2 UNCLASSIFIED Roll Call CDS-7 State Dept – Mr. Weinz USNS MERCY AUS HQ JOC HQ JFNZ JSDF FLC-Yokosuka C7F C3F CTF 76 351 st Civil Affairs Command DLA Troop Support - Pacific ETG 30 th NCR HSC-21 DET 2 MCAST Blue: Normal participants not expected to attend VTC due to scheduling conflict.
3
3 UNCLASSIFIED PP 12 Weekly Planning Rhythm ThursFriSatSun 1300-1500W OPT VTC 1100W read ahead slides posted to APAN 1000W CA WG 1300W LOG WG 1200W MED WG 1300W FP WG Every other week MonTuesWed 1000W COMMS WG 1430W Comm Integration WG CPF N3 Semi-Monthly Update 1200W ENG WG Effective 09 JAN
4
4 UNCLASSIFIED SEPOCTNOVDECJANFEBMARAPRMAYJUNJULAUG Mission Planning/CONOPS (CPF) Meetings/Conferences (CPF/CDS) Force Sourcing (CPFN3) Interagency Coord (CPF N5) NGO Coordination (CPF N5) Partner Nations (CPF N5/C7F) Final Transit Plan (CDS) Funding/Auths (CPF N5/N00F) Communications (CPF N6) Assessment (CPF MAG) Detailed CONOPS (CDS) PDSS/Advanced Echelon (CDS) Deployment (CDS) Planning Timeline Advanced Echelon Deployment MOU Letters Signed Assessment plan EXORD Systems CPF RFF Mid Planning Conference Initial Planning Conference Initial PLANORD PDSS FSLO Letter Final Requirements PN Invitation letters
5
5 UNCLASSIFIED ADF Planning Status General Planning CJOPS Decision Brief for PP12 signed. Command Nomination of O-5 for position of COMASC submitted. Call for nominations for ASNCE staff sent via signal. Engineering Two (2) ADF engineers participated in Indonesia PDSS. Still awaiting Post Activity Report. Authorization to lead as FIE for Indonesia mission still to come from IPDIV. Medical Awaiting nominations for ADF Health PP12 positions from Services. No Change
6
6 UNCLASSIFIED ADF Participation Australia Command Element Engineering Section Medical Personnel contribution of 15 – 20 pers in each contingent Contingent 1 embark USNS MERCY in Guam and change out in Subic Bay Philippines Contingent 2: embark USNS MERCY in Subic Bay Philippines and disembark at the conclusion of mission in Cambodia Health manning TBC in late November HQJOC Health PP12 POC: CMDR Kenneth Walters (SO1 Reg / Dom & Joint Ex Hlth Plans) kenneth.walters@defence.gov.au kenneth.walters@defence.gov.au No Change
7
7 UNCLASSIFIED PP12 RFI Tracker NumberStatusDate ReqResponsibleQuestionOther ADF-001Closed11 Nov 11PACFLTRequest a copy of the Indonesian PDSS itinerary ADF-002Open11 Nov 11PACFLTStatus of Partner Nation invitation letter No Change
8
8 UNCLASSIFIED JSDF Planning Status CONOPS of Japan - Developing the CONOPS of Japan Country selection - Philippine - Vietnam Activities - Medical supports - Community service projects Introduction of culture etc. - Studying other activities Vehicles - JMSDF Ship (LST “OOSUMI” CLASS x1) - JASDF Aircraft ( C-130 or KC-767× 1) Medical team - Approximately 20~30
9
9 UNCLASSIFIED JSDF Planning Status PDSS -Re-survey Philippines with U.S. member in MAR 5 ~ MAR 9 Humanitarian community in Japan - Not yet access(will recruit on Middle of FEB) POC - PLANNING PRI: LCDR Haga : j3haga@jso.mod.go.jp DSN:224-7714 or 7723 SEC: LCDR Yamaguchi : j3yamaguchi_m@jso.mod.go.jp - MED PRI: CDR Hayashizaki:j4hayashizaki@jso.mod.go.jp SEC: MAJ Yamasaki:j4yamasaki@jso.mod.go.jp - PA CDR Maeyama: j1maeyama@jso.mod.go.jp
10
