Presentation is loading. Please wait.

Presentation is loading. Please wait.

Swarna Jayanti Gram Swarojgar Yojana (SGSY). Physical achievement under SGSY -2009-10 Sl. No Name of the Block Physical Target for 2009-10Physical Achievement.

Similar presentations


Presentation on theme: "Swarna Jayanti Gram Swarojgar Yojana (SGSY). Physical achievement under SGSY -2009-10 Sl. No Name of the Block Physical Target for 2009-10Physical Achievement."— Presentation transcript:

1 Swarna Jayanti Gram Swarojgar Yojana (SGSY)

2 Physical achievement under SGSY -2009-10 Sl. No Name of the Block Physical Target for 2009-10Physical Achievement % of Phy. Ach. No. of SHG No.of Swaojr agires No. of Ind. Total Swaojr agires No. of SHG No.of Swaojr agires No. of Ind. Total Swo 1234567891011 1SADAR3837710448138443125568118 2GONDIA4948613562157618146764123 3ODAPADA4444412356746545127672119 4HINDOL5454314869154616152768111 5BHUBAN23225622872225968327114 6K.NAGAR28281783592932883411114 7K.HAD32321894102835771428104 8PARJANG353529744938447108555124 TOTAL :3033029836386531236138804493116

3 Financial achievement under SGSY -2009-10 Name of the Block Finacial Target for 2009-10Financial Achievement % of Fin. Ach. Physic al Target Credit Mobiliz -ation Target Subsidy Target Total Loan PhysicalCredit Mobilisation SubsidyTotal Loan 12345678910 SADAR 48196.5148.10144.6156862.3537.83100.1879 GONDIA 621124.5162.10186.6176458.2138.7396.9462 ODAPADA 567113.6956.70170.3967288.0855.65143.7398 HINDOL 691138.5969.10207.69768121.8361.76183.5989 BHUBAN 28757.4828.7086.1832770.5626.6097.1693 K.NAGAR 35972.0435.90107.9441173.0031.75104.7588 K.HAD 41082.1541.00123.1542864.6733.9698.6383 PARJANG 44990.1544.90135.0555588.6045.44134.04101 TOTAL : 3865775.12386.501161.624493627.30331.72959.0286

4 Block wise achievement of Individual Swarojgaries under different category Sl. N o. Name of the Block Cured Lepros y patient Family members of prisoners Physic ally handic apped Destit ute VictimEducat ed Un emplo yed youth Total 1.Sadar22441571125 2.Gondia14567177146 3.Odapada745815043127 4.Hindol177487352152 5.Bhuban3134291068 6.Kamakhyan agar 11159120083 7.Kankadahad62101313971 8.Parjang734726025108 Total542435617613257880

5 SGSY INFRASTRUCTURE SGSY INFRASTRUCTURE  A sum of Rs.105.88 lakh has been provided to take up SGSY Infrastructure projects for the year 2009- 10.  Similarly, a sum of Rs.45.00 lakh has been provided for construction of 3 numbers village haats in Sadar / Hindol / Kankadahd Block of the District.  Funds to the tune of Rs.42.94 lakh has been released during the financial year 2009-10 towards imparting training under SGSY scheme.


Download ppt "Swarna Jayanti Gram Swarojgar Yojana (SGSY). Physical achievement under SGSY -2009-10 Sl. No Name of the Block Physical Target for 2009-10Physical Achievement."

Similar presentations


Ads by Google