Presentation is loading. Please wait.

Presentation is loading. Please wait.

1 The A.S.SO. Programme Environmental Actions for Sustainable Development.

Similar presentations


Presentation on theme: "1 The A.S.SO. Programme Environmental Actions for Sustainable Development."— Presentation transcript:

1 1 The A.S.SO. Programme Environmental Actions for Sustainable Development

2 Adopted in the second half of 2003 The aim: “The integration of environemntal items into different policies”

3 In 2004 it was selected as a best practice to participate to GreenWeek Event

4 Axis I concerns the integration of environmental concerns in all the main economic sectors of the Region: -Industry; -Agriculture; -Craft; -Tourism The Asso Programme is divided into four Axes

5 Axis II This section supports Plans for the sustainable development of some environmetally critical areas

6 Axis III This Axis finances few pilot projects aimed to pursue an environmental sustainable development

7 Axis IV This section concerns general actions for the implementation of the whole Programme

8 Total cost of the Programme: € 1,320,000.00 Budget (2003) Axis I € 540,000.00 Axis II € 600,000.00 Axis III € 155,000.00 Axis IV € 25,000.00 Funding sources: National and Regional Funds

9 The four actions of the Axis I: Integration between Industry and Environment; Integration between Craft and Environment; Integration between Tourism and Environment; Integration between Agriculture and Environment

10 Action a) Industry/Environment Implementation of Environmental Management Systems within SMEs The projects were selected by a call Eligible territory: out of Objective 2

11 Results: 16 projects have been co-financed to set up EMSs and to achieve the certification or registration according to the UNI ISO 14001 and EMAS Regulation Total current co-financing: € 165.000,00

12 Action b) Craft/Environment The main aim: to set up some environmental consultancy services in order to improve the integration of environmental concerns into the craft sector The instrument: a Voluntary Agreement between the Marche Region and some Trade Unions of the craft sector

13 Environmental consultancy aimed to: -The adoption of lower environmental impact productive processes; -The realization of products with a lower environmental impact; -The implementation of EMSs within the craft sector

14 Expected results: - The opening of 12 “environmental info point”; -The onset of procedures for the EMAS registration of a craft district area. Current budget: € 172.000,00 (€ 86.000,00 regional funds contribution)

15 Action c) Tourism/Environment The aim: to improve regional tourist offer, directing it towards actions and forms with a lower environmental impact, and reducing the use of resources

16 Action c) is divided into two measures Measure 1: Design for the environmental enhancement of an area with high tourist concentration Measure 2: Projects for the eco-efficiency of tourist accommodation

17 Action c) budget: € 165,000.00 Measure 1: € 100,000.00 Measure 2: € 65,000.00

18 Measure 1 - Main results : - Initial analysis of environmental weakness and performances of an area belonging to a Local Tourist System; - Drafting two definitive projects concerning intervention stressed by the environmental analysis (moving some campings from the coastline; planning a sustainable transport plan).

19 Measure 2 - Main results The analysis of the environmental performances of 4 tourist firms; The adoption of working plans of the interventions that the environemntal analysis showed as priorities, aimed to the adoption of EMSs

20 Action d) Agriculture/Environment This action co-finances projects that merge agriculture and environment by means of renawable energy sources: woodchips

21 Type of project: Plantation of hedgerows and buffer strips To support their use for woodchip production To create an agro-energetic supply chain

22 Axis II Local Plans for Sustainable Devolopment of special areas (environmental problems, settlement congestion, sometimes related to crisis in some productive sector or district)

23 3 projects were co-financed Each of them was co-financed by Marche Region with a sum of € 150,000.00

24 Axis III Funding pilot projects Innovative approach to pursue sustainable development in the regional territory Ex. Project concerning urban planning or EMAS for Local Authorities


Download ppt "1 The A.S.SO. Programme Environmental Actions for Sustainable Development."

Similar presentations


Ads by Google