Presentation is loading. Please wait.

Presentation is loading. Please wait.

A. Sim, CRD, L B N L 1 SRM Collaboration, Aug. 2006 SRM implementations and deployments that may affect OSG in the near-term Alex Sim Scientific Data Management.

Similar presentations


Presentation on theme: "A. Sim, CRD, L B N L 1 SRM Collaboration, Aug. 2006 SRM implementations and deployments that may affect OSG in the near-term Alex Sim Scientific Data Management."— Presentation transcript:

1 A. Sim, CRD, L B N L 1 SRM Collaboration, Aug. 2006 SRM implementations and deployments that may affect OSG in the near-term Alex Sim Scientific Data Management Group Computational Research Division Lawrence Berkeley National Laboratory

2 A. Sim, CRD, L B N L 2 SRM Collaboration, Aug. 2006Goals Deploy stable and reliable storage management to OSG-SE/CEDeploy stable and reliable storage management to OSG-SE/CE Compliant to SRM specifications Interoperate with other SRM implementations and deployed SRMs, including SRMs deployed in Europe

3 A. Sim, CRD, L B N L 3 SRM Collaboration, Aug. 2006 Current deployment status SRM servers deployed in OSGSRM servers deployed in OSG SRM/dCache from FNAL SRM/DRM from LBNL SRM client deployed in OSGSRM client deployed in OSG srmcp from FNAL SRM-TesterSRM-Tester All currently deployed SRM versions are compliant to SRM spec v1.1All currently deployed SRM versions are compliant to SRM spec v1.1

4 A. Sim, CRD, L B N L 4 SRM Collaboration, Aug. 2006 SRM interop test result for v1.1 (8/21/2006) pinggetputadvisory delete ARC (UIO.NO)pass fail LCG/EGEE (CERN)pass FNALpass STAR (LBL.GOV)pass OSG (SDSC.EDU)pass EGEE (IC.UK)pass COPY/PULL case Target SRM  ARC (UIO.NO) LCG/EGEE (CERN.CH) FNALSTAR (LBL.GOV) OSG (SDSC.EDU) EGEE (IC.UK) Source SRM  ARCN.A.fail N.A.fail LCG/EGEE (CERN.CH)failpass N.A.pass FNALfailN.A.passN.A.pass STAR (LBL.GOV)failN.A.passN.A.pass OSG (SDSC.EDU)failN.A.pass EGEE (IC.UK)failN.A.pass N.A. http://sdm.lbl.gov/srm-tester

5 A. Sim, CRD, L B N L 5 SRM Collaboration, Aug. 2006 new implementation status SRM spec v2.2SRM spec v2.2 SRM serversSRM servers SRM/dCache from FNAL SRM/DRM from LBNL SRM/L-Store from Vanderbilt SRM clientSRM client srm-clients package SRM-TesterSRM-Tester New implementations will begin deployed in Nov 2006.New implementations will begin deployed in Nov 2006. OSG deployment : ITB 0.6 or ITB 0.8

6 A. Sim, CRD, L B N L 6 SRM Collaboration, Aug. 2006 What’s new in the v2.2 spec? Active space reservationActive space reservation With negotiated sizes and time limits Multiple space reservations for different work Ability to “stage” files with deferred start timeAbility to “stage” files with deferred start time srmBringOnline

7 A. Sim, CRD, L B N L 7 SRM Collaboration, Aug. 2006 Impacts of new deployments All new versions will not communicate with older versions.All new versions will not communicate with older versions. For example, old srmcp for SRM v1.1 will not be able to communicate with new SRM v2.2 based servers. New SRM servers cannot interoperate with older SRM servers in copy case. Both versions will co-exist for a while. Will require community-wide plans and efforts to update SRMs within OSGWill require community-wide plans and efforts to update SRMs within OSG Targeted by ITB 0.8

8 A. Sim, CRD, L B N L 8 SRM Collaboration, Aug. 2006 SRM interop test result for v2.2 (8/21/2006) Methods CERN Castor CERN DPM FNAL dCache RAL Castor LBNL SRM srmPingOk ExceptionOk srmPrepareToPut, srmStatusToPut, srmPutDone N.A.Ok srmPrepareToGet, srmStatusToGetExceptionOk FailedOk SrmReleaseN.A.Ok N.A.Ok MkdirOk RmdirOk SrmMvN.A.Ok SrmRmN.A.Ok SrmLsException OkExceptionOk SrmReserveSpaceFailedOkFailed Ok SrmReleaseSpace N.A. Ok N.A. Ok

9 A. Sim, CRD, L B N L 9 SRM Collaboration, Aug. 2006 SRM interop test result for v2.2 (8/21/2006) Methods CERN Castor CERN DPM FNAL dCache RAL Castor LBNL SRM SrmPrepareToPut, srmStatusOfPut, srmPutDone (with reserved space) N.A.Ok N.A. Ok SrmPrepareToGet, srmStatusOfGet (with reserved space) N.A. Ok N.A. Ok MethodsCERN Castor CERN DPM FNAL dCache RAL Castor LBNL SRM COPY from Gridftp Source to SRM Failed (work in progress) N.A. Ok Failed (work in progress) Ok http://sdm.lbl.gov/srm-tester

10 A. Sim, CRD, L B N L 10 SRM Collaboration, Aug. 2006 SRM interop test result for v2.2 (8/21/2006) Copy/PULL Target SRM Source SRM CERN CastorCERN DPM FNAL dCacheRAL CastorLBNL SRM CERN CastorN.A. FailedN.A. Failed CERN DPMN.A. OkN.A. Ok FNAL dCacheN.A. Ok RAL CastorN.A. Failed LBNL SRMN.A. FailedN.A. Copy/PUSH Target SRM Source SRM CERN CastorCERN DPM FNAL dCacheRAL CastorLBNL SRM CERN CastorN.A. CERN DPMN.A. FNAL dCacheFailedOk Failed RAL CastorN.A. LBNL SRMFailedOk Failed


Download ppt "A. Sim, CRD, L B N L 1 SRM Collaboration, Aug. 2006 SRM implementations and deployments that may affect OSG in the near-term Alex Sim Scientific Data Management."

Similar presentations


Ads by Google