Presentation is loading. Please wait.

Presentation is loading. Please wait.

SANREM CRSP Reporting Requirements ______________________________________________________________________________________ Annual Meeting Blacksburg, Virginia.

Similar presentations


Presentation on theme: "SANREM CRSP Reporting Requirements ______________________________________________________________________________________ Annual Meeting Blacksburg, Virginia."— Presentation transcript:

1 SANREM CRSP Reporting Requirements ______________________________________________________________________________________ Annual Meeting Blacksburg, Virginia 18-20 April 2006

2 ______________________________________________________________________________________ Annual Meeting Blacksburg, Virginia 18-20 April 2006 SANREM Knowledge Base (SKB) Quarterly Reports Annual Reports Trip Reports Research Reports Types of Reporting

3 ______________________________________________________________________________________ Annual Meeting Blacksburg, Virginia 18-20 April 2006 SANREM Knowledge Base (SKB) The SKB is a key component of the SANREM CRSP All SANREM participants are required to document the information resources they contribute to SA & NRM knowledge (articles, reports, books, presentations, photos, videos, extension and training materials, etc.) The SKB will be linked to publicly accessible digital resource libraries (Agriculture Network Information Center, INFOMINE) http://www.oired.vt.edu/sanremcrsp/menu_information/ knowledgebase.php

4 ______________________________________________________________________________________ Annual Meeting Blacksburg, Virginia 18-20 April 2006 Quarterly Reports Due: 15 January, 15 April, 15 July Describe project outputs, results and impacts (1 to 2 pages) By objective and system level addressed Extent to which on schedule Obstacles encountered and lessons learned Training, capacity building, and networking activities

5 ______________________________________________________________________________________ Annual Meeting Blacksburg, Virginia 18-20 April 2006 Annual Reports Due: 15 October IExecutive Summary IIResearch Outputs, Results and Impacts by Objective IIIDegree and Non-Degree Training Activities IVPublications, Presentations and other SANREM CRSP Products VNetworking Activities VIProject Impact Highlights – “Bullets”

6 ______________________________________________________________________________________ Annual Meeting Blacksburg, Virginia 18-20 April 2006 IIResearch Outputs, Results and Impacts by Objective describe the major tasks and outputs completed; abstract key research findings; note the system level to which the objective corresponds; describe how the research results in development impact following the pathway developed with the TOP Table; and note the extent to which the project timeline is being met, any obstacles encountered, and the actions taken and lessons learned. Please provide a maximum of one page for each objective according to your original research objectives as set out at the beginning of the year:

7 ______________________________________________________________________________________ Annual Meeting Blacksburg, Virginia 18-20 April 2006 Concise Problem Statement: SEE Conditions SocialEconomicEnvironmental Objective 1: Indicators for: Practices Impacts KnowledgeAttitudesSkillsAspirationsCapabilities The Development Impact Pathway Concise Problem Statement: SEE Conditions SocialEconomicEnvironmental Objective 1: Indicators for: Practices Impacts KnowledgeAttitudesSkillsAspirationsCapabilities

8 ______________________________________________________________________________________ Annual Meeting Blacksburg, Virginia 18-20 April 2006 Trip Reports Must be submitted within 15 days following completion of each international trip Dates of Travel Sites Visited: Names of Travelers: Purpose of Trip: Description of activities, technical observations Progress in meeting objectives: Suggestions and Recommendations (as appropriate): List of Contacts Made:

9 ______________________________________________________________________________________ Annual Meeting Blacksburg, Virginia 18-20 April 2006 Research Reports SANREM CRSP Knowledge and Information Products for Decision Makers should be documented in the SKB disseminated widely SANREM CRSP partners may hold data sets for up to two years before release to facilitate publication and scholarly activities, but ultimately all SANREM CRSP generated data must be made available to the public with proper documentation (metadata) so that it can be used by others. Research Briefs; Technical Reports; etc. Use local languages as appropriate

10 ______________________________________________________________________________________ Annual Meeting Blacksburg, Virginia 18-20 April 2006 Branding: the Mark of Zorro http://www.usaid.gov/branding/ Branding: The USAID logo must be prominently displayed on all equipment, vehicles, etc.

11 ______________________________________________________________________________________ Annual Meeting Blacksburg, Virginia 18-20 April 2006 Publications and presentations funded by SANREM should acknowledge USAID support with the following statement: "This publication/presentation was made possible through support provided by the United States Agency for International Development for the Sustainable Agriculture and Natural Resources Management Collaborative Research Support Program under terms of Cooperative Agreement Award No. EPP-A-00-04-00013-00 to the Office of International Research, Education, and Development at Virginia Polytechnic Institute and State University." Branding: the Mark of ZorroBranding:

12 ______________________________________________________________________________________ Annual Meeting Blacksburg, Virginia 18-20 April 2006 Thank you for submitting your reports in a timely fashion


Download ppt "SANREM CRSP Reporting Requirements ______________________________________________________________________________________ Annual Meeting Blacksburg, Virginia."

Similar presentations


Ads by Google