Unit 3 Term: Panama Canal By: C. Weaver. About From 1819, Panama was part of the federation and country of Colombia but when Colombia rejected United.

Similar presentations


Presentation on theme: "Unit 3 Term: Panama Canal By: C. Weaver. About From 1819, Panama was part of the federation and country of Colombia but when Colombia rejected United."— Presentation transcript:

1 Unit 3 Term: Panama Canal By: C. Weaver

2 About From 1819, Panama was part of the federation and country of Colombia but when Colombia rejected United States plans to build a canal across the Isthmus of Panama, the U.S. supported a revolution that led to the independence of Panama in 1903. the new Panamanian government authorized French businessman Philippe Bunau-Varilla, to negotiate a treaty with the United States. The Hay- Bunau-Varilla Treaty allowed the U.S. to build the Panama Canal and provided for perpetual control of a zone five-miles wide on either side of the canal. The 48 mile-long (77 km) international waterway known as the Panama Canal allows ships to pass between the Atlantic Ocean and Pacific Ocean, saving about 8000 miles (12,875 km) from a journey around the southern tip of South America, Cape Horn.

3 Statistics Annual traffic has risen from about 1,000 ships in 1914, when the canal opened, to 14,702 vessels in 2008, the latter measuring a total of 309.6 million Panama Canal/Universal Measurement System (PC/UMS) tons. By 2008, more than 815,000 vessels had passed through the canal; the largest ships that can transit the canal today are called Panamax. The American Society of Civil Engineers has named the Panama Canal one of the seven wonders of the modern world. The increasing rate of melting of ice in the Arctic Ocean has led to speculation that the Northwest Passage or Arctic Bridge may become viable for commercial shipping at some point in the future. This route would save 9,300 km (5,800 mi) on the route from Asia to Europe compared with the Panama Canal, possibly leading to a diversion of some traffic to that route. However, such a route is beset by unresolved territorial issues and would still hold significant problems owing to ice.[

4 Plans As demand is rising for efficient global shipping of goods, the canal is positioned to be a significant feature of world shipping for the foreseeable future. However, changes in shipping patterns—particularly the increasing numbers of larger-than-Panamax ships— will necessitate changes to the canal if it is to retain a significant market share. In 2006 it was anticipated that by 2011, 37% of the world's container ships would be too large for the present canal, and hence a failure to expand would result in a significant loss of market share. The maximum sustainable capacity of the present canal, given some relatively minor improvement work, is estimated at 330–40 million PC/UMS tons per year; it was anticipated that this capacity would be reached between 2009 and 2012. Close to 50% of transiting vessels were already using the full width of the locks. An enlargement scheme similar to the 1939 Third Lock Scheme, to allow for a greater number of transits and the ability to handle larger ships, has been under consideration for some time, has been approved by the government of Panama, and is in progress, with completion originally expected by the end of 2014. The cost is estimated at US$5.25 billion, and the project will double the canal's capacity, allowing more traffic and the passage of longer and wider ships. This proposal to expand the canal was approved in a national referendum by about 80% on October 22, 2006.

5 The Third Locks Set Project The current plan is for two new flights of locks to be built parallel to, and operated in addition to, the old locks: one east of the existing Gatun locks, and one southwest of the Miraflores locks, each supported by approach channels. Each flight will ascend from sea level directly to the level of Gatun Lake; the existing two-stage ascent at Miraflores and Pedro Miguel locks will not be replicated. The new lock chambers will feature sliding gates, doubled for safety, and will be 427 m (1,400 ft) long, 55 m (180 ft) wide, and 18.3 m (60 ft) deep. This will allow the transit of vessels with a beam of up to 49 m (160 ft), an overall length of up to 366 m (1,200 ft) and a draft of up to 15 m (49 ft), equivalent to a container ship carrying around 12,000 containers, each 6.1 m (20 ft) in length (TEU). The new locks will be supported by new approach channels, including a 6.2 km (3.9 mi) channel at Miraflores from the locks to the Gaillard Cut, skirting Miraflores Lake. Each of these channels will be 218 m (720 ft) wide, which will require post-Panamax vessels to navigate the channels in one direction at a time. The Gaillard Cut and the channel through Gatun Lake will be widened to at least 280 m (920 ft) on the straight portions and at least 366 m (1,200 ft) on the bends. The maximum level of Gatun Lake will be raised from 26.7 m (88 ft) to 27.1 m (89 ft). Each flight of locks will be accompanied by nine water reutilization basins (three per lock chamber), each basin being about 70 m (230 ft) wide, 430 m (1,400 ft) long and 5.50 m (18 ft) deep. These gravity-fed basins will allow 60% of the water used in each transit to be reused; the new locks will consequently use 7% less water per transit than each of the existing lock lanes. The deepening of Gatun Lake and the raising of its maximum water level will also provide capacity for significantly more water storage. These measures are intended to allow the expanded canal to operate without constructing new reservoirs. The estimated cost of the project is US$5.25 billion. The project is designed to allow for an anticipated growth in traffic from 280 million PC/UMS tons in 2005 to nearly 510 million PC/UMS tons in 2025. The expanded canal will have a maximum sustainable capacity of about 600 million PC/UMS tons per year. Tolls will continue to be calculated based on vessel tonnage, and will not depend on the locks used. The new locks are expected to open for traffic in 2016. The present locks, which will be 100 years old by that time, will then be able to give engineers greater access for maintenance, and are projected to continue operating indefinitely. An article in the February 2007 issue of Popular Mechanics magazine describes the plans for the canal, focusing on the engineering aspects of the expansion project. There is also a follow-up article in the February 2010 issue of Popular Mechanics. On September 3, 2007, thousands of Panamanians stood across from Paraíso Hill in Panama to witness a huge initial explosion and launch of the Expansion Program. The first phase of the project will be dry excavations of the 218 meters (715 feet) wide trench connecting the Gaillard Cut with the Pacific coast, removing 47 million cubic meters of earth and rock. By June 2012, a 30 m reinforced concrete monolith had been completed, the first of 46 such monoliths which will line the new Pacific-side lock walls. By early July 2012, however, it was announced that the canal expansion project had fallen six months behind schedule, leading expectations for the expansion to open in April 2015 rather than October 2014, as originally planned. By September, 2014, the new gates were projected to be open for transit at the "beginning of 2016”. The date is now set for April, 2016.