10 UNCLASSIFIED JSDF Planning Status NumberStatusdateWGRequests/QuestionsComments JPN -001 19 OCTPDSS Draft plan of PDSS in Philippine and Vietnam JPN-002 30 NOVPDSS Req. re-survey with US survey member in FEB or MAR. JPN-003 8 FEBOPS MERCY's arrival/departure port time at Calbayog and Vinh JPN-004 8 FEB CMO 1day seminar' s date,location,participant
11
11 UNCLASSIFIED NZDF Planning Status No Change NZDF will deploy a multi-disciplinary team of 8 personnel for the duration of the deployment to Vietnam 10 – 24 Jul 12. Exact composition is to be finalised in due course but likely to be as follows with specialties to be advised: 2 x Health Planners 1 x Medical Officer 1 x Nursing Officer 1 x Dentist or Dental Hygienist 2 x Medics 1 x Environmental Health Officer Outline SOM: - Embark USNS MERCY in Subic Bay, Philippines on or prior to 6 July 12. - Conduct tasks as personnel embedded into appropriate health capability bricks. - Disembark at conclusion of Vietnam mission. - RTNZ via either Hanoi or Ho Chi Minh City.
12
12 UNCLASSIFIED CPF FOPS Update -NTR
13
13 UNCLASSIFIED Medical Update Medical WG Telcon held Tuesday, 24 January 2012, 1200 hrs LT JG Ward to attend MPC and stay to assist with Medical CONOPS development –Funding provided by CPF and MERCY Medical assessment to Philippines is GTG Per ODC during 1/24 telcon, medical assessment to Cambodia rescheduled –26 March – 3 April No Change
14
14 UNCLASSIFIED Engineering Update Site Survey Projects RecommendedSMEE Request Philippines3 schools & 1 medical clinicSeawall-Dr. Lin Cambodia3 health centersBldg; P&E; CCAD Indonesia3 health centers & 1 schoolSeismic; Disaster Vietnam2 health centersDisaster; Safety Philippine Project Package preparation (ACB1 lead) Cambodia Project Package preparation (NMCB40 lead) Indonesia Project Package preparation (ADF lead/NMCB40 Alt) Vietnam Project Package preparation (NMCB40 lead) Completed On-trackOff-Track/RecoverableOff-Track not recoverable
15
15 UNCLASSIFIED Logistics Update Logistics WG held 7 Feb 12 Logistics support plan(s) in progress Funding –APRI MTF MERCY received $900K; DLA in receipt of $200K; total required $1.9M Pharmaceuticals and Consumables –DLA placing initial orders Donation Material (No Change) Next Logistics WG meeting scheduled for 14 Feb 12
16
16 UNCLASSIFIED PP12 Supply and Logistics Status FUNDING (17JAN12) 16 CompletedOn-trackOff-Track/RecoverableOff-Track not recoverable Item / TaskStatusActionDate ReqNotes APRICPF/ SUPPO 31JAN12 - APRI ($1.1M of $1.9M required received) ORFC7F/ CDS-7/ SUPPO 07FEB12 - ORF plan developed - Draft message request in progress OCOCPF/ SUPPO 15APR12 - Requirements data forwarded to CPF - Review in progress
17
17 UNCLASSIFIED Item / TaskStatusActionDate ReqNotes Indonesia Load List SUPPO 03FEB12 - Load list developed pending MPC update(s). - Final pharmaceutical list forwarded to FLC Yokusuka contracting for contract award determination - DLA commencing initial purchase of standard consumable items Philippines Load List SUPPO 03FEB12 - Load list developed pending MPC update(s) - Standard pharmaceutical items requisitioned - DLA commencing initial purchase of standard consumable items Vietnam Load List SUPPO 03FEB12 - Load list developed pending MPC update(s). -Final pharmaceutical list forwarded to FLC Yokusuka contracting for contract award determination - DLA commencing initial purchase of standard consumable items Cambodia Load List SUPPO 03FEB12 - Load list developed pending MPC update(s) - Standard pharmaceutical items requisitioned - DLA commencing initial purchase of standard consumable items 17 Completed On-trackOff-Track/RecoverableOff-Track not recoverable PP12 Supply and Logistics Status PHARMACEUTICALS and CONSUMABLES (17JAN12)
