9/23/2009 NOTICE! These materials are prepared only for the students enrolled in the course Distributed Software Development (DSD) at the Department of.

Similar presentations


Presentation on theme: "9/23/2009 NOTICE! These materials are prepared only for the students enrolled in the course Distributed Software Development (DSD) at the Department of."— Presentation transcript:

1 9/23/2009 NOTICE! These materials are prepared only for the students enrolled in the course Distributed Software Development (DSD) at the Department of Computer Science and Engineering, University of Mälardalen, Västerås, Sweden and at the Faculty of Electrical Engineering and Computing, University of Zagreb, Croatia (year 2009/2010). For all other purposes, authors’ written permission is needed! The purpose of these materials is to help students in better understanding of lectures in DSD and not their replacement!

2 9/23/2009 Distributed Software Development

3 9/23/2009 Project Plan Satish Jaiswal WikiPres@MdH

4 9/23/2009 Overview Project Background Milestones Plan for milestones Development Methodology Deliverables Activity Plan Financial Plan Project Risks

5 9/23/2009 Project Background SCREEN SHOTS User Comments: This slide is really good Comments in database SENARIO 1 ODP FILE ODP – Open Document Presentation Java Plug-in Web Page

6 9/23/2009 Project Background WIKI ENGINE User(s) makes changes in the presentations SENARIO 2 ODP FILE ODP – Open Document Presentation Java Plug-in Java Plug-in Web page MODIFIED OPD

7 9/23/2009 Project Background WIKI ENGINE User(s) makes changes in the presentations SENARIO 2 ODP FILE ODP – Open Document Presentation Java Plug-in Java Plug-in Web page MODIFIED OPD

8 9/23/2009 Project Background WIKI ENGINE User(s) makes changes in the presentations SENARIO 2 ODP FILE ODP – Open Document Presentation Java Plug-in Java Plug-in Web page MODIFIED OPD

9 9/23/2009 Project Background WIKI ENGINE User(s) makes changes in the presentations SENARIO 2 ODP FILE ODP – Open Document Presentation Java Plug-in Java Plug-in Web page MODIFIED OPD

10 9/23/2009 Step towards Milestones WIKI ENGINE User(s) makes changes in the presentations SENARIO 2 ODP FILE ODP – Open Document Presentation Java Plug-in Java Plug-in Web page MODIFIED OPD

11 9/23/2009 Step towards milestones - Development Plug-in to import slides as images in Wiki Engine Plug-in to import ODP file into Wiki Engine Plug-in to export the modified presentation in ODP format. Functionality to modify the presentation by means of XML Database design for comments and other data Functionality of reading XML and XSLT files.

12 9/23/2009 Step towards milestones - Development Plug-in to import slides as images in Wiki Engine Plug-in to import ODP file into Wiki Engine Plug-in to export the modified presentation in ODP format. Functionality to modify the presentation by means of XML Database design for comments and other data Functionality of reading XML and XSLT files. 30 % of total work

13 9/23/2009 Step towards milestones - Others Systems Design 10% Requirement Analysis 20% Testing 25% Documentation And others 10% Requirement Analysis 20% Testing 25% Requirement Analysis 20% Testing 25% Requirement Analysis 20% Testing 25% Systems Design 10% Requirement Analysis 20% Testing 25% Documentation And others 10% Systems Design 10% System Integration 5% effort Requirement Analysis 20% Testing 25%

14 Development methodology and Milestones Requirement Analysis Project Design Implementation Verification Release Iterative Waterfall Model (Iterations)

15 9/23/2009 Development methodology and Milestones 1 st Milestone Alpha release 27 th October 09 Development 2 nd Milestone Beta release 17 th November 09 3 rd Milestone Release Candidate 15 th December 09 Development Final Product 15 th January 10

16 9/23/2009 Deliverables DeliverableDate Project Plan2009-10-02 Requirements Definition2009-10-02 Design Description2009-10-09 Acceptance Test Plan2009-12-11 Test Report2010-01-11 Final Project Report2010-01-15 Final Product2010-01-15 Summary Week ReportDuring Project Minutes of MeetingDuring Project Revisions of existing documentsOn major changes

17 9/23/2009 Activity Plan Activity w38w39w40w41w42w43w44w45w46w47w48w49w50w51w52w01w02 Project Preparations Requirements Analysis and Definition Research and Development Project Design Input Plug-in Development User Interface Development Output Plug-in Development Core Logic Implementation Integration Unit Testing Integration Testing System Testing User Acceptance Testing

18 9/23/2009 Financial Plan Cost per hour = 33$ (assumption) Number of working days = 85 Activity Percentage effort to be utilized Effort required by 6 men Effort in person days Cost person hours assuming each person works 2 hours per day Project Preparations 54.2525.51683 Requirements Analysis & Definition 20171026732 Project Design 108.5513366 Implementation 3025.515310098 Integration 54.2525.51683 Testing 20171026732 Troubleshooting 32.5515.31009.8 Documentation 54.2525.51683 Final Release 21.710.2673.2 Total estimated cost = $ 33,660

19 9/23/2009 Project risks Limitation of time Communication gap Technical Knowledge Team Coordination Design Flaws Server Crash Wrong Technology Resources --- High Risk --- Medium Risk

20 9/23/2009


Download ppt "9/23/2009 NOTICE! These materials are prepared only for the students enrolled in the course Distributed Software Development (DSD) at the Department of."

Similar presentations