Permit to Work Occupational Health, Safety & Environment Training.

Similar presentations


Presentation on theme: "Permit to Work Occupational Health, Safety & Environment Training."— Presentation transcript:

1 Permit to Work Occupational Health, Safety & Environment Training

2 Outcome What is a Permit-to-Work Why we need a Permit-to-Work system
The Permit process Reviewing the Permit What to do when completed permits are not acceptable

3 Our Safety Culture requires

4 What is a Permit-to-Work?
A permit-to-work is a document that authorises workers to carry out specific work within a specified time frame. It sets out the precautions required to complete the work safely. It describes WHAT work will be done and WHO is responsible. The permit-to-work requires declarations from the people authorising the work (Site Management Team) and those carrying out the work (employees or subcontractors). A completed Permit gives permission for work to start

5 Why we need a Permit-to-Work?
A Permit-to-Work system allows Site Managers & Supervisors to more effectively control High Risk Work, while making subcontractors and employees more accountable for safety controls.

6 High Risk Work on Site Working at Height Permit (building a scaffold)
Site Management can better monitor HRW and control surrounding trades. More frequent observations may be scheduled. Working at Height Permit (building a scaffold) Lifting Permit (moving large shutters)

7 Permit process Step 1 Permit issued by Site Manager, Supervisor or Safety Representative (complete valid FROM & TO field) Step 2 Permit taken to worksite and completed by subcontractor or C&O employee Step 3 Permit returned to Site Manager / Supervisor for approval Step 4 Permit thoroughly reviewed and signed by Site Manager / Supervisor** Step 5 Work can commence ** Permits are to be signed BEFORE works commence, not at the end of the day.

8 Scenario 1 One workgroup undertakes the same work at multiple locations on site. One Permit can be used (max of 1 week) Why? The same person is responsible and directly in charge of the work. ** Be sure that all safety controls on the Permit can be implemented at each location. Finish Start

9 Scenario 2 Group 3 Group 2 Group 1
Multiple workgroups undertake the same work at multiple locations on site. Multiple Permits are required Why? Different people are responsible and directly in charge of the seperate work areas. Group 3 Group 2 Group 1

10 Reviewing Permits The Permit has been intentionally formatted for ease of use and review. Positive responses have been highlighted in grey ‘No’ responses require an explanation in the textbox provided

11 Current Permits Working at Height Lifting Excavation Hot Work
Concrete Cutting / Coring Confined Space More Permits may be added in the future.

12 Unacceptable Permits Submissions
When unacceptable responses are provided, the permit will be returned to the subcontractor (or C&O employee). Work can not proceed until permit controls have been implemented Lorenzo Snow

13 Questions What permits are you currently using on site?
How often are observations made to ensure that workers comply with the permit? How often are permits reissued?

14 Conclusion The Permit-to-Work system assists Site Management to fulfill their duty of care responsibilities involving HRW. It also assists in the coordination of work activities and makes workers more accountable for safety.