18
18 UNCLASSIFIED Item / TaskStatusActionDate ReqNotes Load PlanMSC/ SUPPO 31JAN12- Load plan developed pending MSC MERCY approval - 240 pallet maximum established Project Handclasp SUPPO 15MAR12- Preparations ongoing with POC LDSSUPPO 15FEB12- Preparations ongoing with POC Worldwide VETs SUPPO 15MAR12- Preparations ongoing with POC 18 Completed On-trackOff-Track/RecoverableOff-Track not recoverable PP12 Supply and Logistics Status DONATION MATERIAL (17JAN12) NO CHANGE
19
19 UNCLASSIFIED Item / TaskStatusActionDate ReqNotes IT & Radio Operator Manning CPF N3/ CDS / 01MAR12 -Each MEDCAP : 1-IT (HEIS) TBD - JCSE IEP (3 ea +OIC= 7 pers ) approved 05DEC - 4+Remote MEDCAP manning assignment by name -Determine USMC radio operator availability Annex K / COMM Plan CPF/ C3F/CTF -76/CDS 15MAR12 - IAW NTTP 3-57 Navy HCA OPS and NWP 3-29 -Country CIS inventory and CONOPS Plan developed at MPC. -OPTASK COMMS will include daily plan based on CONOPS and Japanese ship COMMs capability BGAN SATCOM CPF N6/ CDS POST- MPC - Not required for PDSS. (17OCT11 CDS-7 N6 email). - OPTEST CPF BGANs (FEB12). - Develop CONOPS for BGAN use. Host Nation Spectrum Mgt C7F/CTF -76 /CDS 01MAR12 - Awaiting C7F response to CDS-7 01FEB request for frequency assignments and restrictions for each host nation. 19 Completed On-trackOff-Track/RecoverableOff-Track not recoverable PP12 CIS Information Systems Status (08FEB12)
20
20 UNCLASSIFIED Item / TaskStatusActionDate ReqNotes PAO NetworkCPF PAO/N6 / CDS/ MERCY 30MAR12 -Defense Video & Imagery Distribution System (DVIDS) : PAO confirmed system is available. Ashore use only. - Verified Fast File Transfer (FFT) SW (version 2.43) Installed in MERCY. FFT ATO pkg in development at DMA. PAO assist in progress PN-NGO Business Center (SSC LANT CHARLESTON) CPF N6 / CDS /MERCY APR12 -SPAWAR PN-NGO Business Center (Wireless and terminals) is the afloat solution. -MERCY to coordinate refresh/OPTEST/training in San Diego by SPAWAR. SOW in development (09JAN12). - CDS procure printer consumables for entire mission. -IA/business rules provided CDS-7 N6 03NOV11. Partner Nation Interoperability CPF N6 / CDS POST- MPC -Verify Partner Nation (PN) CIS POCs. -Verify APAN accounts for all PN CIS WG team members. -PN CIS capability review. -Develop CIS Interoperability Matrix in Annex K. Health Engagement Information System (HEIS) CIS WG/ CDS N6 TBD -HERS funded by MARFORPAC Experimental Center (MEC) is not available -MEDCAP information collection requirements being verified by CPF N01H -CIS and Medical WG reviewing alternatives. 20 Completed On-trackOff-Track/RecoverableOff-Track not recoverable PP12 CIS Information Systems Status (08FEB12)
21
