.org by 5:00 p.m.christopher.vaneyken@itdp.org – Add the date and your name to the file name If you do not have a computer or access to the Internet please let us know

18 Schedule/Logistics information Transfer test day: Monday March 2 – Transfer (Tuesday March 3 rd & Wednesday March 4 th ), – Frequency & Visual Occupancy (March 5 th, 6 th, 9 th and 10 th ), – BA on-board (March 11 th - 27 th ) You will be paid for the training and the days you work. You will receive your wages at the end of each week. You will turn in the hard copies of your survey forms at this time.

19 www.itdp.org @itdpindia Thank you