Presentation is loading. Please wait.

Presentation is loading. Please wait.

109-09-29 These materials are prepared only for the students enrolled in the course Distributed Software Development (DSD) at the Department of Computer.

Similar presentations


Presentation on theme: "109-09-29 These materials are prepared only for the students enrolled in the course Distributed Software Development (DSD) at the Department of Computer."— Presentation transcript:

1 109-09-29 These materials are prepared only for the students enrolled in the course Distributed Software Development (DSD) at the Department of Computer Science and Engineering, University of Mälardalen, Västerås, Sweden and at the Faculty of Electrical Engineering and Computing, University of Zagreb, Croatia (year 2009/2010). For all other purposes, authors’ written permission is needed! The purpose of these materials is to help students in better understanding of lectures in DSD and not their replacement! NOTICE!

2 209-09-29 Distributed Software Development

3 309-09-29 QR Marks the Spot@MdH Sriram Sundar Rajan Project Plan

4 09-09-29 4 Methodologies Use of iterative waterfall model

5 09-09-29 Deliverables ToOutputPlanned weekPromised week Project ManagerWeek Report from individual team members W38(2009) – W02(2010) Steering group, Project Team members Summary Week ReportW38(2009) – W02(2010) Steering group, Project Team members Minutes of MeetingW38(2009) – W02(2010) Steering group, Project Team members Technical Documents, Project policies W38(2009) – W02(2010) Steering group, Project Team members Project Vision DocumentW38(2009) Steering group, Project Team members Project Plan DocumentW39(2009)W38(2009) – W02(2010) Steering group, Project Team members Requirements Definition document W39(2009)W38(2009) – W02(2010) Steering group, Project Team members Design Description Document W40(2009) Steering group, Project Team members Acceptance Test PlanW49(2009) Steering group, Project Team members Test ReportW02(2010)W38(2009) Customers, Steering group, Project Team members Final Project Report, Final versions of all project documents W02(2010)W38(2009) – W02(2010) Customers, Steering group, Project Team members Final Product (Installation, Source Codes) W02(2010)W38(2009) – W02(2010)

6 Milestones 09-09-29

7 7 Activity Plan

8 809-09-29 Financial Plan

9 909-09-29 Project Risks Software fails to address the core purpose Choice of inappropriate technology Problems in Integration of the modules Communication Issues Any member leaving the team System Failure or Server crash


Download ppt "109-09-29 These materials are prepared only for the students enrolled in the course Distributed Software Development (DSD) at the Department of Computer."

Similar presentations


Ads by Google