21 UNCLASSIFIED Item / TaskStatusActionDate ReqNotes Remote MED- DENCAP /CC Comms Arch CDS / CPF PRE- MPC -Draft CIS Element architecture and inventory under review at CDS-7 (20JAN12) -Completed at MPC. Host Nation MIL C4 PDSS OIC PDSS AAR -PDSS OICs for assessment action. -Training provided to Blue Team 21OCT11. Host Nation CIVIL Comms PDSS OIC PDSS AAR -PDSS OICs for assessment action. -Training provided to Blue Team 21OCT11. Remote Site US Mission CIS Assessment PDSS OIC/ AOIC PDSS AAR -JCSE Planner not included in PDSS. PDSS AOIC to conduct assessments with provided checklists and guidance. -Command Center (CC) Comms assessment. -Training provided to Blue Team 21OCT11. PDSS CIS Comms CPF/ CDS PDSS OICs PRE- PDSS -Iridium Phones: CPF N6 issued phone to Blue OIC. -In country cell phones: MERCY to provide from PP10 mission phones. -Automated Data Collection (8 cell phones app) issued to OIC. 21 Completed On-trackOff-Track/RecoverableOff-Track not recoverable PP12 CIS Information Systems Status (08FEB12)
22
22 UNCLASSIFIED Item / TaskStatusActionDate ReqNotes Knowledge Management /Data Protection CDS/ MERCY TBD -MEDCAP/CDS/Mission Data storage and protection Command Center Ashore CIS CDSPDSS AAR -Identify configuration and location in each country. -Completed at MPC IT SMEE Requests CDSPDSS AAR -PDSS determine scope (SYSADMIN, repair, training, etc.). -No IT SMEE were requested by the host nations SATCOM Requests C3F/ C7F/ CDS FEB12 -Standard USN process. Mission COMMs Readiness CDS / MERCY APR12 -Pre-deployment COMM Checks (DVIDS, FTP, FFT, NMCI FAS, MERCY COMMs Suite) 22 Completed On-trackOff-Track/RecoverableOff-Track not recoverable PP12 CIS Information Systems Status (08FEB12)
23
23 UNCLASSIFIED Item / TaskStatusActionDate ReqNotes FSET on MERCY CPF / MSC 13APR12 - Field Service Engineering Team (FSET) rqmt for San Diego to Guam cost estimate from SPAWAR received 11JAN12. SD-Guam ROM receiverd 25JAN12.. -Funding transfer to SPAWAR in progress. End of Mission CIS Exit Plan CPF/ CDS TBD - Hardware: Transfer custody of loaned CIS items back to CPF -Data Exit Plan: TBD VHF Handheld Radios CPF/ CDS FEB12 -CDS determine required quantities ADVON CISCDS MAR12 -Requirements determined at MPC. Under review at CPF N6/N3 Embarked Documentary Team CDS Ongoing -CDS determine requirements and set expectations -Afloat connectivity limited to NGO Business Center 23 Completed On-trackOff-Track/RecoverableOff-Track not recoverable PP12 CIS Information Systems Status (08FEB12)
24
24 UNCLASSIFIED Force Protection Update C7F Tasking to MESG-1 Det Guam/MSRON-7 USMC possible sourcing continues Continued refinement of FP plans Pre-Deployment travel Requirements –Updated ISOPREPs –APACS –iATP –AOR location specific brief –Level I ATFP –SERE 100 B
25
25 UNCLASSIFIED Item / TaskStatusActionDate Req Notes CJ-CMCC Concept Paper Dev CPF N5 15 FEB -Awaiting chops from MTF - Chops received and incorporated from DESRON, PP 09, 10, 11 reps, COE-DMHA (IHC) -CMCC concept document inputs received during MPC TTX. -CMCC Personnel ID by name NLT 15 FEB CMCC Battle Rhythm Sych DESRON19 JAN - Inputs submitted to DESRON. Non-Medical SMEE CONOPS Draft Plan CAWG23 JAN -Complete - Plan details will continue to be added, as possible, between now and ADVON deployment. However, CONOP finalization will not occur until ADVON. Operational Assessment Plan CAWGMAR 12 - Assessment WG has produced draft task list which will be socialized and refined during WGs. -Geared toward MOPs Strategic Assessment Plan CAWGAPR 12 - Geared towards Theater Strategic Objectives NGO and Partner Nation Engagement Process CAWG / CPF N5 MPC - 80% plan post MPC but add-ins will be ongoing. CAWG Update (08 FEB)
