1 This presentation will probably involve audience discussion, which will create action items. Use PowerPoint to keep track of these action items during your presentation In Slide Show, click on the right mouse button Select “Meeting Minder” Select the “Action Items” tab Type in action items as they come up Click OK to dismiss this box This will automatically create an Action Item slide at the end of your presentation with your points entered. Station Report in Zimbabwe Shumba Blessing T

2 2 Zimbabwe Seismic Network The four stations : Kri, Mtd, Byo, Cir produced analog recordings up to 1993 when the stations ceased operating. Implying that from 1993 to 2003 when Matp station was opened, there was no monitoring. Matp station has been operating since 2003 as a single three component station.

3 3 Africa Array Seismic Stations in Zimbabwe

4 BULS -133SZNEAnalogueRadio1983 - 1996 Down MTDS - 131 SZAnologueRadio1983 - 1995 Down CIRS - 131 SZAnologueRadio1983 - 1995 Down KRIS - 131 SZAnologueRadio1983 - 1995 Down MATPST - 1303 CompDigitalSatellite2002 - Present Up BLWYReftek System 3 CompDigitalManual Collection of data 2002 - Present Up HareReftek System 3 CompDigitalManual Collection of data 2002 - Present Up 4

5 5 2 africa array seimic stations HARE BLWY Data Collection from Africa Array stations  Collection of data is not real time but is done once a month. CTBTO – Auxiliary seismic station MATP Data Collection from CTBTO station  Data is obtained in real time

6 The 15meter tunnel was excavated inside this mountain 6 ● The site is within the National Park premises. ● The entrance to the tunnel is kept secured at all times. Access to the tunnel is possible only with personnel from NDC

7 7 This is a self contained office with the required equipment housed in this 15metre 3- compartment office. ● The satellite dish and the generator are behind the mountain.

8 8 Vsat at MATP seismic site Vsat at Goetz ( National Data Centre)