Presentation is loading. Please wait.

Presentation is loading. Please wait.

Missouri River Forecaster’s Meeting January 28-29, 2014 Scott Guenthner Great Plains Regional Office Billings, Montana Reclamation Reservoir Status.

Similar presentations


Presentation on theme: "Missouri River Forecaster’s Meeting January 28-29, 2014 Scott Guenthner Great Plains Regional Office Billings, Montana Reclamation Reservoir Status."— Presentation transcript:

1 Missouri River Forecaster’s Meeting January 28-29, 2014 Scott Guenthner Great Plains Regional Office Billings, Montana Reclamation Reservoir Status

2

3 Great Plains Region Area Offices and Administrative Areas

4 Reservoir Locations Reservoirs in Great Plains Region Total = 80 In MRB = 48 w/Flood Control = 22

5

6 Great Plains Region Area Offices and Administrative Areas

7 Drought Monitor Map Reflects Reclamation Reservoir Storage Condition

8

9

10

11

12

13

14 Available Space Available Space ---- 2.5 million af Exclusive Flood Control Space ---- 4.0 million af Space available in Fort Peck --- 6 million af

15 Questions??


Download ppt "Missouri River Forecaster’s Meeting January 28-29, 2014 Scott Guenthner Great Plains Regional Office Billings, Montana Reclamation Reservoir Status."

Similar presentations


Ads by Google