26
26 UNCLASSIFIED Projected Host and Partner Nation Participation by Port Host / Partner Nation Material / Platform Support Personnel Participation by Port SDHIGUIDRP VNKMGUHISD POC IndonesiaFP, Engineers, Medical LCDR Chris Giacomaro GiacomaroCM@state.gov Philippines FP, Engineers, Medical LCDR Scott Alms AlmsSC@state.gov Vietnam FP, Engineers, Medical LTC Wayne Turnbull TurnbullPW@state.gov Cambodia FP, Engineers, Medical LTC Kristin Means MeansKA@state.gov MeansKA@state.gov Australia Lead for ID Engineer FIE Medical 15-20 PAX Engineer Section CMDR Kenneth Walters: kenneth.walters@defence.gov.au SQNLDR Owen Gardner, owen.gardner@defence.gov.au. Canada Medical/Dental 9 May 15 Pax 4 July 15 Pax 4 Sep CAPT Lee Gagne LEE.GAGNE@forces.gc.ca Japan JMSDF Ship Aircraft (C-130 or KC-767) Medical Team: 20-30 pax LCDR Haga : j3haga@jso.mod.go.jp j3haga@jso.mod.go.jp LCDR Haga : j3haga@jso.mod.go.jp j3haga@jso.mod.go.jp New Zealand8-12 PAX Medical Team MAJ Andrew Brooks andrew.brooks@nzdf.mil.nz SingaporeMedical team Major Chow Weien: CHOW_Weien@starnet.gov.sg Thailand Medical, Engineers and CA LCDR Jason Starmer starmer@jusmagthai.org starmer@jusmagthai.org Chile 1 Pax Medical 5 July 24 July LCDR Julian Maldonado Julian.maldonado.cl@navy.mil
27
27 UNCLASSIFIED Projected NGO Participation by Port NGO Expected Contribution Personnel Participation by Port SDHIGUIDRP VNKMGUHISD POC UCSD PreDental Society Dental, Translators Dr. Irv Silverstein: 619-840- 3288 dsilverstein22@cox.net LDS CharitiesMedical Dr Susan Puls: PulsSu@ldschurch.org Mr. Fred Riley: RileyFM@LDSChurch.org 801-240-8580 Project Hope Medical Mr. Matt Petersen: mpeterson@projecthope.org 540-467-5524/ 540-837-9554 Hope World Wide Translators for Indonesia (awaiting number required from DESRON ) Mr. Charles Ham: charles_ham@hopeww.org Office: 62-21-600-9091 Project Handclasp TBD Mr. Paul Brown / Lt Aron Rotklein: aron.rotklein@navy.mil 619- 532-1492 Vets Without Borders TBD Dr Thomas Graham: tgraham@dcn.davis.ca.us Office 916-769-3696 World Vets TBD Dr Katie Horn: animalloverkate@gmail.com 509-290-0509 / 505-8949- 4093 University of Hawaii Medical, Engineers UNCLASSIFIED
28
28 UNCLASSIFIED Projected NGO Participation by Port NGO Expected Contribution Personnel Participation by Port SDHIGUIDRP VNKMGUHISD POC EWC TBDVricella, Gene VricellG@EastWestCenter.org VricellG@EastWestCenter.org VMAP 5 doctors fluent in Vietnamese and translators Nguyen K. Nguyen President of VNMAP Program nguyen.nguyen@vnmap.org Global Grins Donation of toothbrushes EWOB Engineers UNCLASSIFIED
29
29 UNCLASSIFIED PP12 APRI/OHDACA Status: 17JAN11 PP12 PACOM approved APRI budget$2,500,000.00 APRI Expended by PACFLT$727,786.25 APRI on-hand at PACFLT$522,213.75 APRI remaining at PACOM$1,250,000.00 Total APRI Remaining $1,772,213.75 PP12 PACOM Tentative OHDACA budget$912,000.00 OHDACA Expended by PACFLT$0.00 OHDACA on-hand at PACFLT$0.00 OHDACA remaining at PACOM$912,000.00 Total OHDACA Remaining$912,000.00 APRI Summary OHDACA Summary
30
30 UNCLASSIFIED Public Affairs Update -Admin NSTR -Media Coordination NSTR
31
