GIS: Improvements to DNR Permitting and Floodplain Management Lacey Duncan May 2012
2
Improvements in 2011 DNR Permitting – Public Freshwater Lakes Floodplain Analysis / Regulatory Assessment (FARA) Maps LiDAR/Orthoimagery Availability
3
Public Freshwater Lake Permits IC 14-26-2 Lake Preservation Act *Underwater Beaches **Seawalls Dredging Boatwells Group Piers Fish Attractors Aerators *Shoreline classification required **Shoreline delineation and classification required
4
Year Permits Inspected 201156% 201057% 200967% 200868% 200773% 200673% 200577% 200488% 200393% 200296% 200193% Rule Changes Improved research capabilities Triage Overall Development on PFL Inspection Reduction General License Unity Database Triage 2000 1999 2005
5
Transfer of Inspections to Central Office 2000-2010 1 field inspector 2011 8 inspectors Creation of 3 Regions
6
Total Public Freshwater Lake Permits Region 3Region 2Region 1
7
Lake Inspections
8
Old Method of Shoreline Delineation Triangulate every measurement – Required 3 measurements for 1 shoreline break Final sketch skewed without compass IntelliCAD 2000
9
Old Method of Shoreline Delineation
10
Lake Inspection Need Efficient data collection prior to inspection Decrease time in field Little commitment in office upon return Keep re-inspections to a minimum Improved quality product for customer Research site Conduct inspection Complete final sketch
11
Inspection Preparation Prepare lake sketch – Identify 250’ range for site Locate staff gage and legal lake level data Research relevant permits – Shoreline Classification – Permitted Seawalls – Unresolved Violations
12
Inspection Preparation Permit Application
13
Inspection Preparation Using routefinder 9:31 Total Travel Time 5:45 Drive Time
14
Final Lake Sketch
16
Long Lake Sketch West East Old Method New Method Breaks in Shoreline 18 Tie Points Needed 7254
17
Floodplain Analysis and Regulatory Assessment (FARA) A thorough approach to the response letter – Connect the FARA to the legend in the map – Address floodway and flood insurance – Electronic signatures – Emailed Response
18
Old Method
19
Pre-DFIRM
20
The Driving Forces April 2012 32 Counties March 2011 11 Counties New Floodplain Mapping Electronic Submittals
21
INdiana Floodplain Information Portal
22
New DFIRM
23
New FARA Format
24
Development of the.mxd Getting the Shapefiles – Published Special Flood Hazard Area – Preliminary Special Flood Hazard Area – Ohio River Floodway Improving the Process – Using the DFIRM Political Areas to determine local Floodplain Administrator Developing the map language
25
The.mxd
26
DNR Floodplain Map Zone AE/Floodway
27
DNR Floodplain Map Zone A
28
2011 LiDAR and Orthoimagery New Imagery for DNR Floodplain Map and Lake Sketches Increasing Hydraulic Ratings 20112005
29
3D Analyst 2011
30
Improving the Accuracy of the FARA 2005
31
Improving the Accuracy of the FARA 2011 2005
32
Increasing Elevation Determinations Total Number Year No Elevation Data Send Cross Section Letter Property Owner Hires Surveyor Submits Survey to DNR DNR sends FARA
33
Lacey Duncan lduncan@dnr.in.gov