1 State Project Office Shiksha Sankul, Mayur Vihar, Sahstradhara Road, Dehradun

2 ZoneIV Tehri Dehradun Haridwar Nainital Champawat U.Singh Nagar Pauri Almora Zone V Chamoli Rudraprayag Bageshwar Pithoragarh Uttarkashi Pauri Almora SEISMIC ZONE

3 . Seismic Zone India and Uttarakhand

4 YearType of SchoolTotal 2007-08Primary229 2007-08Upper primary150 2007-08Additional Class Rooms (PS & UPS) 369 2008-09Primary217 2008-09Upper Primary254 2008-09Additional Class Rooms (PS & UPS) 900 Number of major Civil Works

5 School designs were prepared by C.B.R.I Roorkee. as per availability of land and sites. C.B.R.I took measures for earth quake resistance designs. Training regarding construction work was /is being imparted to… 1-Three days training to D.P.Os at CBRI campus with illustrative demo. in labs & lab areas. 2-Five days training to A.Es & J.Es by experts from G.B.Pant University of Agriculture & Technology Pantnagar. 3-One day training to the concerned VEC members. 4-On side support to the masons. Training & Designs

6 Implementing Agency &Supervisory Staff.  All type of construction works are undertaken by VEC.  For technical support, one Junior Engineer is deputed at each block and one Assistant Engineer for district.At state level a team of engineers comprising one Executive Engineer with two Junior Engineers are to monitor civil works.  Besides this, a civil work co-ordinator is appointed at state level for better co-ordination among the stake- holders.

7  G.O.I guidelines  To maintain quality of civil works.  To assure the standard quality of construction material and to obtain independent assessment of the technical quality of civil works.  To motivate and train VECs.  To highlight the problem area and to suggest step/solutions to achieve overall quality assurance.  Periodical supervision of physical progress for completion of works in schedule time frame. Third Party Evaluation of Civil Works

8 For this job MoU was singed with C.B.R.I because of… 1- National wide reputed institution. 2- Easy to access. 3- World class laboratory. 4- Expertise in the field of technical evaluation and quality assurance of building construction. 5- Vested with the responsibility of generating, cultivating and promoting building science and technology in the service of the country. 6- Finding timely, appropriate and economical solutions to the problem of materials, efficiency, structural and foundation problems and disaster mitigation. Engaging C.B.R.I. for TPE

9 Budgetary Provision Total No. of 2119 Civil Works to be evaluated. Total amount to be paid to CBRI Rs. 93.50 lacs. Amount is released to CBRI on installment basis:- 1-Rupees Twenty Five lakhs + Service Tax. along with acceptance of this MoU. 2-Rupees Twenty Five lakhs + Service Tax after six month and submission of first interim report of schools inspected during the last six months 3-Rupees Twenty Five lakhs + Service Tax. after twelve months and submission of second interim report. 4-Rupees Eighteen lakhs & Fifty Thousands + Service Tax. after eighteen months and submission of final report. The final report will contain all inspections and interim reports.