31 UNCLASSIFIED Public Affairs Update Item/TaskStatusActionSuspense Date Notes PAGCDS PA CPF PA TBD Draft to CDRE 15 DEC Routing will happen D-30 to 45 days DC media trip/mission announcement NSCDS PAAPR 2012 PP Fact SheetCDS PA, CPF PA 30 DEC Mission info to NAVINFO WEST for vetting Smartphone SOP NSCIWG, CPF Social Media 15 MAR Online presence brief CDS PA, CPF PA 9 DEC Social media, websites, etc 31 Completed On-trackOff-Track/RecoverableOff-Track not recoverable
32
32 UNCLASSIFIED Public Affairs Update Item/TaskStatusActionSuspense Date Notes Equipment requirements CDS PA, NPASE TBD Dialogue initiated w/ MERCY on 04 JAN PO&AM inputsCDS PA, CPF PA 14 DEC Due to FOPS. PA-specific updates in progress Media Training Plan CDS PA TBD Training to CDS leadership and mission participants COMREL purchase list CPF PA TBD Will route final list after SLV feedback from PAO 32 Completed On-trackOff-Track/RecoverableOff-Track not recoverable
33
33 UNCLASSIFIED PP12 Communication Integration Finalized products to support detailed communication planning and assessment for each location Identified initial list of communication “products” at MPC Coordinating communication assessment support for PP12 (MAY – SEP 12) Next CIWG meeting scheduled for: 09 FEB 12 AMEMB Cambodia, Vietnam Telecons – AMEMB Cambodia dialed into 26 JAN CIWG – Additional telecon to be conducted during LCDR Lohmeyer’s visit (SLV)
34
34 UNCLASSIFIED PP12 Communication Integration 34 CompletedOn-trackOff-Track/RecoverableOff-Track not recoverable Item / TaskStatusActionDate ReqNotes Stakeholder Analysis CIWG15 NOV - Initial product completed. Briefing with Commodore Morgan scheduled for early Dec. Characterize Information Environment CPF N2/N39 15 NOV – 30 JAN -Political Military Economic Social Infrastructure and Information (PMESII) product status is as follows: Cambodia 100%, Indonesia 100%, Vietnam 100%, Philippines 100%. Communication Strategy/ Implementation Plan CPF N2/N39 31 DEC - This product will detail integrated approach for internal, external messaging. This product will be a draft until finalized as an Annex to the CPF PP12 Campaign Plan. Identify/Coordinate key messaging events CIWG15 JAN - Identified; coordinating CIWG support: -- ETG Leadership Training -- MPC Assessment planning -- SLV support Develop messaging products CIWG/ CPF N2/N39, PA 15 APR - Identified initial information products to support mission execution. Researching feasibility, and working with mission SMEE coordinators to ID additional requirements; coordinating with PACOM, SOCPAC, USARPAC, in-country teams.
35
35 UNCLASSIFIED PP12 Communication Integration 35 CompletedOn-trackOff-Track/RecoverableOff-Track not recoverable Item / TaskStatusActionDate ReqNotes Develop communication MOE Indicators CIWG/ N2/N39 15 JAN - Draft indicators developed as part of overall PP12 assessment effort. Define Communication assessment methodology CPF N2/N39 30 JAN - Completed communication assessment framework and methodology for incorporation into overall PP12 assessment effort. Coordinate and monitor communication during execution CPF N2/N39 During PP12 - Identified initial monitoring requirements, resources and tools to support communication assessment, such as media analysis. Conduct communication assessment CIWGDuring PP12 - Not started. Develop AARCPF N2/N39, PA 30 SEP - Not started.
