Presentation is loading. Please wait.

Presentation is loading. Please wait.

EE/CS 480 Spring 2008 1March, 2008 University of Portland School of Engineering Yellow Rumped Warblers Instant Message Control System Team Kenneth Lee.

Similar presentations


Presentation on theme: "EE/CS 480 Spring 2008 1March, 2008 University of Portland School of Engineering Yellow Rumped Warblers Instant Message Control System Team Kenneth Lee."— Presentation transcript:

1 EE/CS 480 Spring 2008 1March, 2008 University of Portland School of Engineering Yellow Rumped Warblers Instant Message Control System Team Kenneth Lee Rob Vandermeulen Mike Rumely Vladimir Shvets Advisor Dr. Nuxoll Industry Representative Jason Favors Harland Financial Solutions

2 EE/CS 480 Spring 2008 2March, 2008 University of Portland School of Engineering Overview Introduction Scorecard Additional Accomplishments Plans Issues/Concerns Conclusions

3 EE/CS 480 Spring 2008 3March, 2008 University of Portland School of Engineering Introduction Instant message control system for electrical devices.

4 EE/CS 480 Spring 2008 4March, 2008 University of Portland School of Engineering Introduction (cont.)

5 EE/CS 480 Spring 2008 5March, 2008 University of Portland School of Engineering Scorecard March Plans- Translate textual message YellowTooth software review Test and Debug Bluetooth communication Interface Hardware Components Power electrical device using instant message Completed Plans- Almost all plans for March were completed as scheduled

6 EE/CS 480 Spring 2008 6March, 2008 University of Portland School of Engineering Scorecard (cont.) Shortcomings- Testing Bluetooth/PIC system together with switch box Software Review

7 EE/CS 480 Spring 2008 7March, 2008 University of Portland School of Engineering Additional Accomplishments Finished switch box. Filmed software with PIC portion of the system.

8 EE/CS 480 Spring 2008 8March, 2008 University of Portland School of Engineering Plans Successfully interface switchbox with PIC Get started on the Final Report

9 EE/CS 480 Spring 2008 9March, 2008 University of Portland School of Engineering Milestones NumberDescriptionOriginalPreviousPresent 1Translate textual message03/06/08 2YellowTooth Software Review03/07/08 3Test and Debug Bluetooth communication 03/12/08 4Interface Switchbox and Bluetooth 03/18/08 5Power electrical device using instant message 04/03/08 6Test and Debug the complete system 04/07/08 7Present Yellowtooth04/08/08 8Final Report is Due04/23/08

10 EE/CS 480 Spring 2008 10March, 2008 University of Portland School of Engineering Concerns/Issues Founder's Day Demo -Getting Bluetooth signal from the third floor.

11 EE/CS 480 Spring 2008 11March, 2008 University of Portland School of Engineering Conclusions Will be ready to demonstrate the working project by Founder's day

12 EE/CS 480 Spring 2008 12March, 2008 University of Portland School of Engineering


Download ppt "EE/CS 480 Spring 2008 1March, 2008 University of Portland School of Engineering Yellow Rumped Warblers Instant Message Control System Team Kenneth Lee."

Similar presentations


Ads by Google