36
36 UNCLASSIFIED 36 Host Nation Opening Ceremonies Dates Visiting FO/GO (Service) Closing Ceremonies Dates Visiting FO/GO (Service) Indonesia: North Sulawesi31 May 201215 June 2012 Philippines: Samar18 June 201201 July 2012 Vietnam: Vinh10 July 201224 July 2012 Cambodia: Sihanoukville28 July 201211 August 2012 Flag Engagement Plan
37
37 UNCLASSIFIED 37 Planning Timeline UPDATED: 08FEB12 INDICATES UPDATE
38
38 UNCLASSIFIED Mission Commander Priorities Country CONOPS Development –10FEB: MPC draft posted to APAN (incorporates changes from MPC) –10FEB: CONOPS addendum shell provided; provides next level of tactical planning guidance –17FEB: CONOPS addendum updates due to CDS7 from planning leads –TBD: CONOPS Annex updates due to CDS7 ADVON Composition / Notification –10FEB: initial coordination e-mail sent to proposed participants from CDS7 N3 for final verification Voyage Planning –In progress on MERCY –SOM for initial 2 PVSTs may shift 1 day to left to prevent overtime in Pearl/Guam (currently sked for Saturday departures from both); no effect on mission ports –Voyage planning to include RAS dates MRX Planning –15FEB: Stakeholders provide input to CDS7 N3 on objectives / participation
39
39 UNCLASSIFIED Mission Commander Priorities (continued) Pre-deployment Briefings –02APR 1630 PST (030030ZAPR12) – CTF76 (VTC) –TBD – C3F –TBD – C7F –TBD – CPF Maritime Operations Center (MOC) / MOC Beach Det –Watchfloor on MERCY and ashore –Products in development: SORM PPRs Checklists Watchbill PP12 Mission Planning Rhythm –In development
40
40 UNCLASSIFIED Closing Questions/Comments CPF Staff State Dept – Mr. Weinz AUS HQ JOC HQ JFNZ JSDF FLC-Yokosuka C7F C3F CTF 76 351 st Civil Affairs Command DLA Troop Support - Pacific 30 th NCR ETG HSC-21 DET 2 MCAST USNS MERCY CDS-7
41
41 UNCLASSIFIED 41 BACKUPS
42
42 UNCLASSIFIED Contact List Working Group CPF MedicalMr. Dean Tano 808 471 2463 dean.tano@navy.mil LogisticsLCDR Tim Graham 808 474 7814 timothy.graham@navy.mil CommsMr. Mike Gurath 808 474 6382 michael.gurath@navy.mil Force Protection Capt James McKeon 808 471 8229 james.mckeon@navy.mil Comm Integration CDR Ingrid Rader ingrid.rader@navy.mil Working Group CPF EngineeringMr. Gary Basham 805 982 6102 gary.basham@navy.mil Civil AffairsLCDR Ric Arthur 808 474 4458 richard.c.arthur@navy.mil Public AffairsLT Lauren Gammache lauren.gammache@navy.mil 808 471 3769 Country Desk RP, CB, VN LCDR John Rios 808 474 9633 john.j.rios@navy.mil Country Desk ID Mr. Takashi Yamamoto 808 4746912 takashi.yamamoto@navy.mil 42
43
43 UNCLASSIFIED Contact List ORGContact CPFLCDR Rob Hulse 808 474 8526 robert.g.hulse@navy.mil CPFLCDR Dave Leather 808 471 8661 David.leather@navy.mil CPFCDR Joyce Blanchard 808 474 6954 joyce.blanchard@navy.mil C3FMAJ Sean Williams 619 767 4803 sean.p.williams@navy.mil C7FCDR Tom Long thomas.long@lcc19.navy. mil ORGContact CTF-76LTJG Joel Hammen joel.hammen@fe.navy.mil AUSSQNLDR (O4) Owen Gardner +612 6128 4027 owen.gardner@defence.gov.au JPNLCDR Haga j3haga@jso.mod.go.jp NZMAJ Andrew Brooks DDI: +64 4 529 6124 Andrew.brooks@nzdf.mil.nz 43